EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Navy DDG 1000  DD X    CG X   and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DDG 1000 DD X CG X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by and published by . This book was released on 2006 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy wants to procure three new classes of surface combatants the DDG- 1000 (formerly DD(X)) destroyer, the CG(X) cruiser, and a smaller surface combatant called the Littoral Combat Ship (LCS) The Navy wants to procure 7 DDG-l000s, 19 CG(X)s, and 55 LCSs The first two DDG-1000s are to be procured in FY2007, with each ship being split-funded (i.e., incrementally funded) across FY2007 and FY2008. The estimated cost of each ship is $3,291 million, for a total of $6,582 million. The FY2007 budget requests $2,568 million in procurement funding for the two ships. The Navy estimates that the next three DDG-1000s will cost an average of roughly $2.5 billion each. The Navy wants to procure the first CG(X) in FY2011.

Book Navy DDG 1000  DD X   and CG X  Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DDG 1000 DD X and CG X Ship Acquisition Programs Oversight Issues and Options for Congress written by and published by . This book was released on 2007 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy is procuring a new kind of destroyer called the DDG-1000 (formerly DD(X)), and wants to procure a new kind of cruiser called the CG(X). Navy plans call for procuring 7 DDG- 1000s and 19 CG(X)s between FY2007 and FY2023. The first two DDG-1000s were procured in FY2007. The Navy wants to procure the first CG(X) in FY2011 and the second in FY2013. The Navy's FY2008 budget requests $2,802 million in procurement funding to complete the Navy's estimated procurement cost for the first two DDG-1000s, which are being split-funded (i.e., incrementally funded) across FY2007 and FY2008. The Navy's combined estimated procurement cost for the two ships is $6,370 million. The two ships received $1,010 million in FY2005 and FY2006 advance procurement funding, and $2,557 million in FY2007 procurement funding. The Navy's FY2008 budget also requests $151 million in advance procurement funding for the third DDG-1000, whose procurement cost the Navy estimates at $2,563 million. The DDG-1000/CG(X) program raises several potential oversight issues for Congress, including the accuracy of Navy cost estimates for the program, the program's affordability and cost effectiveness, the acquisition strategy for the third and subsequent DDG-1000s, and the program's potential implications for the shipbuilding industrial base. Potential options for Congress for the DDG- 1000/CG(X) program include supporting the Navy's proposed plans or curtailing the DDG-1000 and/or CG(X) programs and pursuing lower-cost alternatives to the DDG- 1000 and/or CG(X) designs. The House Armed Services Committee, in its report (H. Rept. 110-146) on the FY2008 defense authorization bill (H.R. 1585), recommended approval of the Navy's request for FY2008 procurement funding for the DDG-1000. The report recommended increasing the Navy's FY2008 request for research and development funding for the DDG-1000 program by $9 million for work on permanent magnet motor technology.

Book Navy DDG 1000  DD X    CG X   and LCS Ship Acquisition Programs

Download or read book Navy DDG 1000 DD X CG X and LCS Ship Acquisition Programs written by and published by . This book was released on 2006 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy wants to procure three new classes of surface combatants -- the DDG-1000 (formerly DD(X)) destroyer, the CG(X) cruiser, and a smaller surface combatant called the Littoral Combat Ship (LCS). The Navy wants to procure 7 DDG-1000s, 19 CG(X)s, and 55 LCSs. The first two DDG-1000s are to be procured in FY2007, with each ship being split-funded (i.e., incrementally funded) across FY2007 and FY2008. The estimated cost of each ship is $3,291 million, for a total of $6,582 million. The FY2007 budget requests $2,568 million in procurement funding for the two ships. The Navy estimates that the next three DDG-1000s will cost an average of roughly $2.5 billion each. The Navy wants to procure the first CG(X) in FY2011. The first LCS was procured in FY2005, three more were procured in FY2006, and the Navy's proposed FY2007 budget requests $521 million to procure two additional ships. The Navy's FY2007 unfunded requirements list (URL) -- its "wish list" of items desired but not included in the FY2007 budget -- includes an additional two LCSs for an additional $520 million. The DDG-1000/CG(X) and LCS programs raise several oversight issues for Congress, including the affordability of the DDG-1000/CG(X) program and the acquisition strategies for both programs. FY2007 Defense Appropriations Bill (H.R. 5631). The House Appropriations Committee, in its report (H.Rept. 109-504 of June 16, 2006) on H.R. 5631, recommends approving the Navy's request for FY2007 DDG-1000 procurement funding to fully fund the procurement of one DDG-1000 rather than partially fund the procurement of the first two DDG-1000s. The report recommends approval of the $521 million requested for procuring two LCSs (page 141) and recommends increasing funding for LCS research and development work by $12.6 million above the requested amount (pages 239 and 250). The Senate Appropriations Committee, in its report (S.Rept. 109-292 of July 25, 2006) on H.R. 5631, recommends approving the Navy's request for FY2007 procurement funding for the first two DDG-1000s (page 115), and increasing the Navy's request for FY2007 DDG-1000 research and development funding by a net $1 million (pages 179 and 186). The report recommends funding the procurement of one LCS (rather than the requested two) in FY2007, and rescinding funding (in Section 8043) for one of the three LCSs procured in FY2006 (pages 114, 115-116, and 230-231). The report recommends increasing the FY2007 request for LCS research and development funding by $1.8 million (pages 177 and 185). This report will be updated as events warrant.

