EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Experimental Breeder Reactor II  EBR II

Download or read book Experimental Breeder Reactor II EBR II written by Leonard J. Koch and published by . This book was released on 2008 with total page 264 pages. Available in PDF, EPUB and Kindle. Book excerpt: Koch, former manager of the Experimental Breeder Reactor-II (EBR-II), offers a first-hand account of the development, design, construction, and initial operation of this facility, which has contributed to the foundation of knowledge for all fast reactors. He explains why certain design choices were made while others were rejected. He also outlines how he thinks that future sodium cooled fast reactors should be designed, based on the experience gained with EBR-II. An appendix traces the lineage of EBR-II, including original memos and meeting notes, beginning with Enrico Fermi and Walter Zinn and progressing to the formation of the EBR-II project. B&w photos and illustrations are included. The book is of interest to designers of future fast reactors. There is no subject index.

Book EBR II Dry Critical Experiments

Download or read book EBR II Dry Critical Experiments written by and published by . This book was released on 1962 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: These experiments are preoperational zero-power nuclear investigations in the Experimental Breeder Reactor II (EBR-II) prior to insertion of sodium coolant. The experiments were performed with the power reactor instruments, fuel and mechanical components installed. The measured dry critical size, reactivity worth of control mechanisms and isothermal temperature coefficient of reactivity are in good agreement with predicted values. Additional measurements include neutron flux distributions in the uranium reflector and outside the reactor neutron shield.

Book Recent Operating Experiences and Programs at EBR II

Download or read book Recent Operating Experiences and Programs at EBR II written by and published by . This book was released on 1984 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Experimental Breeder Reactor No. II (EBR-II) is a pool-type, unmoderated, sodium-cooled reactor with a design power of 62.5 MWt and an electrical generation capability of 20 MW. It has been operated by Argonne National Laboratory for the US government for almost 20 years. During that time, it has operated safely and has demonstrated stable operating characteristics, high availability, and excellent performance of its sodium components. The 20 years of operating experience of EBR-II is a valuable resource to the nuclear community for the development and design of future LMFBR's. Since past operating experience has been extensively reported, this report will focus on recent programs and events.

Book The EBR II Fuel Cycle Story

Download or read book The EBR II Fuel Cycle Story written by Charles E. Stevenson and published by . This book was released on 1987 with total page 274 pages. Available in PDF, EPUB and Kindle. Book excerpt: In this comprehensive volume, Stevenson recounts the history of the Experimental Breeder Reactor-II (EBR-II), the Fuel Cycle Facility (FCF), and the process requirements of this unique technology. The author also explains the reasons behind the remarkable success of both the EBR-II and the FCF. These data, presented as a useful information source, should be of considerable significance to the continuing development of nuclear power.

Book Addendum to Hazard Summary Report

Download or read book Addendum to Hazard Summary Report written by L. J. Koch and published by . This book was released on 1962 with total page 334 pages. Available in PDF, EPUB and Kindle. Book excerpt: The initial "Hazard Summary Report - Experimental Breeder Reactor-II (EBR-II)" was published as ANL-5719 in May, 1957. At the time of preparation of ANL-5719 (early 1957), the design of the EBR-II Facility was in progress - construction had not started. This Addendum is limited, for the most part, to changes which have been made in the EBR-II Facility, and to supporting experimental data developed, since the publication of ANL-5719.

Book Seventeen Years of LMFBR Experience

Download or read book Seventeen Years of LMFBR Experience written by and published by . This book was released on 1982 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Operating experience at EBR-II over the past 17 years has shown that a sodium-cooled pool-type reactor can be safely and efficiently operated and maintained. The reactor has performed predictably and benignly during normal operation and during both unplanned and planned plant upsets. The duplex-tube evaporators and superheaters have never experienced a sodium/water leak, and the rest of the steam-generating system has operated without incident. There has been no noticeable degradation of the heat transfer efficiency of the evaporators and superheaters, except for the one superheater replaced in 1981. There has been no need to perform any chemical cleaning of steam-system components.

