EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book SSN  688  class Submarine Procurement

Download or read book SSN 688 class Submarine Procurement written by United States. Congress. Senate. Committee on Appropriations. Subcommittee on Department of Defense and published by . This book was released on 1981 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy Attack Submarine Procurement

Download or read book Navy Attack Submarine Procurement written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011-04 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: Contents: (1) Intro.; (2) Background: Types of Sub¿s. in the U.S. Navy; Attack Sub. Force Levels; Virginia (SSN-774) Class Program; Past and Planned Procurement; Changes in Planned Procurement Rates; Joint Production Arrangement; Cost-Reduction Effort; Sub Construction Industrial Base; Design and Engin. (D&E) Portion; Projected SSN Shortfall; Navy Study on Options for Mitigating Projected Shortfall; (3) Issues for Congress: 48-Boat Force-Level Goal and Planned SSN Procurement; (4) Options for Congress; (5) Legislative Activity for FY 2010. Appendices: Past SSN Force-Level Goals; Views Regarding 48-Boat SSN Force-Level Goal; Options for Funding SSNs; Maintaining Sub. D&E Base. A print on demand pub.

Book Navy Virginia Class Attack Submarine Procurement

Download or read book Navy Virginia Class Attack Submarine Procurement written by Ronald O'Rourke and published by Createspace Independent Publishing Platform. This book was released on 2016-11-11 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.

Book Navy Virginia  SSN 774  Class Attack Submarine Procurement  Background and Issues for Congress

Download or read book Navy Virginia SSN 774 Class Attack Submarine Procurement Background and Issues for Congress written by and published by . This book was released on 2010 with total page 23 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) at a rate of one per year for the past several years, and a total of 12 boats have been procured through FY2010. The Navy's proposed FY2011 budget increases the procurement rate to two boats per year. The eight boats to be procured in the five-year period FY2009-FY2013 (boats 11 through 18) are being procured under a multiyear procurement (MYP) arrangement. The Navy's proposed FY2011 budget requests $3,441.5 million in procurement funding to complete the procurement cost of the 13th and 14th Virginia-class boats. The FY2011 budget estimates the combined procurement cost of these two boats at $5,344.4 million, and the boats have received a total of $1,903.0 million in prior-year advance procurement (AP) and Economic Order Quantity (EOQ) funding. The Navy's proposed FY2011 budget also requests $1,436.8 million in AP funding for Virginia-class boats to be procured in future years, and $254.4 million in Economic Order Quantity (EOQ) purchases of long-leadtime items for Virginia-class boats to be procured under the FY2009-FY2013 MYP arrangement.

Book Attack Submarines

Download or read book Attack Submarines written by United States. General Accounting Office and published by . This book was released on 1994 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Attack Submarines

    Book Details:
  • Author : DIANE Publishing Company
  • Publisher : DIANE Publishing
  • Release : 1994-12
  • ISBN : 9780788118623
  • Pages : 52 pages

Download or read book Attack Submarines written by DIANE Publishing Company and published by DIANE Publishing. This book was released on 1994-12 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy Virginia  Ssn 774  Class Attack Submarine Procurement

Download or read book Navy Virginia Ssn 774 Class Attack Submarine Procurement written by O'Rourke and published by CreateSpace. This book was released on 2014-10-31 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Book Navy Virginia  Ssn 774  Class Attack Submarine Procurement

Download or read book Navy Virginia Ssn 774 Class Attack Submarine Procurement written by Congressional Research Service and published by CreateSpace. This book was released on 2015-06-26 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2015 are to be the 21st and 22nd boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract.

