EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Papermill Pond Dam  CT 00471   Thames River Basin  Sprague  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Papermill Pond Dam CT 00471 Thames River Basin Sprague Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 71 pages. Available in PDF, EPUB and Kindle. Book excerpt: Papermill Pond Dam is a 573 ft. long composite rubble masonry, concrete, and earth embankment dam consisting of a 124.5 ft. long gravity masonry overflow section, and 84 ft. long earth embankment to the right of the overflow section and a 365 ft. long earth embankment to the left of the overflow section. About 160 ft. of the upstream face of the left embankment is paved with concrete. It is a run-of-the-river dam which is used for storing process water for a paper mill located upstream on the left bank of the river. In the left embankment there is an intake which controlled flows through a conduit to a turbine facility in a mill building located immediately downstream of the dam. The turbine has been abandoned and the mill building is in the process of being razed. The spillway for the dam is equipped with 2.3 ft. high permanent wooden flashboards. The dam is judged to be in generally good condition, but is rated as in fair condition owing to the absence of a dewatering facility. There is brush growth on both embankments. Mortar is missing from the joints of the rubble masonry section of the spillway. There is a crack in the concrete apron on the left embankment and the construction joints of the apron have opened up. Minor erosion has taken place on the downstream slope of the left embankment. The spillway can pass 7,750 cfs or about 72 percent of the routed test flood outflow without overtopping the right embankment.

Book National Program for Inspection of Non Federal Dams  Versailles Pond Dam  CT 00472   Thames River Basin  Sprague  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Versailles Pond Dam CT 00472 Thames River Basin Sprague Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam, built around 1920, has a total length of approximately 400 feet, consisting of a 184 foot long board-crested masonry spillway, a 190 foot long earth embankment, and a 27 foot long sluiceway. The top of the embankment, at elevation 88.7, is approximately 20 feet wide, 8.7 feet above the spillway crest, and 23 feet above the streambed of the Little River. With the pond level to the top of the dam, the pond impounds approximately 1000 acre-feet of water. The sluiceway at the left end of the dam leads to abandoned factory buildings about 400 feet from the dam. The intake to the sluiceway is a wood bulkhead, which contains 5 gates. Based upon the visual inspection at the site and past performance, the project is judged to be in poor condition. No evidence of instability of the project was observed. However, there are items which require maintenance, such as the dense vegetation on the embankment and the inoperable sluice gates. The spillway capacity with the pond level to the top of the dam is 13,000 cfs, which is equivalent to 108% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Paper Mill Pond Dam  CT 00621   Connecticut River Basin  Vernon  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Paper Mill Pond Dam CT 00621 Connecticut River Basin Vernon Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Paper Mill Pond consists of a 17 foot long concrete spillway and a 15 foot long concrete dam, all completely surrounded by buildings of Amerbelle Corporation. At top of a dam elevation, the dam impounds 90 acre-feet. Outlet works consist of a drawdown conduit of unknown size and twin 8-inch line for process water. Under normal conditions, the entire flow of the Hockanum River discharges over the spillway. This dam has a maximum height of 16.7 feet with the top of dam 5.5 feet above the spillway crest. The dam is in fair condition with some seepage from the face of dam and some deteriorated concrete. In addition to the operable outlet works, there is the 48-inch metal penstock that was originally used to supply water to the generator turbine. This outlet is plugged and the pipe partially filled and collapsed.