Book EBR II

    Book Details:
  • Author :
  • Publisher :
  • Release : 1978
  • ISBN :
  • Pages : pages

Download or read book EBR II written by and published by . This book was released on 1978 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Experimental Breeder Reactor II (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. The primary cooling system is a submerged-pool type. The early operation of the reactor successfully demonstrated the feasibility of a sodium-cooled fast breeder reactor operating as an integrated reactor, power plant, and fuel-processing facility. In 1967, the role of EBR-II was reoriented from a demonstration plant to an irradiation facility. Many changes have been made and are continuing to be made to increase the usefulness of EBR-II for irradiation and safety tests. A review of EBR-II's operating history reveals a plant that has demonstrated high availability, stable and safe operating characteristics, and excellent performance of sodium components. Levels of radiation exposure to the operating and maintenance workers have been low; and fission-gas releases to the atmosphere have been minimal. Driver-fuel performance has been excellent. The repairability of radioactive sodium components has been successfully demonstrated a number of times. Recent highlights include installation and successful operation of (1) the hydrogen-meter leak detectors for the steam generators, (2) the cover-gas-cleanup system and (3) the cesium trap in the primary sodium. Irradiations now being conducted in EBR-II include the run-beyond-cladding breach fuel tests for mixed-oxide and carbide elements. Studies are in progress to determine EBR-II's capability for conducting important ''operational safety'' tests. These tests would extend the need and usefulness of EBR-II into the 1980's.

Book Hazard Summary Report

Download or read book Hazard Summary Report written by L. J. Koch and published by . This book was released on 1957 with total page 408 pages. Available in PDF, EPUB and Kindle. Book excerpt: The EBR-II reactor consists of an enriched core surrounded on all sides by a fertile blanket of depleted uranium. The fuel elements which comprise the core section of the reactor consist of small diameter cylindrical pin assemblies. The design of the fuel element is influenced by the desire for high thermal performance, high burnup, and simplicity of construction. The fuel pin is a loss fit in a thin-walled tube which provides a clearance annulus between the pin and the tube wall. This annulus is filled with static sodium to provide a heat transfer bond between the fuel and fuel tube. Heat is removed from the fuel element by the primary sodium flowing along the outside of the fuel tube.

Book EBR II

    Book Details:
  • Author :
  • Publisher :
  • Release : 1985
  • ISBN :
  • Pages : pages

Download or read book EBR II written by and published by . This book was released on 1985 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Experimental Breeder Reactor No. 2 (EBR-II) is an unmoderated, sodium-cooled reactor with a design power of 62.5 MWt. For the last 20 years EBR-II has operated safely, has demonstrated stable operating characteristics, has shown excellent performance of its sodium components, and has had an excellent plant factor. These years of operating experience provide a valuable resource to the nuclear community for the development and design of future liquid metal fast reactors. This report provides a brief description of the EBR-II plant and its early operating experience, describes some recent problems of interest to the nuclear community, and also mentions some of the significant operating achievements of EBR-II. Finally, a few words and speculations on EBR-II's future are offered. 4 figs., 1 tab.

Book The Physics Design of the EBR II

Download or read book The Physics Design of the EBR II written by W. B. Loewenstein and published by . This book was released on 1961 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: The physics design problems of the EBR-II are summarized. These include analysis of the EBR-II engineering design as well as applicable zero-power critical experiments. Pertinent reactor safety problems are reviewed. Safety considerations bearing on normal plant operation and manipulations within the reactor are emphasized. The implication of controlled in-pile meltdown experiments is considered. Irradiation damage and metallurgical phase phenomena are summarized and related to reactivity. The nuclear performance of the system is considered in terms of actual plant operation. The predicted shift of both power and reactivity from core to radial reflector is described.

Book EBR II Dry Critical Experiments

Download or read book EBR II Dry Critical Experiments written by L. J. Koch and published by . This book was released on 1961 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: Revisions in the reactor system and operating procedures necessary for carrying out a proposed dry critical experiment in the EBR-II are described. The safety aspect of the program is considered. The critical experiment will be conducted in the EBR-II prior to filling the primary system with sodium. The facility, experimental program, operational and experimental procedures, and hazards and plant safety are described.

Book Nuclear Criticality Control in the EBR II Fuel Cycle Facility

Download or read book Nuclear Criticality Control in the EBR II Fuel Cycle Facility written by J. C. Hesson and published by . This book was released on 1964 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt: An investigation has been made of criticality problems which might be encountered in EBR-II Fuel Cycle Facility. The purpose of the investigation was to determine quantity and configuration limits of the investigation was to determine quantity and configuration limits for EBR-II fuel of the first core composition during storage, handling and processing of this fuel material in the EBR-II Fuel Cycle Facility. Brief consideration in processing future EBR-II cores which are expected to contain plutonium as a fissionable matrial.

