EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book U S  Environmental Protection Agency Clear Air Act Notice of Construction for the Spent Nuclear Fuel Project   Cold Vaccum Drying Facility  Project W 441

Download or read book U S Environmental Protection Agency Clear Air Act Notice of Construction for the Spent Nuclear Fuel Project Cold Vaccum Drying Facility Project W 441 written by and published by . This book was released on 1996 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides information regarding the source and the estimated quantity of potential airborne radionuclide emissions resulting from the operation of the Cold Vacuum Drying (CVD) Facility. The construction of the CVD Facility is scheduled to commence on or about December 1996, and will be completed when the process begins operation. This document serves as a Notice of Construction (NOC) pursuant to the requirements of 40 Code of Federal Regulations (CFR) 61 for the CVD Facility. About 80 percent of the U.S. Department of Energy's spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters, while the SNF in the K East Basin is in open canisters, which allow release of corrosion products to the K East Basin water. Storage of the current inventory in the K Basins was originally intended to be on an as-needed basis to sustain operation of the N Reactor while the Plutonium-Uranium Extraction (PUREX) Plant was refurbished and restarted. The decision in December 1992 to deactivate the PURF-X Plant left approximately 2,100 MT (2,300 tons) of uranium as part of the N Reactor SNF in the K Basins with no means for near-term removal and processing. The CVD Facility will be constructed in the 100 Area northwest of the 190 K West Building, which is in close proximity to the K East and K West Basins (Figures 1 and 08572). The CVD Facility will consist of five processing bays, with four of the bays fully equipped with processing equipment and the fifth bay configured as an open spare bay. The CVD Facility will have a support area consisting of a control room, change rooms, and other functions required to support operations.

Book State of Washington Department of Health Radioactive Air Emissions Notice of Construction Phase 1 for Spent Nuclear Fuel Project   Cold Vacuum Drying Facility  Project W 441

Download or read book State of Washington Department of Health Radioactive Air Emissions Notice of Construction Phase 1 for Spent Nuclear Fuel Project Cold Vacuum Drying Facility Project W 441 written by and published by . This book was released on 1996 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: This notice of construction (NOC) provides information regarding the source and the estimated annual possession quantity resulting from operation of the Cold Vacuum Drying Facility (CVDF). Additional details on emissions generated by the operation of the CVDF will be discussed again in the Phase 11 NOC. This document serves as a NOC pursuant to the requirements of WAC 246-247-060 for the completion of Phase I NOC, defined as the pouring of concrete for the foundation flooring, construction of external walls, and construction of the building excluding the installation of CVDF process equipment. A Phase 11 NOC will be submitted for approval prior to installing and is defined as the completion of the CVDF, which consisted installation of process equipment, air emissions control, and emission monitoring equipment. About 80 percent of the U.S. Department of Energy's spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters while the SNF in the K East Basin is in open canisters, which allow free release of corrosion products to the K East Basin water.

Book Department of Energy s Hanford Spent Nuclear Fuel Project

Download or read book Department of Energy s Hanford Spent Nuclear Fuel Project written by United States. Congress. House. Committee on Commerce. Subcommittee on Oversight and Investigations and published by . This book was released on 1998 with total page 352 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book U S  Environmental Protection Agency Clean Air Act Notice of Construction for Spent Nuclear Fuel Project   Hot Conditioning System Annex  Project W 484

Download or read book U S Environmental Protection Agency Clean Air Act Notice of Construction for Spent Nuclear Fuel Project Hot Conditioning System Annex Project W 484 written by and published by . This book was released on 1996 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: This notice of construction (NOC) provides information regarding the source and the estimated quantity of potential airborne radionuclide emissions resulting from the operation of the Hot Conditioning System (HCS) Annex. The construction of the HCS Annex is scheduled to conunence on or about December 1996, and will be completed when the process equipment begins operations. This document serves as a NOC pursuant to the requirements of 40 Code of Federal Regulations (CFR) 61 for the HCS Annex. About 80 percent of the U.S. Department of Energy's spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters, while the SNF in the K East Basin is contained in open canisters, which allows release of corrosion products to the K East Basin water. Storage of the current inventory in the K Basins was originally intended to be on an as-needed basis to sustain operation of the N Reactor while the Plutonium-Uranium Extraction (PUREX) Plant was refurbished and restarted. The decision in December 1992 to deactivate the PUREX Plant left approximately 2, 1 00 MT (2,300 tons) of uranium, as part of 1133 N Reactor SNF in the K Basins with no means for near-term removal and processing. The HCS Annex will be constructed as an annex to the Canister Storage Building (CSB) and will contain the hot conditioning equipment. The hot conditioning system (HCS) will release chemically-bound water and will condition (process of using a controlled amount of oxygen to destroy uranium hydride) the exposed uranium surfaces associated with the SNF through oxidation. The HCS Annex will house seven hot conditioning process stations, six operational and one auxiliary, which could be used as a welding area for final closure of the vessel containing the SNF. The auxiliary pit is being evaluated at this time for its usefulness to support other operations that may be needed to ensure proper conditioning of the SNF and proper storage of the vessel containing the SNF. Figures I and 2 contain map locations of the Hanford Site and the HCS Annex.

