EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Prairie Canal Well No  1  Calcasieu Parish  Louisiana  Volume II  Well Test Data  Final Report

Download or read book Prairie Canal Well No 1 Calcasieu Parish Louisiana Volume II Well Test Data Final Report written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The following are included in appendices: field test data, field non-edited data, raw data, tentative method of testing for hydrogen sulfide in natural gas using length of stain tubes, combined sample log, report on reservoir fluids study, well test analysis, analysis of solids samples from primary zone, chemical analysis procedures, scale and corrosion evaluation, laboratory report on scale deposits, and sand detector strip charts. (MHR).

Book Prairie Canal Well No  1  Calcasieu Parish  Louisiana  Volume 1  Completion and Testing  Final Report

Download or read book Prairie Canal Well No 1 Calcasieu Parish Louisiana Volume 1 Completion and Testing Final Report written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Prairie Canal Company, Inc. Well No. 1, approximately 8 miles south of the city of Lake Charles, Louisiana, was tested through the annulus between 5-1/2 inch casing and 2-3/8 inch tubing. The interval tested was from 14,782 to 14,820 feet. The geological section was the Hackberry Sand, a member of the Oligocene Frio formation. Produced water was injected into a disposal well which was perforated in several Miocene Sands from 3070 to 4600 feet. Original plans were to test a section of the Hackberry sand from 14,976 to 15,024 feet. This primary zone, however, produced a large amount of sand, shale, gravel, and rocks during early flow periods and was abandoned in favor of the secondary zone. Four pressure drawdown flow tests and three pressure buildup tests were conducted during a 12-day period. A total of 36,505 barrels of water was produced. The highest sustained flow rate was approximately 7100 BWPD. The gas-to-water ratio, measured during testing, ranged from 41 to 50 SCF/BBL. There is disagreement as to the saturation value of the reservoir brine, which may be between 43.3 and 49.7 SCF/BBL. The methane content of the flare line gas averaged 88.4 mole percent. The CO2 content averaged 8.4 mole percent. Measured values of H2S in the gas were between 12 and 24 ppM.

Book Prairie Canal Well No 1  Calcasieu Parish  Louisiana Final Report

Download or read book Prairie Canal Well No 1 Calcasieu Parish Louisiana Final Report written by Eaton Operating Company, Inc and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1982 with total page 760 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Geothermal Energy Update

Download or read book Geothermal Energy Update written by and published by . This book was released on 1982-12 with total page 468 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government reports annual index

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1370 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Xian Qiu wen xue lun ji

Download or read book Xian Qiu wen xue lun ji written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1983-10 with total page 1052 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Interference Problems on Wing fuselage Combinations in Inviscid  Incompressible Flow

Download or read book Interference Problems on Wing fuselage Combinations in Inviscid Incompressible Flow written by Aeronautical Research Council (Great Britain) and published by . This book was released on 1974 with total page 1212 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Petroleum Abstracts

Download or read book Petroleum Abstracts written by and published by . This book was released on 1984 with total page 778 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Petroleum Abstracts  Literature and Patents

Download or read book Petroleum Abstracts Literature and Patents written by and published by . This book was released on 1985 with total page 1406 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book T F and S DOE Gladys McCall No  1 Well  Cameron Parish  Louisiana  Geopressured geothermal Well Report  Volume II  Well Workover and Production Testing  February 1982 October 1985  Final Report  Appendices 1 7

Download or read book T F and S DOE Gladys McCall No 1 Well Cameron Parish Louisiana Geopressured geothermal Well Report Volume II Well Workover and Production Testing February 1982 October 1985 Final Report Appendices 1 7 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: These appendices contain the following reports: (1) investigation of coupling failure from the Gladys McCall No. 1 well; (2) failure analysis - oil well casing coupling; (3) technical remedial requirements for 5-inch production tubing string; (4) reservoir limit test data for sand zone No. 9; (5) reservoir fluid study - sand zone No. 9; (6) engineering interpretation of exploration drawdown tests; and (7) reservoir analysis. (ACR).

