EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Technical Abstract Bulletin

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Bethel Lake Dam  NJ00406   Delaware River Basin  Mantua Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Bethel Lake Dam NJ00406 Delaware River Basin Mantua Creek Gloucester County New Jersey Phase I Inspection Report written by Richard J. McDermott and published by . This book was released on 1981 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earth embankment supporting Gloucester County Highway Route 635 known as Lambs Road. The spillway structure consists of a horseshoe-shaped concrete weir located on the upstream side of the embankment. At the center of the embankment a concrete bridge forms the spillway discharge channel. The outlet works consists of a gated 2' x 2.5' sluice which transversely penetrates the center of the concrete spillway structure. The outlet discharges from the downstream face of the spillway structure into a stilling area between the spillway and bridge. Based on visual inspection, past operational performance and Phase I engineering analyses, Bethel Lake Dam is assessed as being in fair overall condition. Hydraulic and hydrologic analyses indicate that the spillway is inadequate. Discharge capacity of the spillway is not sufficient to pass the designated spillway design flood (100-year storm) without an overtopping of the dam. The spillway is capable of passing approximately 14 percent of the SDF.

Book Bethel Lake Dam  NJ00406

Download or read book Bethel Lake Dam NJ00406 written by and published by . This book was released on 1981 with total page 162 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1981 with total page 1070 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government reports annual index

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 932 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Lake Wadsworth Dam  NJ 00433   Delaware River Basin  Mantua Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Lake Wadsworth Dam NJ 00433 Delaware River Basin Mantua Creek Gloucester County New Jersey Phase I Inspection Report written by F. Keith Jolls and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Based on visual inspection, available records, calculations and past operational performance, Lake Wadsworth Dam, a high hazard potential structure, is judged to be in fair overall condition. The dam's spillway is considered inadequate since 12 percent of the Spillway Design Flood--SDF - would overtop the dam. (The SDF, in this instance, is one half of the Probable Maximum Flood). The decision to consider the spillway 'inadequate' instead of 'seriously inadequate' is based on the determination that dam failure resulting from overtopping would not significantly increase the hazard to loss of life downstream from the dam from that which would exist just before overtopping failure. Recommended actions are made to insure adequacy of the structure.

Book National Dam Safety Program  Alcyon Lake Dam  NJ 00427  Delaware River Basin  Chestnut Branch Mantua Creek  Gloucester County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program Alcyon Lake Dam NJ 00427 Delaware River Basin Chestnut Branch Mantua Creek Gloucester County New Jersey Phase 1 Inspection Report written by Wrubel Randolph and published by . This book was released on 1981 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: Alcyon Lake Dam is located in the Borough of Pitman, Gloucester County, New Jersey. Visual inspections were conducted on December 4, 1979 and January 10, 1980 at which time a stable reservoir condition was maintained. The tops of the flashboards at the main spillway and the stoplags at the auxiliary penstock inlet are at roughly the same elevation and were discharging about 2 inches of flow.

Book National Dam Safety Program  Sterling Lake Dam  NJ 00434   Delaware River Basin  Mantua Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Sterling Lake Dam NJ 00434 Delaware River Basin Mantua Creek Gloucester County New Jersey Phase I Inspection Report written by F. Keith Jolls and published by . This book was released on 1979 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sterling Lake Dam is an ill-defined 150 foot long highway embankment structure with a bridged spillway. The spillway is a concrete arch weir 22 feet in length with a 2 foot x 2 foot wood gate in the center of the arch. Gloucester County Bridge No. 5-J-14 spans the 16 foot discharge opening. The two-lane asphalt Pitman-Downer Road (30 feet in width) runs along the dam crest. At the upstream face of the embankment are situated 3 foot high dikes with stone masonry walls keyed into the earth and supporting remnants of a boardwalk. The slopes of the downstream embankment vary between 1H:1V at the outlet to 3H:1V near the abutments. Sterling Lake Dam is assessed to be in a fair overall condition although the spillway should be further inspected and additional hydrological/hydraulic studies undertaken to ascertain what improvements can be made in view of the fact that the discharge culvert is almost completely submerged by the downstream lake. The capacity of the spillway will accommodate only 6% of the 1/2 PMF design flood but the dam is not assessed as UNSAFE, NON-EMERGENCY as collapse from overtopping could not increase the hazard to life downstream from the erstwhile condition prior to overtopping.