Book State of Washington Department of Ecology Toxic Air Pollutants Phase II Notice of Construction for the Hanford Site Spent Nuclear Fuel Project

Download or read book State of Washington Department of Ecology Toxic Air Pollutants Phase II Notice of Construction for the Hanford Site Spent Nuclear Fuel Project written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book State of Washington Department of Ecology Criteria Pollutants and Toxic Air Polluntants Phase II Notice of Construction for the Hanford Site Spent Nuclear Fuel Project  cold Vacuum Dryingfacility  Project W 441

Download or read book State of Washington Department of Ecology Criteria Pollutants and Toxic Air Polluntants Phase II Notice of Construction for the Hanford Site Spent Nuclear Fuel Project cold Vacuum Dryingfacility Project W 441 written by and published by . This book was released on 1997 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Phase 11 notice of construction (NOC) provides the additional information committed to in the Phase I NOC submittal (DOE/RL-96- 55) regarding the air toxic and criteria pollutants that could potentially be emitted during operation of the Cold Vacuum Drying Facility (CVDF). This Phase 11 NOC is being submitted to ensure the CVDF is in full compliance with Washington Administrative Code (WAC) 173-460-040(8), 'Commencement of Construction'. The Phase I NOC (approved September 30, 1996) was defined as constructing the substructure, including but not limited to, pouring the concrete for the floor, and construction of the exterior. This Phase 11 NOC is being submitted for approval before installation and operation of the process equipment that will generate any potential air emissions at the CVDF, and installation and operation of the emissions control equipment.

Book Radioactive Air Emissions Notice of Construction for Phase 2 Spent Nuclear Fuel Canister Storage Building    Project W 379

Download or read book Radioactive Air Emissions Notice of Construction for Phase 2 Spent Nuclear Fuel Canister Storage Building Project W 379 written by and published by . This book was released on 1998 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this Notice of Construction (NOC) is to provide a rewritten NOC for obtaining regulatory approval for changes to the previous Canister Storage Building (CSB) NOCs (WDOH, 1996 and EPA, 1996) as were approved by the Washington State Department of Health (WDOH, 1996a) and US Environmental Protection Agency (EPA, 1996a). These changes are because of a revised sealing configuration of the multi-canister overpacks (MCOS) that are used to store the SNF. A flow schematic of the SNF Project is provided in Figure 1-1. A separate notification of startup will be provided apart from this NOC.

Book Project W 441  Cold Vacuum Drying Facility Design Requirements Document

Download or read book Project W 441 Cold Vacuum Drying Facility Design Requirements Document written by and published by . This book was released on 1997 with total page 86 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage.

Book State of Washington Department of Health Radioactive Air Emission Notice of Construction Phase 1 for Spent Nuclear Fuel Project   Hot Conditioning System Annex  Project W 484

Download or read book State of Washington Department of Health Radioactive Air Emission Notice of Construction Phase 1 for Spent Nuclear Fuel Project Hot Conditioning System Annex Project W 484 written by and published by . This book was released on 1996 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: This notice of construction (NOC) provides information regarding the source and the estimated annual possession quantity resulting from the operation of the Hot Conditioning System Annex (HCSA). This information will be discussed again in the Phase II NOC, providing additional details on emissions generated by the operation of the HCSA. This Phase I NOC is defined as construct in the substructure, including but limited to, pouring the concrete for the floor; construction of the process pits and exterior walls; making necessary interface connections to the Canister Storage Building (CSB) ventilation and utility systems for personnel comfort; and extending the multi-canister over-pack (MCO) handling machine rails into the HCSA. A Phase II NOC will be submitted for approval prior to installation and is defined as the completion of the HCSA, which will consist of installation of Hot Conditioning System Equipment (HCSA), air emissions control equipment, and emission monitoring equipment. About 80 percent of the U.S. Department of Energy's spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters, while the SNF in the K East Basin is contained in open canisters, which allow free release of corrosion products to the K East Basin water. Storage in the K Basins was originally intended to be on an as-needed basis to sustain operation of the N Reactor while the Plutonium-Uranium Extraction (PUREX) Plant was refurbished and restarted. The decision in December 1992 to deactivate the PUREX Plant left approximately 2,300 MT (2,530 tons) of N Reactor SNF in the K Basins with no means for near-term removal and processing. The HCSA will be constructed as an addition to the CSB and will contain the HCSA. The hot conditioning system (HCS) will remove chemically-bound water and will passivate the exposed uranium surfaces associated, with the SNF. The HCSA will house seven hot conditioning process stations, six operational and one auxiliary pit, which could be used as a welding area for final sealing of the vessel containing the SNF, or for neutron interrogation of the vessel containing the SNF to determine residual water content. Figures 1 and 2 contain map locations of the Hanford Site and the HCSA. 'Response to Requirement' subtitle under each of the following sections identifies the corresponding Appendix A NOC application requirement listed under WAC 246-247-1 10.

