EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Phase IIB Remedial Investigation

Download or read book Phase IIB Remedial Investigation written by and published by . This book was released on 1995 with total page 506 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Phase II Remedial Investigation feasibility Study Work Plan and Field Sampling Plan

Download or read book Final Phase II Remedial Investigation feasibility Study Work Plan and Field Sampling Plan written by PRC Environmental Management, Inc and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation

Download or read book Remedial Investigation written by Holguin & Associates Inc and published by . This book was released on 1988 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Phase II Remedial Investigation Workplan Addendum

Download or read book Draft Phase II Remedial Investigation Workplan Addendum written by Southern Pacific Transportation Company and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase II Remedial Investigation Sampling and Analysis Plan  Phase II RI SAP   Hookston Station Site  Pleasant Hill  California

Download or read book Phase II Remedial Investigation Sampling and Analysis Plan Phase II RI SAP Hookston Station Site Pleasant Hill California written by Environmental Resources Management (Firm) and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Work Plan for the Remedial Investigation

Download or read book Work Plan for the Remedial Investigation written by and published by . This book was released on 1995 with total page 149 pages. Available in PDF, EPUB and Kindle. Book excerpt: US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

Book Roto Finish Remedial Investigation

Download or read book Roto Finish Remedial Investigation written by Limno-Tech (Firm) and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation

Download or read book Remedial Investigation written by and published by . This book was released on 1986 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Work Plan  Phase II  Livingston Rail Yard  Livingston  Montana

Download or read book Remedial Investigation Work Plan Phase II Livingston Rail Yard Livingston Montana written by Montana. Solid and Hazardous Waste Bureau and published by . This book was released on 1992 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Work Plan II  Mission Wye  Montana

Download or read book Remedial Investigation Work Plan II Mission Wye Montana written by Burlington Northern Inc and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Alternatives for Managing the Nation s Complex Contaminated Groundwater Sites

Download or read book Alternatives for Managing the Nation s Complex Contaminated Groundwater Sites written by National Research Council and published by National Academies Press. This book was released on 2013-02-27 with total page 423 pages. Available in PDF, EPUB and Kindle. Book excerpt: Across the United States, thousands of hazardous waste sites are contaminated with chemicals that prevent the underlying groundwater from meeting drinking water standards. These include Superfund sites and other facilities that handle and dispose of hazardous waste, active and inactive dry cleaners, and leaking underground storage tanks; many are at federal facilities such as military installations. While many sites have been closed over the past 30 years through cleanup programs run by the U.S. Department of Defense, the U.S. EPA, and other state and federal agencies, the remaining caseload is much more difficult to address because the nature of the contamination and subsurface conditions make it difficult to achieve drinking water standards in the affected groundwater. Alternatives for Managing the Nation's Complex Contaminated Groundwater Sites estimates that at least 126,000 sites across the U.S. still have contaminated groundwater, and their closure is expected to cost at least $110 billion to $127 billion. About 10 percent of these sites are considered "complex," meaning restoration is unlikely to be achieved in the next 50 to 100 years due to technological limitations. At sites where contaminant concentrations have plateaued at levels above cleanup goals despite active efforts, the report recommends evaluating whether the sites should transition to long-term management, where risks would be monitored and harmful exposures prevented, but at reduced costs.

Book Supplemental Remedial Investigation Work Plan  3

Download or read book Supplemental Remedial Investigation Work Plan 3 written by and published by . This book was released on 2021 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Work Plan Remedial Investigation Phase 1A Lorentz Barrel and Drum

Download or read book Work Plan Remedial Investigation Phase 1A Lorentz Barrel and Drum written by CH2M HILL (Firm) and published by . This book was released on 1987 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase 2  Remedial Investigation Work Plan

Download or read book Phase 2 Remedial Investigation Work Plan written by Dames & Moore and published by . This book was released on 1989 with total page 340 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book FY 1995 Remedial Investigation Work Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this project is to provide key information needed by decision makers to expedite the process of environmental restoration and to provide the data base required by the Remedial Investigation/Feasibility Study (RI/FS) for Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL). WAG 2 is the major drainage system downgradient of other WAGs that contain significant sources of contamination at ORNL. Field activities to support the remedial investigation for the RI portion include characterization of the nature and extent of contamination in WAG 2 [consisting of White Oak Creek (WOC) and associated tributaries and floodplain, White Oak Lake (WOL), and White Oak Creek Embayment (WOCE)], specifically to support risk-based remediation decisions. The project consists of three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upslope WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate revaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Overall RI objectives, consistent with ORNL Environmental Restoration (ER) Program strategic objectives to reduce risks and comply with environmental regulations, are discussed in the WAG 2 Remedial Investigation Plan.

Book Remedial Investigation

Download or read book Remedial Investigation written by and published by . This book was released on 1996 with total page 693 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.