EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Spent Nuclear Fuel  SNF  Storage Project Fuel Basket Handling Grapple Design Development Test Report

Download or read book Spent Nuclear Fuel SNF Storage Project Fuel Basket Handling Grapple Design Development Test Report written by and published by . This book was released on 2000 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Acceptance testing of the SNF Fuel Basket Lift Grapple was accomplished to verify the design adequacy. This report shows the results affirming the design. The test was successful in demonstrating the adequacy of the grapple assembly's inconel actuator shaft and engagement balls for in loads excess of design basis loads (3200 pounds), 3X design basis loads (9600 pounds), and 5X design basis loads (16,000 pounds). The test data showed that no appreciable yielding for the inconel actuator shaft and engagement balls at loads in excess of 5X Design Basis loads. The test data also showed the grapple assembly and components to be fully functional after loads in excess of 5X Design Basis were applied and maintained for over 10 minutes. Following testing, each actuator shaft (Item 7) was liquid penetrant inspected per ASME Section 111, Division 1 1989 and accepted per requirements of NF-5350. This examination was performed to insure that no cracking had occurred. The test indicated that no cracking had occurred. The examination reports are included as Appendix C to this document. From this test, it is concluded that the design configuration meets or exceeds the requirements specified in ANSI N 14 6 for Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds (4500 kg) or More.

Book MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test

Download or read book MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Acceptance testing of the production SNF Fuel Basket lift grapples to the required 150 percent maximum lift load is documented herein. The report shows the results affirming the proof test passage. The primary objective of this test was to confirm the load rating of the grapple per applicable requirements of ANSI 14 6 American National Standard For Radioactive Materials Special Lifting Devices for Shipping Containers Weighing 10,000 pounds (4500kg) or More. The above Standard requires a load test of 150% of the design load which must be held for a minimum of 10 minutes followed by a Liquid Penetrant or Magnetic Particle examination of critical areas and welds in accordance with the ANSI/ASME Boiler and Pressure Vessel Code 1989 Section 111 Division 1 section NF 5350.

Book Interim Report Spent Nuclear Fuel Retrieval System Fuel Handling Development Testing

Download or read book Interim Report Spent Nuclear Fuel Retrieval System Fuel Handling Development Testing written by and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Fuel handling development testing was performed in support of the Fuel Retrieval System (FRS) Sub-Project at the Hanford Site. The project will retrieve spent nuclear fuel, clean and remove fuel from canisters, repackage fuel into baskets, and load fuel into a multi-canister overpack (MCO) for vacuum drying and interim dry storage. The FRS is required to retrieve basin fuel canisters, clean fuel elements sufficiently of uranium corrosion products (or sludge), empty fuel from canisters, sort debris and scrap from whole elements, and repackage fuel in baskets in preparation for MCO loading. The purpose of fuel handling development testing was to examine the systems ability to accomplish mission activities, optimization of equipment layouts for initial process definition, identification of special needs/tools, verification of required design changes to support performance specification development, and validation of estimated activity times/throughput. The test program was set up to accomplish this purpose through cold development testing using simulated and prototype equipment; cold demonstration testing using vendor expertise and systems; and graphical computer modeling to confirm feasibility and throughput. To test the fuel handling process, a test mockup that represented the process table was fabricated and installed. The test mockup included a Schilling HV series manipulator that was prototypic of the Schilling Hydra manipulator. The process table mockup included the tipping station, sorting area, disassembly and inspection zones, fuel staging areas, and basket loading stations. The test results clearly indicate that the Schilling Hydra arm cannot effectively perform the fuel handling tasks required unless it is attached to some device that can impart vertical translation, azimuth rotation, and X-Y translation. Other test results indicate the importance of camera locations and capabilities, and of the jaw and end effector tool design. 5 refs., 35 figs., 3 tabs.

Book Spent Nuclear Fuel  SNF  Project Design Basis Capacity Study

Download or read book Spent Nuclear Fuel SNF Project Design Basis Capacity Study written by and published by . This book was released on 2000 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

Book Spent Nuclear Fuel Project   Criteria Document Spent Nuclear Fuel Final Safety Analysis Report

Download or read book Spent Nuclear Fuel Project Criteria Document Spent Nuclear Fuel Final Safety Analysis Report written by and published by . This book was released on 1999 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: The criteria document provides the criteria and planning guidance for developing the Spent Nuclear Fuel (SNF) Final Safety Analysis Report (FSAR). This FSAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, installation acceptance testing, startup, and operation of the SNF Project facilities (K Basins, Cold Vacuum Drying Facility, and Canister Storage Building).

Book Final Report

    Book Details:
  • Author : David R. Jackson
  • Publisher :
  • Release : 1997
  • ISBN :
  • Pages : pages

Download or read book Final Report written by David R. Jackson and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL  SNF  PROJECT CANISTER STORAGE BUILDING  CSB

Download or read book DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL SNF PROJECT CANISTER STORAGE BUILDING CSB written by and published by . This book was released on 2003 with total page 294 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB), '' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

Book Spent Nuclear Fuel  SNF  Project Final Safety Analysis Report  FSAR

Download or read book Spent Nuclear Fuel SNF Project Final Safety Analysis Report FSAR written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: No abstract prepared.

Book Spent Nuclear Fuel Canister Qualification Support

Download or read book Spent Nuclear Fuel Canister Qualification Support written by American Society of Mechanical Engineers and published by Amer Society of Mechanical. This book was released on 2004-01-01 with total page 254 pages. Available in PDF, EPUB and Kindle. Book excerpt: A publication of the Center for Research and Technology Development (CRTD). This report discusses the National Spent Nuclear Fuel (SNF) canisters for the handling and interim storage of SNF at various DOE sites, as well as the transport, handling, and disposal of SNF at the repository. The Project Team (PT), as part of a licensing support effect, has developed a comprehensive plan to assist DOE to meet USNRC licensing requirements for DOE's SNF canisters. The key components of the plan were presented to the Review Panel (RP) as the DOE SNF Canister Qualification Support Chart. The chart is periodically updated to reflect program status.

Book Spent Nuclear Fuel  SNF  Project Design Verification and Validation Process

Download or read book Spent Nuclear Fuel SNF Project Design Verification and Validation Process written by and published by . This book was released on 2000 with total page 13 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work.

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 2009
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Design Package Test Weights for Fuel Retrieval System  OCRWM

Download or read book Design Package Test Weights for Fuel Retrieval System OCRWM written by and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This is a design package that documents the development of test weights used in the Spent Nuclear Fuels subproject Fuel Retrieval System. The K Basins Spent Nuclear Fuel (SNF) project consists of the safe retrieval, preparation, and repackaging of the spent fuel stored at the K East (KE) and K West (KW) Basins for interim safe storage in the Canister Storage Building (CSB). Multi-Canister Overpack (MCO) scrap baskets and fuel baskets will be loaded and weighed under water. The equipment used to weigh the loaded fuel baskets requires daily calibration checks, using test weights traceable to National Institute of Standards Testing (NIST) standards. The test weights have been designated as OCRWM related in accordance with HNF-SD-SNF-RF'T-007 (McCormack).

Book Final Report   Spent Nuclear Fuel Retrieval System Manipulator System Cold Validation Testing

Download or read book Final Report Spent Nuclear Fuel Retrieval System Manipulator System Cold Validation Testing written by and published by . This book was released on 1999 with total page 105 pages. Available in PDF, EPUB and Kindle. Book excerpt: Manipulator system cold validation testing (CVT) was performed in support of the Fuel Retrieval System (FRS) Sub-Project, a subtask of the Spent Nuclear Fuel Project at the Hanford Site in Richland, Washington. The FRS will be used to retrieve and repackage K-Basin Spent Nuclear Fuel (SNF) currently stored in old K-Plant storage basins. The FRS is required to retrieve full fuel canisters from the basin; clean the fuel elements inside the canister to remove excessive uranium corrosion products (or sludge); remove the contents from the canisters; and sort the resulting debris, scrap, and fuel for repackaging. The fuel elements and scrap will be collected in fuel storage and scrap baskets in preparation for loading into a multi canister overpack (MCO), while the debris is loaded into a debris bin and disposed of as solid waste. The FRS is composed of three major subsystems. The Manipulator Subsystem provides remote handling of fuel, scrap, and debris; the In-Pool Equipment subsystem performs cleaning of fuel and provides a work surface for handling materials; and the Remote Viewing Subsystem provides for remote viewing of the work area by operators. There are two complete and identical FRS systems, one to be installed in the K-West basin and one to be installed in the K-East basin. Another partial system will be installed in a cold test facility to provide for operator training.