Book Navy Virginia Class Attack Submarine Procurement

Download or read book Navy Virginia Class Attack Submarine Procurement written by Congressional Research Service and published by Createspace Independent Publishing Platform. This book was released on 2017-09-18 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2018 are to be the 27th and 28th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2018 at $5,532.7 million, or an average of $2,766.4 million each. The boats have received a total of $1,647.0 million in prior-year "regular" advance procurement (AP) funding and $580.4 million in prior-year Economic Order Quantity (EOQ) AP funding. The Navy's proposed FY2018 budget requests the remaining $3,305.3 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2018 budget also requests $1,920.6 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2018 funding request for the program (excluding outfitting and post-delivery costs) to $5,225.9 million. The Navy plans to build one of the two Virginia-class boats scheduled to be procured in FY2019, and all Virginia-class boats procured in FY2020 and subsequent years, with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's proposed FY2018 budget requests $72.9 million in research and development funding for the Virginia Payload Module (VPM). The Navy's previous force-level goal was to achieve and maintain a 308-ship fleet, including 48 SSNs. The Navy's new force-level goal, released in December 2015, is to achieve and maintain a 355-ship fleet, including 66 SSNs. The Navy's FY2017 30-year shipbuilding plan was developed in association with the previous 308-ship force-level goal, and consequently does not include enough SSNs to achieve and maintain a force of 66 SSNs. CRS estimates that 19 SSNs would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. The Congressional Budget Office (CBO) estimates that 16 to 19 would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. Taking into account the capacity of the submarine construction industrial base and the Navy's current plan to also build Columbia (SSBN-826) class ballistic missile submarines in coming years, CRS and CBO estimate that the earliest a 66-boat SSN force could be achieved might be the mid- to late 2030s. From FY2025 to FY2036, the number of SSNs is projected to experience a dip or valley, reaching a minimum of 41 boats (i.e., 25 boats, or about 38%, less than the 66-boat force-level goal) in FY2029. This projected valley is a consequence of having procured a relatively small number of SSNs during the 1990s, in the early years of the post-Cold War era. Some observers are concerned that this projected valley in SSN force levels could lead to a period of heightened operational strain for the SSN force, and perhaps a period of weakened conventional deterrence against potential adversaries. The projected SSN valley was first identified by CRS in 1995 and has been discussed in CRS reports and testimony every year since then. The Navy has been exploring options for mitigating the projected valley. Procuring additional Virginia-class boats in the near term is one of those options. In that connection, the Navy has expressed interest in procuring an additional Virginia-class boat in FY2021. Congress also has the option of funding the procurement of one or more additional Virginia-class boats in FY2018-FY2020.

Book Better Navy Management of Shipbuilding Contracts Could Save Millions of Dollars

Download or read book Better Navy Management of Shipbuilding Contracts Could Save Millions of Dollars written by United States. General Accounting Office and published by . This book was released on 1980 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book SSN  688  class submarine procurement

Download or read book SSN 688 class submarine procurement written by United States. Congress. Senate. Committee on Appropriations. Subcommittee on Department of Defense and published by . This book was released on 1981 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Sustaining U S  Nuclear Submarine Design Capabilities

Download or read book Sustaining U S Nuclear Submarine Design Capabilities written by John Frederic Schank and published by Rand Corporation. This book was released on 2007 with total page 235 pages. Available in PDF, EPUB and Kindle. Book excerpt: For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret.

Book New Attack Submarine

    Book Details:
  • Author : United States. Congress. House. Committee on National Security. Subcommittee on Military Procurement
  • Publisher :
  • Release : 1996
  • ISBN :
  • Pages : 132 pages

Download or read book New Attack Submarine written by United States. Congress. House. Committee on National Security. Subcommittee on Military Procurement and published by . This book was released on 1996 with total page 132 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Analysis of Ssn 688 Class Submarine Maintenance Delays   Study of Pearl Harbor Naval Shipyard Work on Nuclear Powered Attack Submarines  Impact of Decrease in Overall Operational Availability