Book A Budakeszi F  ldm  gneses Obszervat  rium megfigyel  sei

Download or read book A Budakeszi F ldm gneses Obszervat rium megfigyel sei written by and published by . This book was released on 1966 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Radioactive Air Emissions Notice of Construction

Download or read book Radioactive Air Emissions Notice of Construction written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Spent Nuclear Fuel  SNF  Project Cold Vacuum Drying  CVD  Facility Master Equipment List

Download or read book Spent Nuclear Fuel SNF Project Cold Vacuum Drying CVD Facility Master Equipment List written by and published by . This book was released on 1999 with total page 134 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides the master equipment list (MEL) for the Cold Vacuum Drying Facility (CVDF). The MEL was prepared to comply with DOE Standard 3024-98, Content of System Design Descriptions. The MEL was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems and the CVDF System Design Descriptions (SDD). The MEL identifies the SSCs and their safety functions, the design criteria, codes and standards, and quality assurance requirements that are required for establishing the safety design basis of the SSCs. The MEL also includes operating parameters, manufacturer information, and references the procurement specifications for the SSCs. This MEL shall be updated, expanded, and revised in accordance with future phases of the CVDF SAR, the SDD's, and CVDF operations.

Book Cold Vacuum Drying Facility

Download or read book Cold Vacuum Drying Facility written by and published by . This book was released on 1998 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: The mission of the Spent Nuclear Fuel (SNF) Project is to remove the fuel currently located in the K-Basins 100 Area to provide safe handling and interim storage of the fuel. The spent nuclear fuel will be repackaged in multi-canister overpacks, partially dried in the Cold Vacuum Drying Facility (CVDF), and then transported to the Canister Storage Building (CSB) for further processing and interim storage. The CVDF, a subproject to the SNF Project, will be constructed in the 100K area. The CVDF will remove free water and vacuum dry the spent nuclear fuel, making it safer to transport and store at the CSB. At present, the CVDF is approximately 90% complete with definitive design. Part of the design process is to conduct Failure Modes, Effects, and Criticality Analysis (FMECA). A four-day FMECA session was conducted August 18 through 21, 1997. The purpose of the session was to analyze 16 subsystems and operating modes to determine consequences of normal, upset, emergency, and faulted conditions with respect to production and worker safety. During this process, acceptable and unacceptable risks, needed design or requirement changes, action items, issues/concerns, and enabling assumptions were identified and recorded. Additionally, a path forward consisting of recommended actions would be developed to resolve any unacceptable risks. The team consisted of project management, engineering, design authority, design agent, safety, operations, and startup personnel. The report summarizes potential problems with the designs, design requirements documentation, and other baseline documentation.

Book Spent Nuclear Fuel  SNF  Cold Vacuum Drying  CVD  Facility Operations Manual

Download or read book Spent Nuclear Fuel SNF Cold Vacuum Drying CVD Facility Operations Manual written by and published by . This book was released on 1999 with total page 97 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

Book Spent Nuclear Fuel Project Cold Vacuum Drying Facility Process Water Conditioning System Design Description

Download or read book Spent Nuclear Fuel Project Cold Vacuum Drying Facility Process Water Conditioning System Design Description written by and published by . This book was released on 1998 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Process Water Conditioning (PWC) System. The SDD was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), the HNF-SD-SNF-DRD-O02, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the PWC equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

Book EPA 745 B

    Book Details:
  • Author :
  • Publisher :
  • Release : 2000
  • ISBN :
  • Pages : 186 pages

Download or read book EPA 745 B written by and published by . This book was released on 2000 with total page 186 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Cold Vacuum Drying Facility Design Requirements

Download or read book Cold Vacuum Drying Facility Design Requirements written by and published by . This book was released on 1999 with total page 291 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.