Book Navy DDG 1000  DD X   and CG X  Programs

Download or read book Navy DDG 1000 DD X and CG X Programs written by Ronald O'Rourke and published by . This book was released on 2006 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy wants to procure three new classes of surface combatants - the DDG-1000 (formerly DD(X)) destroyer, the CG(X) cruiser, and a smaller surface combatant called the Littoral Combat Ship (LCS). The Navy wants to procure 7 DDG-1000s, 19 CG(X)s, and 55 LCSs.

Book Navy DD X  and LCS Ship Acquisition Programs

Download or read book Navy DD X and LCS Ship Acquisition Programs written by and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure three new classes of surface combatants -- a destroyer called the DD(X), a cruiser called the CG(X), and a smaller surface combatant called the Littoral Combat Ship (LCS). Congress in FY2005 funded the procurement of the first LCS and provided advance procurement funding for the first DD(X), which the Navy wants to procure in FY2007. The FY2006-FY2011 Future Years Defense Plan (FYDP) reduces planned DD(X) procurement to one per year in FY2007-FY2011 and accelerates procurement of the first CG(X) to FY2011. The FY2006 budget requests $666 million in advanced procurement funding for the first DD(X), which is planned for procurement in FY2007, $50 million in advance procurement funding for the second DD(X), which is planned for procurement in FY2008, and $1,115 million for DD(X)/CG(X) research and development. The budget requests $613.3 million for the LCS program, including $240.5 million in research and development funding to build the second LCS, $336.0 million in additional research and development funding, and $36.8 million in procurement funding for LCS mission modules. On April 20, 2005, Department of Defense (DOD) issued a decision deferring as "premature" a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman's Ship System Division (NGSS) and General Dynamics' Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members of Congress have expressed opposition to this idea. The Emergency Supplemental Appropriations Act for 2005 (H.R. 1268) as reported in the Senate contains a provision (Sec. 1119) that would effectively prohibit such a competition. The DD(X), CG(X), and LCS programs raise several oversight issues for Congress. Options for Congress for the DD(X) program include approving the program as proposed by the Navy and supplementing the industrial base, if needed, with additional work; accelerating procurement of the lead DD(X) to FY2006 and the second DD(X) to FY2007; deferring procurement of the lead DD(X) to FY2008; procuring two or more DD(X)s per year; building DD(X)s at a single yard, or building each DD(X) jointly at two yards; terminating the DD(X) program now (or after procuring a single ship as a technology demonstrator), and supplementing the industrial base with additional work until the start of CG(X) procurement; and starting design work now on a smaller, less expensive alternative to the DD(X) and procuring this new design, rather than DD(X)s or CG(X)s, starting around FY2011. Options for Congress on the LCS program include shifting procurement funding for LCS mission modules to the Navy's ship-procurement account; procuring a few LCSs and then evaluating them before deciding whether to put the LCS into larger-scale series production; procuring LCSs at a rate of up to 10 per year; procuring LCSs at a rate of less than 5 per year; terminating the LCS program and instead procuring a new-design frigate; and terminating the LCS program and investing more in other littoral-warfare improvements. This report will be updated as events warrant.

