EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Final Deactivation Report on the Radioisotope Area Services  Building 3034  at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Report on the Radioisotope Area Services Building 3034 at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of Bldg. 3034, after completion of deactivation activities as outlined by the Department of Energy Office of Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the Department of Energy Office of Environmental Restoration (EM-40) Program. This report provides a history and profile of Bldg. 3034 before commencement of deactivation activities and a profile of the building after completion of deactivation activities. Turnover, items, such as the Postdeactivation Surveillance & Maintenance Plan, remaining hazardous materials, radiological controls, Safeguards and Security, quality assurance, facility operations, an supporting documentation provided in the Office of Nuclear Materials and Facility Stabilization Program (EM-60) Turnover Package, are discussed. Building 3034 will require access to facilitate required surveillance and maintenance (S & M) activities to maintain the building safety envelope. Building 3034 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S & M effort would be required to maintain the building safety envelope. In addition to the minimal S & M activities, the building will be occupied by the maintenance coordinator and the S & M supervisor for the Isotopes Facilities Deactivation Project. The exterior doors are locked when unoccupied to prevent unauthorized access. All materials have been removed from the building. Piping and alarms have been deactivated.

Book Final Deactivation Report on the Radioisotope Production Lab E  Building 3032  at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Report on the Radioisotope Production Lab E Building 3032 at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 121 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of Bldg. 3032, after completion of deactivation activities as outlined by the Department of Energy (DOE) Office of Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration Program (EM-40). This report provides a history and profile of Bldg. 3032 prior to commencing deactivation activities and a profile of the building after completion of deactivation activities. Turnover items, such as the Postdeactivation Surveillance & Maintenance Plan, remaining hazardous materials, radiological controls, Safeguards and Security, quality assurance, facility operations, and supporting documentation provided in the EM-60 turnover package are discussed. Building 3032 will be used as the Health Physics Office for the Isotopes Facilities Deactivation Program area and will require access for these offices and to facilitate required surveillance and maintenance (S & M) activities to maintain the building safety envelope. Bldg. 3032 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S & M effort would be required to maintain the building safety envelope. All materials have been removed from the building, and all utility systems, piping, and alarms have been deactivated except electricity and steam needed for the office areas.

Book Final Deactivation Report on the Radioisotope Production Lab D  Building 3031  at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Report on the Radioisotope Production Lab D Building 3031 at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of Bldg. 3031 after completion of deactivation activities as outlined by the Department of Energy Office of Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the Department of Energy Office of Environmental Restoration (EM-40) Program. This report provides a profile of Bldg. 3031 before and after deactivation activities. Turnover items, such as the Postdeactivation Surveillance & Maintenance Plan, remaining hazardous materials, radiological controls, Safeguards and Security, quality assurance, facility operations, and supporting documentation provided in the Office of Nuclear Materials and Facility Stabilization Program (EM-60) Turnover package, are discussed. Building 3031 will require access to facilitate required surveillance and maintenance activities to maintain the building safety envelope. Building 3031 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal surveillance and maintenance effort would be required to maintain the building safety envelope. Other than the minimal surveillance and maintenance activities, the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required surveillance and maintenance. All materials have been removed from the building and the hot cell, and all utility systems, piping, and alarms have been deactivated.

Book Final Deactivation Report on the Radioisotope Production Lab C  Building 3030  at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Report on the Radioisotope Production Lab C Building 3030 at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of Bldg. 3030 completion of deactivation activities as outlined by the Department of Energy (DOE) Office of Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to DOE's Office of Environmental Restoration Program (EM-40). This report provides profile of Bldg. 3030 before and after deactivation activities. Turnover items, such as the Postdeactivation Surveillance & Maintenance Plan, remaining hazardous materials, radiological controls, Safeguards and Security, QA, facility operations, and supporting documentation provided in the Office of Nuclear Materials and Facility Stabilization Program (EM-60) Turnover package are discussed. Building 3030 will require access to facilitate required S & M activities to maintain the building safety envelope. Building 3030 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S & M effort would be required to maintain the building's safety envelope. Other than the minimal S & M activities, the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only for required S & M. All materials have been removed from the building and the hot cell, and all utility systems, piping, and alarms have been deactivated.

