EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double shell Tanks

Download or read book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double shell Tanks written by and published by . This book was released on 1999 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document facilitates the ultrasonic examination of Hanford Double-Shell Tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work (SOW) for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptances criteria be discovered.

Book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks   FY 2001

Download or read book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks FY 2001 written by and published by . This book was released on 2000 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities, plan for performance demonstration testing, and a plan for field activities. Also included are a Statement of Work for contractor performance and a protocol to be followed should tank flaws that exceed the acceptance criteria are found.

Book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks  DST  FY2002

Download or read book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks DST FY2002 written by and published by . This book was released on 2001 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), a plan for performance demonstration testing, and a plan for field activities (tank inspection). In addition, a protocol to be followed should tank flaws that exceed the acceptance criteria are found is included.

Book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks  DST  FY2000

Download or read book Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks DST FY2000 written by and published by . This book was released on 2000 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

Book Double shell Tank Ultrasonic Inspection Plan

Download or read book Double shell Tank Ultrasonic Inspection Plan written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Ultrasonic Examination of Double Shell Tank 241 AP 102  February 2005

Download or read book Ultrasonic Examination of Double Shell Tank 241 AP 102 February 2005 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-102. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-102 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-22571 (Jensen 2004) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.

Book Data Management Plan for the Ultrasonic Inspection of the Double shell Tanks

Download or read book Data Management Plan for the Ultrasonic Inspection of the Double shell Tanks written by and published by . This book was released on 1994 with total page 7 pages. Available in PDF, EPUB and Kindle. Book excerpt: To obtain an operating permit from Washington State Department of Ecology, Westinghouse Hanford Company (WHC) must assess the double-shell tanks (DST) for structural integrity. The assessment includes volumetric examinations of the primary steel tank and secondary steel liner. The integrity of the tanks will be assessed by remote ultrasonic (UT) inspections of the primary and secondary steel tanks to measure wall thickness and detect corrosion pitting and stress corrosion cracking. The surfaces of the areas to be inspected will be cleaned with a power wire brush to remove loose mill scale, rust, and other materials that could inhibit proper coupling of the UT probe. To ensure that the cleaning process is satisfactory, the cleaned area will be viewed with a video camera and recorded. The video and UT equipment will be calibrated the ensure accuracy, and a performance test will be conducted to verify its capabilities. The tank inspection sequence consists of cleaning, visual examination, and UT inspection of each region selected for inspection: the primary tank wall, the tank bottom and lower knuckle, and the secondary tank wall. A significant amount of data will be collected and reported during these examinations. This data management plan (DMP) describes the data produced by the examinations and how and where the data are to be stored.

Book Ultrasonic Examination of Double Shell Tank 241 AN 105 Examination Completed September 2002

Download or read book Ultrasonic Examination of Double Shell Tank 241 AN 105 Examination Completed September 2002 written by and published by . This book was released on 2002 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AN-105. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AN-105 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-8867, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report(s) that describes the results of the COGEMA ultrasonic examinations.

Book Ultrasonic Examination of Double shell Tank 241 AN 105

Download or read book Ultrasonic Examination of Double shell Tank 241 AN 105 written by Allan F. Pardini and published by . This book was released on 2002 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Ultrasonic Examination of Double Shell Tank 241 AY 101  Examination Completed October 2007

Download or read book Ultrasonic Examination of Double Shell Tank 241 AY 101 Examination Completed October 2007 written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: AREVA NC Inc., under contract from CH2M Hill Hanford Group, has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AY-101. PNNL is responsible for preparing a report(s) that describes the results of the AREVA ultrasonic examinations. This report is Revision 1 - more data has been added to the original report. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AY-101 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan, RPP-Plan-27202 (Jensen 2005) and summarized on page 1 of this document, are to be reported to CH2M Hill Hanford Group and the Pacific Northwest National Laboratory for further evaluation. Under the contract with CH2M Hill Hanford Group, all data is to be recorded on electronic media and paper copies of all measurements are provided to Pacific Northwest National Laboratory for third-party evaluation. Pacific Northwest National Laboratory is responsible for preparing a report(s) that describes the results of the AREVA NC Inc. ultrasonic examinations.

Book Double shell Tank Ultrasonic Inspection Plan  Revision 1

Download or read book Double shell Tank Ultrasonic Inspection Plan Revision 1 written by and published by . This book was released on 1994 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws.

Book Ultrasonic Examination of Double shell Tank 241 AP 104

Download or read book Ultrasonic Examination of Double shell Tank 241 AP 104 written by Allan F. Pardini and published by . This book was released on 2004 with total page 26 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Ultrasonic Examination of Double Shell Tank 241 AP 107 Examination Completed February 2008

Download or read book Ultrasonic Examination of Double Shell Tank 241 AP 107 Examination Completed February 2008 written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: AREVA Federal Services LLC (AFS), under a contract from CH2M HILL Hanford Group (CH2M HILL), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AP-107. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-107 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-Plan-34301 (Castleberry 2007) and summarized on page 1 of this document, are to be reported to CH2M HILL and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M HILL, all data is to be recorded on electronic media and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report(s) that describes the results of the AFS ultrasonic examinations.

Book Ultrasonic Examination of Double shell Tank 241 AY 101

Download or read book Ultrasonic Examination of Double shell Tank 241 AY 101 written by Allan F. Pardini and published by . This book was released on 2003 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Ultrasonic Examination of Double Shell Tank 241 AP 106  Examination Completed November 2004

Download or read book Ultrasonic Examination of Double Shell Tank 241 AP 106 Examination Completed November 2004 written by Gerald J. Posakony and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-106. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-106 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-22571 (Jensen 2004) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.

Book Ultrasonic Examination of Double Shell Tank 214 AW 102 Knuckle Region  Examination Completed February 2003

Download or read book Ultrasonic Examination of Double Shell Tank 214 AW 102 Knuckle Region Examination Completed February 2003 written by Gerald J. Posakony and published by . This book was released on 2003 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of the knuckle region of Double-Shell Tank 241-AW-102 utilizing the Remotely Operated Nondestructive Examination (RONDE) system. The purpose of this examination was to provide information that could be used to evaluate the integrity of the knuckle region of the primary tank. The requirements for the ultrasonic examination of Tank 241-AW-102 were to detect, characterize (identify, size, and locate), and record measurements made of any circumferentially oriented cracks that might be present in the knuckle area of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-7869, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided t o PNNL for third-party evaluation. PNNL is responsible for preparing a report(s) that describes the results of the COGEMA ultrasonic examinations.

Book Ultrasonic Examination of Double Shell Tank 241 AP 104  February 2005

Download or read book Ultrasonic Examination of Double Shell Tank 241 AP 104 February 2005 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-104. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary and secondary tank. The requirements for the ultrasonic examination of Tank 241-AP-104 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning that might be present in the wall of the primary tank in the upper knuckle region, and any wall thinning, pitting, or cracks in the wall of the secondary tank in the lower knuckle region. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-22571 (Jensen 2004) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.