Book Navy DD X   CG X   and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DD X CG X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by Ronald O'Rourke and published by . This book was released on 2005 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure three new classes of surface combatants a destroyer called the DD(X), a cruiser called the CG(X), and a smaller surface combatant called the Littoral Combat Ship (LCS). Congress in FY2005 funded the procurement of the first LCS and provided advance procurement funding for the first DD(X), which the Navy wants to procure in FY2007. The FY2006-FY2011 Future Years Defense Plan (FYDP) reduces planned DD(X) procurement to one per year in FY2007-FY2011 and accelerates procurement of the first CG(X) to FY2011. The FY2006 budget requests $666 million in advanced procurement funding for the first DD(X), which is planned for procurement in FY2007, $50 million in advance procurement funding for the second DD(X), which is planned for procurement in FY2008, and $1,115 million for DD(X)/CG(X) research and development. The budget requests $613.3 million for the LCS program, including $240.5 million in research and development funding to build the second LCS, $336.0 million in additional research and development funding, and $36.8 million in procurement funding for LCS mission modules. On April 20, 2005, Department of Defense (DOD) issued a decision deferring as premature a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman's Ship System Division (NGSS) and General Dynamics Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members of Congress have expressed opposition to this idea. The Emergency Supplemental Appropriations Act for 2005 (H.R. 1268) as reported in the Senate contains a provision (Sec. 1119) that would effectively prohibit such a competition.

Book Navy DD X   CG X   and LCS Ship Acquisition Programs

Download or read book Navy DD X CG X and LCS Ship Acquisition Programs written by Ronald O'Rourke and published by . This book was released on 2006 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy DD X  and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DD X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by Ronald O'Rourke and published by . This book was released on 2005 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure no more Arleigh Burke (DDG-51) class destroyers and instead wants to begin procuring two new classes of surface combatants a new destroyer called the DD(X), and a smaller surface combatant called the Littoral Combat Ship (LCS). In support of this plan, the Navy for FY2005 requested procurement funding for three final DDG-51s and initial procurement funding for the first DD(X) and the first LCS. Congress for FY2005 provided $3,445.0 million for procurement of three DDG- 51s. Congress also provided $350.5 million in advance procurement funding for the DD(X) program $221.1 million for the first DD(X), and $84.4 million for the second DD(X) and directed that procurement of DD(X)s be fully funded in the Navy s ship-procurement account rather than incrementally funded in the Navy s research and development account as the Navy had proposed for the first DD(X). Congress approved the Navy s plan to build the first LCS using research and development funds rather than shipbuilding funds, provided $214.7 million in procurement funding to fund the ship s entire construction cost (rather than about half the ship s cost, as the Navy had requested), required the next LCS (to be funded in FY2006) to be built to a second LCS design now being developed, prohibited the Navy from requesting funds in FY2006 to build a third LCS, and required all LCSs built after the lead ships of each design to be funded in the Navy s ship-procurement account rather than its research and development account. As part of the proposed FY2006 defense budget to be submitted to Congress in early February 2005, the Navy is expected to request additional advance procurement funding for the first DD(X) and procurement funding for the second LCS.

Book Navy DD X   GC X   and LCS Ship Acquisition Programs  Oversight Issues and Options for Congress

Download or read book Navy DD X GC X and LCS Ship Acquisition Programs Oversight Issues and Options for Congress written by and published by . This book was released on 2005 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in FY2006 and future years wants to procure three new classes of surface combatants a destroyer called the DD(X), a cruiser called the CG(X), and a smaller surface combatant called the Littoral Combat Ship (LCS) Congress in FY2005 funded the procurement of the first LCS and provided advance procurement funding for the first DD(X) which the Navy wants to procure in FY2007 The FY2006-FY2011 Future Years Defense Plan (FYDP) reduces planned DD(X) procurement to one per year in FY2007-FY2011 and accelerates procurement of the first CG(X) to FY2011. The FY2006 budget requests $716 million in advance procurement finding for the DD(X) program $666 million for the first DD(X), which is planned for procurement in FY2007 and 550 million for the second DD(X), which is planned for procurement in FY2008 and $1,115 million for DD(X)/CG(X) research and development The budget requests $6l3.3 million for the LCS program, including $576.5 million in research and development funding $240.5 million to build the second LCS, and $336.0 million in additional research and development funding and $36.8 million in procurement funding for LCS mission modules On April 20, 2005, Department of Defense (DOD) deferred as "premature" a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman's Ship System Division (NGSS) and General Dynamics' Bath Iron Works (GD/BIW) for the right to build all DD(X)s.