Book Deactivation of the EBR II Complex

Download or read book Deactivation of the EBR II Complex written by and published by . This book was released on 1996 with total page 7 pages. Available in PDF, EPUB and Kindle. Book excerpt: In January of 1994, the Department of Energy mandated the termination of the Integral Fast Reactor (IFR) Program, effective October 1, 1994. To comply with this decision, Argonne National Laboratory-West (ANL-W) prepared a plan providing detailed requirements to place the Experimental Breeder Reactor-II (EBR-II) in a radiologically and industrially safe condition, including removal of all irradiated fuel assemblies from the reactor plant, and removal and stabilization of the primary and secondary sodium, a liquid metal used to transfer heat within the reactor plant. The ultimate goal of the deactivation process is to place the EBR-II complex in a stable condition until a decontamination and decommissioning (D and D) plan can be prepared, thereby minimizing requirements for maintenance and surveillance and maximizing the amount of time for radioactive decay. The final closure state will be achieved in full compliance with federal, state and local environmental, safety, and health regulations and requirements. The decision to delay the development of a detailed D and D plan has necessitated this current action.

Book Planning for Closure and Deactivation of the EBR II Complex

Download or read book Planning for Closure and Deactivation of the EBR II Complex written by and published by . This book was released on 1997 with total page 10 pages. Available in PDF, EPUB and Kindle. Book excerpt: In January 1994, DOE terminated the Integral Fast Reactor (IFR) Program. Argonne National Laboratory-West (ANL-W) prepared a detailed plan to put Experimental Breeder Reactor-II (EBR-II) in a safe condition, including removal of irradiated fueled subassemblies from the plant, transfer of subassemblies, and removal and stabilization of primary and secondary sodium liquid heat transfer metal. The goal of deactivation is to stabilize the EBR-II complex until decontamination and decommissioning (D & D) is implemented, thereby minimizing maintenance and surveillance. Deactivation of a sodium cooled reactor presents unique concerns. Residual sodium in the primary and secondary systems must be either reacted or inerted to preclude concerns with explosive sodium-air reactions. Also, residual sodium on components will effectively solder these items in place, making removal unfeasible. Several special cases reside in the primary system, including primary cold traps, a cesium trap, a cover gas condenser, and systems containing sodium-potassium alloy. The sodium or sodium-potassium alloy in these components must be reacted in place or the components removed. The Sodium Components Maintenance Shop at ANL-W provides the capability for washing primary components, removing residual quantities of sodium while providing some decontamination capacity. Considerations need to be given to component removal necessary for providing access to primary tank internals for D & D activities, removal of hazardous materials, and removal of stored energy sources. ANL-W's plan for the deactivation of EBR-II addresses these issues, providing for an industrially and radiologically safe complex, requiring minimal surveillance during the interim period between deactivation and D & D. Throughout the deactivation and closure of the EBR-II complex, federal environmental concerns will be addressed, including obtaining the proper permits for facility condition and waste processing and disposal. 2 figs.

Book Fabrication of EBR II  Core I Fuel Elements

Download or read book Fabrication of EBR II Core I Fuel Elements written by and published by . This book was released on 1962 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: Activities in a program to assemble and test jacketed fuel rods and multi-rod fuel rod assemblies for EBR-II are reported. Other work is reported on evaluation of the manufacturing techniques proposed for the EBR-II cycle in a sustained operation and on remotely operable equipment under production conditions. Data on fabrication and assembly of fuel rods and assemblies are included. A total of 10,781 fully inspected fuel rods were fabricated for EBR-II core by processes adaptable to remote operation.

Book EBR II

    Book Details:
  • Author :
  • Publisher :
  • Release : 1983
  • ISBN :
  • Pages : pages

Download or read book EBR II written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Experimental Breeder Reactor II (EBR-II) has been operating for nearly 20 years as part of the foundation of the US Department of Energy's LMFBR development program. During that time, the EBR-II fuel-handling system has performed extremely well, especially considering the conditions under which much of the system operates and the reliability required to maintain the high plant factor routinely demonstrated by EBR-II. Since EBR-II is a pool-type reactor, much of the fuel handling is done remotely within the sodium-filled primary tank at 371°C. Activities involved in locating a misplaced fuel subassembly in the primary tank are described.

Book Experimental Breeder Reactor II  EBR II  Shield Design

Download or read book Experimental Breeder Reactor II EBR II Shield Design written by M. Grotenhuis and published by . This book was released on 1962 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: A description of the EBR-II shield and the methods employed in arriving at the final design are presented. The major shield design problems for that reactor are enumerated and discussed.