Book Godchaux Well No  1  Vermilion Parish  Louisiana

Download or read book Godchaux Well No 1 Vermilion Parish Louisiana written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Godchaux Well No. 1 was originally drilled too a total depth of 16,000 feet in January, 1981 by C and K Petroleum, Inc. and was temporarily abandoned. The well was re-entered by Eaton on 6 August 1981 in an effort to clean out the original open hole below the 7-5/8 inch liner and test a section of the Planulina sand at a depth ranging from 15,584 to 15,692 feet. The reservoir pressure was estimated to be 14,480 psi, and the temperature of the formation water was expected to be 298°F. The water salinity was predicted to be 70,000 ppM. The well was expected to produce up to 20,000 BWPD, was a gas content of 44 SCF per barrel. An optional test of a zone from 14,905 to 15,006 feet was also proposed in the detailed completion prognosis, which preceded the attempted test. In the process of drilling the cement plug set by the original operators, the drill string became side-tracked from the original hole. While drilling at 14,510 feet a severe loss of circulation of drilling fluid occurred through a hole in the intermediate casing. The reduction in hydrostatic head resulting from lost circulation caused the open hole to close around and stick the drill string. Efforts to repair the intermediate casing and return to normal operations were estimated to be prohibitively expensive in view of the expected poor probability of success; accordingly, the decision to plug and abandon was carried out on September 12, 1981.

Book Crown Zellerbach Well No  2  Livingston Parish  Louisiana  Volume I  Completion and Testing  Final Report

Download or read book Crown Zellerbach Well No 2 Livingston Parish Louisiana Volume I Completion and Testing Final Report written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Crown Zellerbach Well No. 2, approximately 23 miles east of Baton Rouge, Louisiana, is the eighth successful test of a geopressured-geothermal aquifer under the DOE Wells of Opportunity program. The well was tested through the annulus between 7-inch casing and 2-3/8 inch tubing. Two flow tests and one reservoir pressure buildup test were conducted on the lower zone during a 13-day period. A total of 12,489 barrels of water was produced. The highest flow rate achieved was about 3887 BWPD. One flow test followed by a buildup period was conducted on the combined upper and lower zones during a 3-day period. A total of 4739 barrels of water was produced. The highest flow rate achieved was about 3000 BWPD. The gas/water ratio measured during testing was about 32.0 SCF/BBL for the lower zone. The extrapolated latoratory data indicates that the solubility of the gas is 55.7 SCF/BBL. It appears that the reservoir brine is considerably undersaturated. The methane content of the flare line gas averaged 71.0 mole percent. Crown Zellerbach Company carefully studied the commercial feasibility of using the well to produce energy for a wood-drying facility and decided against the project.

Book Final Report P R

Download or read book Final Report P R written by Eaton Operating Company, Inc and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book T F and S DOE Gladys McCall No  1 Well  Cameron Parish  Louisiana  Geopressured geothermal Well Report  Volume II  Well Workover and Production Testing  February 1982 October 1985  Final Report

Download or read book T F and S DOE Gladys McCall No 1 Well Cameron Parish Louisiana Geopressured geothermal Well Report Volume II Well Workover and Production Testing February 1982 October 1985 Final Report written by and published by . This book was released on 1985 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The T-F and S/DOE Gladys McCall No. 1 well was the fourth in a series of wells in the DOE Design Wells Program that were drilled into deep, large geopressured-geothermal brine aquifers in order to provide basic data with which to determine the technological and economic viability of producing energy from these unconventional resources. This brine production well was spudded on May 27, 1981 and drilling operations were completed on November 2, 1981 after using 160 days of rig time. The well was drilled to a total depth of 16,510 feet. The target sands lie at a depth of 14,412 to 15,860 feet in the Fleming Formation of the lower Miocene. This report covers well production testing operations and necessary well workover operations during the February 1982 to October 1985 period. The primary goals of the well testing program were: (1) to determine reservoir size, shape, volume, drive mechanisms, and other reservoir parameters, (2) to determine and demonstrate the technological and economic viability of producing energy from a geopressured-geothermal brine aquifer through long-term production testing, and (3) to determine problem areas associated with such long-term production, and to develop solutions therefor.