Book Crs Report for Congress

    Book Details:
  • Author : Congressional Research Service: The Libr
  • Publisher : BiblioGov
  • Release : 2013-11
  • ISBN : 9781295249053
  • Pages : 44 pages

Download or read book Crs Report for Congress written by Congressional Research Service: The Libr and published by BiblioGov. This book was released on 2013-11 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy is procuring a new kind of destroyer called the DDG-1000 (formerly DD(X)), and wants to procure a new kind of cruiser called the CG(X). Navy plans call for procuring 7 DDG-1000s and 19 CG(X)s between FY2007 and FY2023. The first two DDG-1000s were procured in FY2007. The Navy wants to procure the first CG(X) in FY2011 and the second in FY2013. The Navy's FY2008 budget requests $2,802 million in procurement funding to complete the Navy's estimated procurement cost for the first two DDG-1000s, which are being split-funded (i.e., incrementally funded) across FY2007 and FY2008. The Navy's combined estimated procurement cost for the two ships is $6,370 million. The two ships received $1,010 million in FY2005 and FY2006 advance procurement funding, and $2,557 million in FY2007 procurement funding. The Navy's FY2008 budget also requests $151 million in advance procurement funding for the third DDG-1000, whose procurement cost the Navy estimates at $2,563 million. The DDG-1000/CG(X) program raises several potential oversight issues for Congress, including the accuracy of Navy cost estimates for the program, the program's affordability and cost effectiveness, the acquisition strategy for the third and subsequent DDG-1000s, and the program's potential implications for the shipbuilding industrial base. Potential ...

Book Navy Littoral Combat Ship  LCS  Program

Download or read book Navy Littoral Combat Ship LCS Program written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011-05 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: The LCS is a relatively inexpensive Navy surface combatant equipped with modular ¿plug-and-fight¿ mission packages. The basic version of the LCS, without any mission packages, is referred to as the LCS sea frame. The Navy wants to field a force of 55 LCSs. Contents of this report: (1) Intro.; (2) Background: The LCS in General; Two Industry Teams, Each with Its Own Design; Planned Procurement Quantities; (3) Issues for Congress: New Acquisition Strategy Announced in 9/09; Unit Procurement Cost Cap; Total Program Acquisition Cost; (4) Legislative Activity for FY 2011. Appendices: Cost Growth on LCS Sea Frames; LCS Acquisition Strategy Announced in 9/09. Charts and tables. This is a print on demand publication.

Book Crs Report for Congress

    Book Details:
  • Author : Congressional Research Service: The Libr
  • Publisher : BiblioGov
  • Release : 2013-11
  • ISBN : 9781294249351
  • Pages : 112 pages

Download or read book Crs Report for Congress written by Congressional Research Service: The Libr and published by BiblioGov. This book was released on 2013-11 with total page 112 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Defense Acquisitions  Zumwalt Class Destroyer Program Emblematic of Challenges Facing Navy Shipbuilding

Download or read book Defense Acquisitions Zumwalt Class Destroyer Program Emblematic of Challenges Facing Navy Shipbuilding written by Paul L. Francis and published by DIANE Publishing. This book was released on 2009-02 with total page 21 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Navy is about to begin construction of the first Zumwalt-Class destroyer (DDG 1000) amid considerable uncertainties and a high likelihood of cost and schedule growth. Significant cost growth and schedule delays are persistent problems that continue to compromise the Navy¿s shipbuilding goals. This testimony focuses on: (1) the challenges faced by the DDG 1000 program; and (2) the strain such challenges portend for long term shipbuilding plans. Charts and tables.

Book Navy Littoral Combat Ship  LCS  Program  Background  Oversight Issues  and Options for Congress

Download or read book Navy Littoral Combat Ship LCS Program Background Oversight Issues and Options for Congress written by and published by . This book was released on 2007 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Littoral Combat Ship (LCS) is a small, fast ship that uses modular plug-and-fight mission packages, including unmanned vehicles (UVs). The basic version of the LCS, without any mission packages, is referred to as the LCS sea frame. The first LCS was procured in FY2005, another three were procured in FY2006, and two more were procured in FY2007. The Navy's proposed FY2008 budget, submitted to Congress in February 2007, requested $910.5 million in procurement funding for three more LCSs. Navy plans call for procuring a total of 55 LCSs. In response to significant cost growth in the building of the first LCSs, the Navy in March 2007 announced a proposed plan for restructuring the LCS program. On April 12, 2007, the Navy announced that the Navy and Lockheed could not reach an agreement on a restructured contract for LCS-1 and LCS-3 and that the Navy consequently was terminating construction of LCS-3. On May 10, 2007, it was reported that the Navy would ask Congress to increase the procurement cost cap for the fifth and sixth LCSs to $460 million each in FY2008 dollars. A primary issue for Congress at this point is whether to approve, reject, or modify the Navy's proposed restructuring plan, and what additional actions, if any, should be taken in response to the Navy's decision to terminate construction of LCS-3. Congress has several potential options regarding the LCS program. This report will be updated as events warrant.

