EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 626 pages. Available in PDF, EPUB and Kindle. Book excerpt: Semiannual, with semiannual and annual indexes. References to all scientific and technical literature coming from DOE, its laboratories, energy centers, and contractors. Includes all works deriving from DOE, other related government-sponsored information, and foreign nonnuclear information. Arranged under 39 categories, e.g., Biomedical sciences, basic studies; Biomedical sciences, applied studies; Health and safety; and Fusion energy. Entry gives bibliographical information and abstract. Corporate, author, subject, report number indexes.

Book Cultural Resources Assessment of the Kenetech Windpower s Washington Windplant No 1 Project  Klickitat County  Washington  Appendix D to Washington Windplant No 1 EIS  Draft Report

Download or read book Cultural Resources Assessment of the Kenetech Windpower s Washington Windplant No 1 Project Klickitat County Washington Appendix D to Washington Windplant No 1 EIS Draft Report written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 728 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Washington Windplant No 1  115 Megawatt Windpower Project  Klickitat County

Download or read book Washington Windplant No 1 115 Megawatt Windpower Project Klickitat County written by and published by . This book was released on 1995 with total page 342 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Proposed Columbia Wind Farm No  1

Download or read book Proposed Columbia Wind Farm No 1 written by and published by . This book was released on 1995 with total page 255 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

Book Proposed Columbia Wind Farm  1

Download or read book Proposed Columbia Wind Farm 1 written by Conservation and Renewable Energy System (Firm) and published by . This book was released on 1995 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: "Conservation and Renewable Energy Systems (CARES) proposes to construct and operate the 25-megawatt (MW) Columbia Wind Farm No. 1 (proposed Project) in the Columbia Hills area, so.utheast of Goldendale, in Klickitat County, Washington. The Project would be constructed on private lands leased from the property owner, Columbia Aluminum, Inc. The proposed Project would require a Conditional Use Permit from Klickitat County, Washington, and a Power Purchase Agreement between the Bonneville Power Administration (BPA) and CARES. An Environmental Impact Statement (EIS) for the proposed Project is required under both National Environmental Policy Act (NEPA) and State Environmental Policy Act (SEPA) guidelines"--page i.

Book Synerjy

Download or read book Synerjy written by and published by . This book was released on 1996 with total page 618 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Proposed Columbia Wind Farm No  1

Download or read book Proposed Columbia Wind Farm No 1 written by and published by . This book was released on 1995 with total page 200 pages. Available in PDF, EPUB and Kindle. Book excerpt: CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Projects̀ construction and operation would include: install concrete pier foundations for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m2 steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.

Book A Cultural Resources Survey of the Bonneville Power Administration s Proposed Klickitat County Wind Conversion Unit  Klickitat County  Washington

Download or read book A Cultural Resources Survey of the Bonneville Power Administration s Proposed Klickitat County Wind Conversion Unit Klickitat County Washington written by Joseph M. Studer and published by . This book was released on 1982 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Proposed Columbia Wind Farm No 1  Joint NEPA

Download or read book Proposed Columbia Wind Farm No 1 Joint NEPA written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: