EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Spent Nuclear Fuel  SNF  Project Design Basis Capacity Study

Download or read book Spent Nuclear Fuel SNF Project Design Basis Capacity Study written by and published by . This book was released on 2000 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

Book Spent Nuclear Fuel Project Design Basis Capacity Study

Download or read book Spent Nuclear Fuel Project Design Basis Capacity Study written by and published by . This book was released on 1996 with total page 284 pages. Available in PDF, EPUB and Kindle. Book excerpt: A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

Book   fwer hans kongl  h  ghets hertig Adolph Fredrichs lyckeliga ankomst til Stockholm  den 14 octobris 1743  Stockholm  tryckt hos Peter J  r  Nystr  m

Download or read book fwer hans kongl h ghets hertig Adolph Fredrichs lyckeliga ankomst til Stockholm den 14 octobris 1743 Stockholm tryckt hos Peter J r Nystr m written by and published by . This book was released on 1743 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Department of Energy s Hanford Spent Nuclear Fuel Project

Download or read book Department of Energy s Hanford Spent Nuclear Fuel Project written by United States. Congress. House. Committee on Commerce. Subcommittee on Oversight and Investigations and published by . This book was released on 1998 with total page 352 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel  SNF  Project Facilities VOL 1 Fuel

Download or read book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel SNF Project Facilities VOL 1 Fuel written by and published by . This book was released on 1999 with total page 162 pages. Available in PDF, EPUB and Kindle. Book excerpt: Metallic uranium Spent Nuclear Fuel (SNF) is currently stored within two water filled pools, 105-KE Basin (KE Basin) and 105-KW Basin (KW Basin), at the United States Department of Energy (U.S. DOE) Hanford Site, in southeastern Washington State. The Spent Nuclear Fuel Project (SNF Project) is responsible to DOE for operation of these fuel storage pools and for the 2100 metric tons of SNF materials that they contain. The SNF Project mission includes safe removal and transportation of all SNF from these storage basins to a new storage facility in the 200 East Area. To accomplish this mission, the SNF Project modifies the existing KE Basin and KW Basin facilities and constructs two new facilities: the 100 K Area Cold Vacuum Drying Facility (CVDF), which drains and dries the SNF; and the 200 East Area Canister Storage Building (CSB), which stores the SNF. The purpose of this document is to describe the design basis feed compositions for materials stored or processed by SNF Project facilities and activities. This document is not intended to replace the Hanford Spent Fuel Inventory Baseline (WHC 1994b), but only to supplement it by providing more detail on the chemical and radiological inventories in the fuel (this volume) and sludge. A variety of feed definitions is required to support evaluation of specific facility and process considerations during the development of these new facilities. Six separate feed types have been identified for development of new storage or processing facilities. The approach for using each feed during design evaluations is to calculate the proposed facility flowsheet assuming each feed. The process flowsheet would then provide a basis for material compositions and quantities which are used in follow-on calculations.

Book Recueil factice d articles de presse concernant les acteurs chinois

Download or read book Recueil factice d articles de presse concernant les acteurs chinois written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Spent Nuclear Fuel  SNF  Storage Project Fuel Basket Handling Grapple Design Development Test Report

Download or read book Spent Nuclear Fuel SNF Storage Project Fuel Basket Handling Grapple Design Development Test Report written by and published by . This book was released on 2000 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Acceptance testing of the SNF Fuel Basket Lift Grapple was accomplished to verify the design adequacy. This report shows the results affirming the design. The test was successful in demonstrating the adequacy of the grapple assembly's inconel actuator shaft and engagement balls for in loads excess of design basis loads (3200 pounds), 3X design basis loads (9600 pounds), and 5X design basis loads (16,000 pounds). The test data showed that no appreciable yielding for the inconel actuator shaft and engagement balls at loads in excess of 5X Design Basis loads. The test data also showed the grapple assembly and components to be fully functional after loads in excess of 5X Design Basis were applied and maintained for over 10 minutes. Following testing, each actuator shaft (Item 7) was liquid penetrant inspected per ASME Section 111, Division 1 1989 and accepted per requirements of NF-5350. This examination was performed to insure that no cracking had occurred. The test indicated that no cracking had occurred. The examination reports are included as Appendix C to this document. From this test, it is concluded that the design configuration meets or exceeds the requirements specified in ANSI N 14 6 for Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds (4500 kg) or More.