Book National Dam Safety Program  Lake Gilman Dam  NJ00431   Delaware River Basin  Raccoon Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Lake Gilman Dam NJ00431 Delaware River Basin Raccoon Creek Gloucester County New Jersey Phase I Inspection Report written by F. Keith Jolls and published by . This book was released on 1979 with total page 61 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Almonesson Lake Dam  NJ 00401   Delaware River Basin  Almonesson Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Almonesson Lake Dam NJ 00401 Delaware River Basin Almonesson Creek Gloucester County New Jersey Phase I Inspection Report written by F. Keith Jolls and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Mirror Lake Dam  NJ00458   Delaware River Basin  Rancocas Creek  Burlington County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program Mirror Lake Dam NJ00458 Delaware River Basin Rancocas Creek Burlington County New Jersey Phase 1 Inspection Report written by Dennis J. Leary and published by . This book was released on 1978 with total page 123 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Franklinville Lake  NJ 00442  Delaware River Basin  Little Ease Run of Maurice River  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Franklinville Lake NJ 00442 Delaware River Basin Little Ease Run of Maurice River Gloucester County New Jersey Phase I Inspection Report written by Rudolph Wrubel and published by . This book was released on 1980 with total page 61 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Locust Lake Dam  NJ 00126   Delaware River Basin  Muddy Brook  Warren County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Locust Lake Dam NJ 00126 Delaware River Basin Muddy Brook Warren County New Jersey Phase I Inspection Report written by Dennis J. Leary and published by . This book was released on 1979 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Imlaystown Lake Dam  NJ00218   Delaware River Basin  Doctors Creek  Monmouth County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Imlaystown Lake Dam NJ00218 Delaware River Basin Doctors Creek Monmouth County New Jersey Phase I Inspection Report written by Richard J. McDermott and published by . This book was released on 1979 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Smithville Dam  NJ 00043  Delaware River Basin  North Branch Rancocas Creek  Burlington County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Smithville Dam NJ 00043 Delaware River Basin North Branch Rancocas Creek Burlington County New Jersey Phase I Inspection Report written by Richard J. McDermott and published by . This book was released on 1981 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. Based on visual inspection, available records, calculations and past operational performance, Smithville Dam, a high hazard potential structure, is judged to be in fair overall condition. The dam's spillway is considered inadequate because a flow equivalent to 9 percent of the Spillway Design Flood - SDF- would cause the dam to be overtopped. (The SDF, in this instance, is one half of the Probable Maximum Flood). The decision to consider the spillway 'inadequate' instead of 'seriously inadequate' is based on the determination that dam failure resulting from overtopping would not significantly increase the hazard to loss of life downstream from the dam from that which would exist just before overtopping failure.

Book National Dam Safety Program  Wrights Mill Dam  NJ 00432   Delaware River Basin  Raccoon Creek  Gloucester County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Wrights Mill Dam NJ 00432 Delaware River Basin Raccoon Creek Gloucester County New Jersey Phase I Inspection Report written by F. Keith Jolls and published by . This book was released on 1979 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 55 year-old earth embankment approximately 120 feet in length with a bridged spillway. An asphalt pavement (Elmer-Barnsboro Rd.) 30 feet in width runs along the crest. The spillway is a three sided concrete drop inlet with removable 3 in.-6 in. wide timber stoplogs on the front face. Steel sheet piling extends along the shoulder line on the upstream face of the dam on each side of the drop inlet. The maximum height of the dam is 13 feet at the culvert outlet. Wrights Mill Dam is assessed to be in a good overall condition and no physically detrimental conditions were observed but further hydraulic studies are recommended in the future to ascertain more accurately the capacity of the spillway. Overtopping of the dam could lead to a downstream embankment washout. Remedial actions recommended to be undertaken in the near future include (1) remove the dead trees and root systems on the downstream embankment slopes, (2) place riprap in the downstream channel and (3) place slope protection at the ends of the steel sheeting and downstream culvert wingwalls. The capacity of the spillway will accommodate only 24% of the one-half PMF design flood.