Book National Program for Inspection of Non Federal Dams  Miller Pond Dam  CT 00154   Thames River Basin  Waterford  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Miller Pond Dam CT 00154 Thames River Basin Waterford Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam, built in the 1870's, has a total length of approximately 425 feet and consists of an embankment section with upstream and downstream masonry faces and a masonry spillway section. The dam is 19.5 feet in height above the old streambed of Hunts Brook and, with the pond level to the top of the dam, impounds approximately 700 acre-feet of water. The spillway is an 87.8 foot long broad-crested weir located at the right end of the dam and is founded on bedrock. Based upon the visual inspection at the site and past performance, the project is judged to be in poor condition. There are areas which require monitoring and/or maintenance such as: seepage at several locations on the downstream face and toe of the dam, seepage of the low-level outlet culvert, the inoperable low-level outlet gate, eroded areas on the top of the dam, deteriorated masonry at several locations on the dam, and possible erosion or undermining due to high velocity flows along the downstream toe of the spillway and dam. Peak inflow to the reservoir at the 1/2 PMF is 8,610 cubic feet per second; peak outflow is 7,730 cfe with the dam overtopped by 2.7 feet. The spillway capacity with the reservoir level to the top of the dam is 1,610 cfs, which is equivalent to 21% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Packers Pond Dam  CT 00578   Thames River Basin  Plainfield  Connecticut  Phase 1 Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Packers Pond Dam CT 00578 Thames River Basin Plainfield Connecticut Phase 1 Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Packers Pond Dam, built about 1880 to provide water for industrial use, is an earth embankment impounding 450 acre-feet of water on Mill Brook. The length of the dam, including the spillway, is 325 feet. The top of the dam averages between 12-15 feet in width and is approximately 18 feet above the old streambed at the spillway discharge channel. The spillway, located at the right end of the dam, is a 64 foot long, broad-crested, stone masonry structure which provides 4.4 feet of freeboard from the crest to the top of the dam. The outlet is a concrete intake and gate structure located on the upstream slope at the left end of the dam. The gate is not functional and the size of the outlet could not be exactly determined. However, the outlet is assumed to be approximately 3 feet wide by 2.5 high. A railroad embankment runs along the downstream toe of the dam. This embankment is about 24 feet in height, with the top of the embankment approximately 12 feet higher than the top of the dam. The spillway capacity with the pond level at the top of the dam is 1700 cfs, which is 28% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Pachaug Pond Dam  CT 00663   Thames River Basin  Griswold  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Pachaug Pond Dam CT 00663 Thames River Basin Griswold Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 127 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pachaug Pond Dam is an earth embankment which has a maximum height of 17.0 ft. and is approximately 770.0 feet long. The dam is considered to be in fair to good condition. A spillway design test flood 24,800 cfs (equal to the PMF) will overtop the dam by approximately 4.0 feet.

Book National Program for Inspection of Non Federal Dams  Thames River Basin  Norwich  Connecticut  Spaulding Pond Dam  CT 00202   Spaulding Pond Dike  CT 01685   Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Thames River Basin Norwich Connecticut Spaulding Pond Dam CT 00202 Spaulding Pond Dike CT 01685 Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 108 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam, constructed in 1964 and 1965 to replace an earlier dam which failed in 1963 is an earth embankment approximately 435 feet in length with an emergency spillway at its right end. It is approximately 30.5 feet in height and has a maximum design storage of approximately 235 acre-feet. The principal spillway is a drop inlet structure. The dike, built the same time as the dam is approximately 740 feet in length and 18.5 feet in height. The upstream slope is protected by riprap to approximately 3 feet above the normal pool and grassed to the top of the slope. There is a paved roadway along the top of the dike embankment and the downstream slope is grassed and contains a toe drain. Based upon the visual inspection and past performance, the project, is judged to be in good condition. No evidence of instability of either the dam or dike was observed. Peak inflow to the pond at PMF is 780 cubic feet per second (cfs); peak outflow is 490 cfs with the dam and dike maintaining 3.0 feet of freeboard. The combined spillway capacity to the top of the project is 1142 cfs, which is equivalent to 230% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  North Grosvenordale Pond Dam  CT 00183   Thames River Basin  Thompson  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams North Grosvenordale Pond Dam CT 00183 Thames River Basin Thompson Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: North Grosvenordale Pond Dam is a composite masonry and earth dam consisting of two downstream stepped, ashlar faced masonry overflow sections, a granite block and earth fill right abutment and an earth fill right abutment and and earthfill dike on the left abutment. The entire length of the dam is about 2,400 ft. It is a run-of-the-river dam which once served the industrial needs of the downstream mill. Outflows through the millrace are now used for fire protection of the mill. North Grosvenordale Pond is about 1.5 miles long and has a surface area at spillway level of about 60 acres. The drainage area above the dam is about 99 sq. mi. and the maximum storage to the top of the dam is estimated at about 840 acre-ft. The dam is judged to be in generally fair condition. At the time of the inspections, water was flowing over the right spillway, so that it was not possible to observe the condition of the downstream ashlar face, or to determine whether there is any erosion at the toe of the spillways. The crest of the left spillway is higher than the right spillway. The difference is less than 6 in. The sluiceway through the left spillway is inoperative. Some of the left spillway stones have been dislodged and displaces. Several joints in the training walls are in need of repointing. The bridges over the spillways are in a deteriorating condition. Tree and brush growth is abundant along the left abutment dike. The spillways are not adequate to pass the 1/2 PMP test flood of 25,400 cfs without overtopping the non-overflow sections of the dam. The test flood would overtop the dike by about 2.2 ft. The spillway can pass 4,950 cfs or about 20 percent of the test flood without overtopping the dike.