Book Progress on the Hanford K Basins Spent Nuclear Fuel Project

Download or read book Progress on the Hanford K Basins Spent Nuclear Fuel Project written by and published by . This book was released on 1996 with total page 10 pages. Available in PDF, EPUB and Kindle. Book excerpt: This paper highlights progress made during the last year toward removing the Department of Energy's (DOE) approximately, 2,100 metric tons of metallic spent nuclear fuel from the two outdated K Basins at the Hanford Site and placing it in safe, economical interim dry storage. In the past year, the Spent Nuclear Fuel (SNF) Project has engaged in an evolutionary process involving the customer, regulatory bodies, and the public that has resulted in a quicker, cheaper, and safer strategy for accomplishing that goal. Development and implementation of the Integrated Process Strategy for K Basins Fuel is as much a case study of modern project and business management within the regulatory system as it is a technical achievement. A year ago, the SNF Project developed the K Basins Path Forward that, beginning in December 1998, would move the spent nuclear fuel currently stored in the K Basins to a new Staging and Storage Facility by December 2000. The second stage of this $960 million two-stage plan would complete the project by conditioning the metallic fuel and placing it in interim dry storage by 2006. In accepting this plan, the DOE established goals that the fuel removal schedule be accelerated by a year, that fuel conditioning be closely coupled with fuel removal, and that the cost be reduced by at least $300 million. The SNF Project conducted coordinated engineering and technology studies over a three-month period that established the technical framework needed to design and construct facilities, and implement processes compatible with these goals. The result was the Integrated Process Strategy for K Basins Fuel. This strategy accomplishes the goals set forth by the DOE by beginning fuel removal a year earlier in December 1997, completing it by December 1999, beginning conditioning within six months of starting fuel removal, and accomplishes it for $340 million less than the previous Path Forward plan.

Book Plan for Characterization of K Basin Spent Nuclear Fuel  SNF  and Sludge  OCRWM

Download or read book Plan for Characterization of K Basin Spent Nuclear Fuel SNF and Sludge OCRWM written by and published by . This book was released on 2000 with total page 12 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is an update of the plan for the characterization of spent nuclear fuel (SNF) and sludge stored in the Hanford K West and K East Basins. The purpose of the characterization program is to provide fuel and sludge data in support of the SNF Project in the effort to remove the fuel from the K Basins and place it into dry storage. Characterization of the K Basin fuel and sludge was initiated in 1994 and has been guided by the characterization plans (Abrefah 1994, Lawrence 1995a, Lawrence 1995b) and the characterization program management plan (PMP) (Lawrence 1995c, Lawrence 1998, Trimble 1999). The fuel characterization was completed in 1999. Summaries of these activities were documented by Lawrence (1999) and Suyama (1999). Lawrence (1999) is a summary report providing a road map to the detailed documentation of the fuel characterization. Suyama (1999) provides a basis for the limited characterization sample size as it relates to supporting design limits and the operational safety envelope for the SNF Project. The continuing sludge characterization is guided by a data quality objective (DQO) (Makenas 2000) and a sampling and analysis plan (SAP) (Baker, Welsh and Makenas 2000) The original intent of the characterization program was ''to provide bounding behavior for the fuel'' (Lawrence 1995a). To accomplish this objective, a fuel characterization program was planned that would provide data to augment data from the literature. The program included in-situ examinations of the stored fuel and laboratory testing of individual elements and small samples of fuel (Lawrence 1995a). Some of the planned tests were scaled down or canceled due to the changing needs of the SNF Project. The fundamental technical basis for the process that will be used to place the K Basin fuel into dry storage was established by several key calculations. These calculations characterized nominal and bounding behavior of fuel in Multi-Canister Overpacks (MCOs) during processing and storage. Characterization data supported input parameters that were used for the calculations. These parameters are documented in the Project Technical Databook (Reilly 1998). Calculations and reviews used in developing the parameters describe how characterization data were used in the parameter development, e.g. statistically based, added factors of conservatism, etc.