Book Final Deactivation Report on the Radioisotope Production Lab H  Building 3118  at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Report on the Radioisotope Production Lab H Building 3118 at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration Program (EM-40). This report provides a history and profile of Bldg. 3118 prior to and after deactivation. Turnover items (e.g. Surveillance & Maintenance Plant, remaining materials, etc.) are discussed. Building 3118 was stabilized during deactivation so that when transferred to the EM-40 program, only minimal S & M is required (other than that, the building will be unoccupied and the exterior doors locked).

Book Aussf  hrlicher Bericht der abgesandten des Schw  b  Creyses

Download or read book Aussf hrlicher Bericht der abgesandten des Schw b Creyses written by and published by . This book was released on 1696 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Deactivation Project Report on the High Radiation Level Analytical Facility  Building 3019B at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Project Report on the High Radiation Level Analytical Facility Building 3019B at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S & M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S & M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S & M effort would be required to maintain the building safety envelope. Other than the minimal S & M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S & M until decommissioning activities begin.

Book Final Deactivation Project Report on the Integrated Process Demonstration Facility  Building 7602 Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Project Report on the Integrated Process Demonstration Facility Building 7602 Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S & M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed.

Book Final Deactivation Project Report on the Source Development Laboratory  Building 3029  Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Project Report on the Source Development Laboratory Building 3029 Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of Building 3029 after completion of deactivation activities as outlined by the DOE Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration (EM-40). This report provides a history and profile of the facility prior to commencing deactivation activities and a profile of the building after completion of deactivation activities. Turnover items, such as the post-deactivation surveillance and maintenance (S & M) plan, remaining hazardous materials, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the EM-60 turnover package are discussed. Building 3029 will require access to facilitate required S & M activities to maintain the building safety envelope. building 3029 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S & M effort would be required to maintain the building safety envelope. Other than the minimal S & M activities, the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S & M. 5 refs., 7 figs., 3 tabs.

Book Lifecycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Lifecycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1995 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt: The scope of this Activity Data Sheet (ADS) is to provide a detailed plan for the Isotopes Facilities Deactivation Project (IFDP) at the Oak Ridge National Laboratory (ORNL). This project places the former isotopes production facilities in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S & M) until the facilities are included in the Decontamination and Decommissioning (D & D) Program. The facilities included within this deactivation project are Buildings 3026-C, 3026-D, 3028, 3029, 3038-AHF, 3038-E, 3038-M, 3047, 3517, 7025, and the Center Circle Facilities (Buildings 3030, 3031, 3032, 3033, 3033-A, 3034, and 3118). The scope of deactivation identified in this Baseline Report include surveillance and maintenance activities for each facility, engineering, contamination control and structural stabilization of each facility, radioluminescent (RL) light removal in Building 3026, re-roofing Buildings 3030, 3118, and 3031, Hot Cells Cleanup in Buildings 3047 and 3517, Yttrium (Y) Cell and Barricades Cleanup in Building 3038, Glove Boxes & Hoods Removal in Buildings 3038 and 3047, and Inventory Transfer in Building 3517. For a detailed description of activities within this Work Breakdown Structure (WBS) element, see the Level 6 and Level 7 Element Definitions in Section 3.2 of this report.

Book Life Cycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Life Cycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1995 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Isotopes Facility Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S & M) and as quickly and economically as possible. This baseline plan establishes the official target schedule for completing the deactivation work and the associated budget required for deactivation and the necessary S & M. Deactivation of the facilities 3026C, 3026D, 3028, 3029, 3038E, 3038M, and 3038AHF, the Center Circle buildings 3047, 3517, and 7025 will continue though Fiscal Year (FY) 1999. The focus of the project in the early years will be on the smaller buildings that require less deactivation and can bring an early return in reducing S & M costs. This baseline plan covers the period from FY1995 throughout FY2000. Deactivation will continue in various facilities through FY1999. A final year of S & M will conclude the project in FY2000. The estimated total cost of the project during this period is $51M.

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 2001
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Work Plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Work Plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1996 with total page 174 pages. Available in PDF, EPUB and Kindle. Book excerpt: The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

Book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1996 with total page 33 pages. Available in PDF, EPUB and Kindle. Book excerpt: Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project.

Book Skolans regionala ledning

Download or read book Skolans regionala ledning written by and published by . This book was released on 1973 with total page 299 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

Download or read book Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory written by and published by . This book was released on 1995 with total page 186 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S & M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S & M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S & M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.