Download or read book Analysis of Ssn 688 Class Submarine Maintenance Delays Study of Pearl Harbor Naval Shipyard Work on Nuclear Powered Attack Submarines Impact of Decrease in Overall Operational Availability written by U. S. Military and published by Independently Published. This book was released on 2018-08-04 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: The combination of negative real budget growth and unchanged operational use has stressed the resources of the United States Navy, resulting in an annual average over-budget execution of $0.77 billion per year in Navy-wide ship depot maintenance since FY2010. The Navy's active ship maintenance budget only supports 70 percent of the ship maintenance projected in FY2017; a significant portion of over-budget execution and delays has occurred with submarine availabilities. Delays to a submarine's return to the fleet results in a decrease of the overall operational availability (Ao) of already diminishing submarine force levels. In this thesis, data collected from Pearl Harbor Naval Shipyard (PHNSY) is analyzed to investigate possible factors impacting the ability of maintenance activities to complete SSN 688-class submarine maintenance availabilities as scheduled. The analysis illustrates a systematic underestimation of availability duration due to the use of outdated historically based estimates following a significant shift in maintenance strategy in 2012. Additionally, the analysis shows a significant increasing trend in the average number of man-days required to complete a job. This thesis provides a narrowed focus for future studies attempting to determine the cause of this trend. Finally, this thesis proposes a solution to the systematic underestimation of availability durations by illustrating the inherent error in the current equation and providing a notional equation to remove that error. I. INTRODUCTION * A. PURPOSE * 1. Problem Statement * 2. Research Questions * B. BENEFIT OF STUDY * 1. Attack Submarine Inventory Shortfall * 2. Resource-Constrained Environment * C. SCOPE OF THESIS * II. BACKGROUND * A. SUBMARINE MAINTENANCE PRACTICES * 1. Levels of Maintenance * 2. Submarine Maintenance Strategy * 3. FRP and I-Level Availabilities * 4. Maintenance Life Cycle Changes * B. TECHNICAL FOUNDATION PAPERS * 1. TFP Rev B Duration Calculation * 2. TFP Duration Summary * III. DATA AND KEY ASSUMPTIONS * A. DATA COLLECTION * 1. I-Level Availability Data Collection * 2. D-Level Availability Data Collection * B. DATA NORMALIZATION * 1. Normalization for Content * 2. Normalization for Quantity * 3. Normalization for Inflation * C. KEY ASSUMPTIONS * 1. Statistic Relevance over Time * 2. New Work Causes Late Days * IV. INTERMEDIATE LEVEL MAINTENANCE ANALYSIS * A. PROBLEM VERIFICATION * 1. Cost * 2. Schedule * 3. Performance * 4. Summary * B. KEY INDEPENDENT FACTORS * 1. Schedule * 2. Performance * 3. Summary * V. DEPOT LEVEL ANALYSIS * A. SCHEDULE AND PERFORMANCE TRENDS * 1. Performance * 2. Schedule * B. NOTIONAL DURATION APPLICATION * VI. CONCLUSION * A. FINDINGS * B. FUTURE STUDIES * 1. Component Reliability * 2. Workforce Experience * 3. I & D Level Funding * C. RECOMMENDATIONS

Book Navy Attack Submarine Procurement  Background and Issues for Congress

Download or read book Navy Attack Submarine Procurement Background and Issues for Congress written by and published by . This book was released on 2008 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's proposed FY2009 budget requests $2,107.0 million to complete the procurement funding for an 11th Virginia (SSN-774) class nuclear-powered attack submarine (SSN). This boat has already received $756.0 million in prior-year advance procurement funding. The Navy's proposed FY2009 budget also requests $719.8 million in advance procurement funding for Virginia-class boats to be procured in future fiscal years, and $596.8 million in additional procurement funding for economic order quantity (EOQ) purchases of key components for eight Virginia-class submarines (the 11th boat and seven others) that are to be procured under a multiyear procurement (MYP) arrangement during the 5-year period FY2009-FY2013. As part of its action on the Navy's FY2008 shipbuilding budget, Congress added $588 million in advance procurement funding for an additional Virginia class submarine to be procured in a year prior to FY2012. The Navy, as part of its proposed FY2009 budget, included this additional submarine in its shipbuilding plan and scheduled it to be fully funded in FY2011. One issue for Congress for FY2009 is whether to accelerate the full funding of the newly added submarine from FY2011 to FY2010 or FY2009, so as to facilitate a follow-on option of funding an additional one or two Virginia-class submarines in FY2010 and/or FY2011. Supporters of this option could argue that it would mitigate a projected seven-boat shortfall in SSNs. Opponents could argue that it would place added pressure on the Navy's FY2009 budget and/or its FY2010 budget, making it more difficult for the Navy to fund other priorities in those years. This report will be updated as events warrant.

Book Navy Submarines

Download or read book Navy Submarines written by Terry Coleman and published by Nova Science Publishers. This book was released on 2015 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.

Book Submarine

    Book Details:
  • Author : Tom Clancy
  • Publisher : Penguin
  • Release : 2003-05-06
  • ISBN : 1101002581
  • Pages : 372 pages

Download or read book Submarine written by Tom Clancy and published by Penguin. This book was released on 2003-05-06 with total page 372 pages. Available in PDF, EPUB and Kindle. Book excerpt: Only the author of The Hunt for Red October could capture the reality of life aboard a nuclear submarine. Only a writer of Mr. Clancy's magnitude could obtain security clearance for information, diagrams, and photographs never before available to the public. Now, every civilian can enter this top secret world...the weapons, the procedures, the people themselves...the startling facts behind the fiction that made Tom Clancy a #1 bestselling author.