Book Navy Surface Combatant Acquisition Programs

Download or read book Navy Surface Combatant Acquisition Programs written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Navy CG X  Cruiser Program  Background  Oversight Issues  and Options for Congress

Download or read book Navy CG X Cruiser Program Background Oversight Issues and Options for Congress written by and published by . This book was released on 2009 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's FY2011 budget proposes canceling the CG(X) cruiser program as unaffordable and instead building an improved version of the Arleigh Burke (DDG-51) class Aegis destroyer called the Flight III version. This report provides background information on the CG(X) program as it existed prior to its proposed cancellation. For further discussion of the proposal to build Flight III DDG-51s in lieu of CG(X)s, see CRS Report RL32109, "Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress." The report is divided into the following sections: Background; CG(X) Cruiser Program Prior to Proposed Cancellation, including Announcement of the Program, Replacement for CG-47s, Planned Procurement Schedule, Mission Orientation, Potential Design Features, and Analysis of Alternatives (AOA); and FY2011 Proposal to Cancel the CG(X) Program. Appendixes are as follows: Legislative Activity in 2009, FY2008 Defense Authorization Act Bill and Report Language, CG(X) Analysis of Alternatives (AOA), and Earlier Oversight Issues for the CG(X). The oversight issues included Prospects for Eight-Ship Program with One Ship Every Three Years, Nuclear Power, Technical Risk, Hull Design, Unit Affordability vs. Unit Capability, BMD Impact on CG(X) Numbers and Schedule, Industrial-Base Implications, and Visibility of CG(X) Research and Development Costs.

Book Navy Ddg 51 and Ddg 1000 Destroyer Programs

Download or read book Navy Ddg 51 and Ddg 1000 Destroyer Programs written by Congressional Service and published by Createspace Independent Publishing Platform. This book was released on 2018-07-19 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy procured DDG-51s from FY1985 through FY2005, and resumed procuring them in FY2010. The three DDG-51s requested for procurement in FY2019 are to be the 80th, 81st, and 82nd ships in the class. The Navy procured three DDG-1000s in FY2007-FY2009 and plans no further procurement of DDG-1000s. The 13 DDG-51s planned for procurement in FY2018-FY2022 are to be procured under a multiyear procurement (MYP) contract that Congress approved as part of its action on the Navy's FY2018 budget. DDG-51s procured in FY2017 and subsequent years are being built to a new design (the Flight III DDG-51 design), which incorporates a new and more capable radar called the Air and Missile Defense Radar (AMDR) or SPY-6 radar. The Navy estimates the combined procurement cost of the three DDG-51s requested for procurement in FY2019 at $5,292.7 million, or an average of $1,764.2 million each. The ships are to receive $39.4 million in prior-year (FY2018) Economic Order Quantity (EOQ) advance procurement (AP) funding (i.e., funding for up-front batch orders of components of DDG-51s to be procured under the FY2018-FY2022 MYP contract). The Navy's proposed FY2019 budget requests the following: the remaining $5,253.3 million in procurement funding needed to complete the estimated procurement cost for the three DDG-51s requested for FY2019; $391.9 million in additional EOQ AP funding for DDG-51s to be procured under the FY2018-FY2022 MYP contract; $54.0 million in cost-to-complete procurement funding to cover cost increases on DDG-51s procured in prior fiscal years; and $271.0 million in procurement funding to cover cost increases on Zumwalt (DDG-1000) class destroyers. Issues for Congress for FY2019 for the DDG-51 and DDG-1000 destroyer programs include the following: whether to approve, reject, or modify the Navy's FY2019 funding requests for the DDG-51 and DDG-1000 programs; whether to provide funding for the procurement of an additional DDG-51 (for a total procurement of four DDG-51s rather than three) in FY2019; continued cost growth in the DDG-1000 program; the Navy's intended shift in mission orientation for the DDG-1000s; cost, schedule, and technical risk in the Flight III DDG-51 effort; and the lack of an announced Navy roadmap for accomplishing three things in the cruiser-destroyer force: restoring ship growth margins; introducing large numbers of ships with integrated electric drive systems or other technologies that could provide ample electrical power for supporting future electrically powered weapons; and introducing technologies for substantially reducing ship operating and support (O&S) costs.