Book Technical Basis Spent Nuclear Fuel  SNF  Project Radiation and Contamination Trending Program

Download or read book Technical Basis Spent Nuclear Fuel SNF Project Radiation and Contamination Trending Program written by and published by . This book was released on 2000 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report documents the technical basis for the Spent Nuclear Fuel (SNF) Program radiation and contamination trending program. The program consists of standardized radiation and contamination surveys of the KE Basin, radiation surveys of the KW basin, radiation surveys of the Cold Vacuum Drying Facility (CVD), and radiation surveys of the Canister Storage Building (CSB) with the associated tracking. This report also discusses the remainder of radiological areas within the SNFP that do not have standardized trending programs and the basis for not having this program in those areas.

Book DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL  SNF  PROJECT CANISTER STORAGE BUILDING  CSB

Download or read book DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL SNF PROJECT CANISTER STORAGE BUILDING CSB written by and published by . This book was released on 2003 with total page 294 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB), '' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

Book Fundamental Issues Critical to the Success of Nuclear Projects

Download or read book Fundamental Issues Critical to the Success of Nuclear Projects written by Joseph Boucau and published by Woodhead Publishing. This book was released on 2021-10-23 with total page 394 pages. Available in PDF, EPUB and Kindle. Book excerpt: Fundamental Issues Critical to the Success of Nuclear Projects presents a complete analysis of the core considerations for those deploying nuclear power plants, managing existing plants, and also for those developing and building new plants. It includes critical considerations, such as cost-estimation, safety procedures, and regulatory compliance, manpower optimization and development, and the application of innovative technologies, such as the use of robotics. Those important issues have been addressed in a systematic way, and explanations have been provided on how the nuclear industry has continuously found solutions to mitigate and eventually solve them properly. - Discusses innovative technologies being implemented in international nuclear plants to improve efficiency, safety, and cost-effectiveness in new, existing, and decommissioned nuclear power plants - Provides guidance on difficult cost estimation for nuclear projects, as well as safety procedures, legislation, and regulatory compliance both inside and outside of the United States - Considers the future of nuclear energy and analyses the challenges ahead for a sustainable nuclear energy future

Book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel Project Facilities

Download or read book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel Project Facilities written by and published by . This book was released on 1998 with total page 183 pages. Available in PDF, EPUB and Kindle. Book excerpt: Revisions 0 and 0A of this document provided estimated chemical and radionuclide inventories of spent nuclear fuel and sludge currently stored within the Hanford Sites̀ 105-K Basins. This Revision (Rev. 1) incorporates the following changes into Revision 0A: (1) updates the tables to reflect: improved cross section data, a decision to use accountability data as the basis for total Pu, a corrected methodology for selection of the heat generation basis fee, and a revised decay date; (2) adds section 3.3.3.1 to expand the description of the approach used to calculate the inventory values and explain why that approach yields conservative results; (3) changes the pre-irradiation braze beryllium value.

Book Spent Nuclear Fuel Project   Criteria Document Spent Nuclear Fuel Final Safety Analysis Report

Download or read book Spent Nuclear Fuel Project Criteria Document Spent Nuclear Fuel Final Safety Analysis Report written by and published by . This book was released on 1999 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: The criteria document provides the criteria and planning guidance for developing the Spent Nuclear Fuel (SNF) Final Safety Analysis Report (FSAR). This FSAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, installation acceptance testing, startup, and operation of the SNF Project facilities (K Basins, Cold Vacuum Drying Facility, and Canister Storage Building).

Book Spent Nuclear Fuel  SNF  Project Design Verification and Validation Process

Download or read book Spent Nuclear Fuel SNF Project Design Verification and Validation Process written by and published by . This book was released on 2000 with total page 13 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work.