Book National Program for Inspection of Non Federal Dams  Hanover Reservoir Dam  CT 00470   Thames River Basin  Sprague  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Hanover Reservoir Dam CT 00470 Thames River Basin Sprague Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 105 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam, built around 1900, is an earth embankment approximately 26.5 feet in height and 750 feet in length including a 147 foot long masonry spillway. With the reservoir level to the top of the dam, the reservoir impounds approximately 400 acre-feet of water. The top of the embankment is 6.6 feet above the spillway crest and approximately 30 feet wide with a paved road on it. The broad crested masonry spillway is located at the left end of the dam and there is a 3 span steel bridge over the spillway approach channel. The outlet works, which have been abandoned, consist of a 54 inch diameter low-level outlet and a penstock. Based upon the visual inspection at the site and past performance, the project is judged to be in poor condition. There is substantial seepage emanating from 3 locations at the toe of the downstream slope, which requires monitoring. Items which require maintenance are the dense vegetation and debris on the dam, the irregular shape of the embankment, erosion of the upstream slope, deterioration of the masonry spillway training walls and erosions of the concrete bridge piers. The questionable condition of the outlet works requires further investigation. The spillway capacity, with the reservoir level to the top of the dam, is 5,600 cfs, which is equivalent to 52% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Mono Pond Dam  CT 00258   Thames River Basin  Columbia  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mono Pond Dam CT 00258 Thames River Basin Columbia Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 110 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a concrete principal spillway, embankments to the right and left of this spillway and an emergency spillway near the right end of the dam. The principal spillway is a concrete chute with weir-boards at the upstream end and the emergency spillway is an unlined channel cut into the right end of the embankment. A swale, which will overflow to the toe of the dam at approximately the same elevation as the auxiliary spillway, exists at the left end of the dam. There is no low-level outlet at the dam. Based upon the visual inspection at the site and past performance, the dam appears to be in fair condition with items which require repair, maintenance and monitoring. These include spalling of the concrete walls at the principal spillway, seepage through the embankments, trees and brush on the embankments and in the emergency spillway, erosion of the upstream slopes, extending the embankment to fill the swale at left end of the dam, and debris and overhanging brush in the spillway discharge channels. The total spillway capacity at the same pool level is 820 cfs, which is greater than 100% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Sawmill Pond Dam  CT 00627   Thames River Basin  Voluntown  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Sawmill Pond Dam CT 00627 Thames River Basin Voluntown Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sawmill Pond dam is a 180 foot long earth embankment including a 51.5 foot long spillway and 15.5 foot wide intake structure. The dam has a maximum height of 20 feet and an impoundment capacity of 40 acre-feet. The downstream face of the earth embankment is a vertical stone masonry wall and the upstream face has a slope of 2:1. A 15.5 foot wide headrace extends from the intake structure at the left abutment to about 100 feet downstream. The maximum spillway capacity is equal to 1,120 CFS which represents only 9% of the test flood outflow. It is recommended that the owner engage the services of a registered engineer experienced in the design of dams to accomplish the following: (1) Perform detailed hydrologic and hydraulic studies to assess further the potential for overtopping the dam and the need for and means to increase the project discharge capacity; (2) Inspect the downstream face of the principal spillway with no water flowing over it; (3) Evaluate the seepage from the right embankment and the left side of the principal spillway; (4) Evaluate the need for, and design as required, a low level outlet to control the pond level; (5) Recommend and supervise the placement of riprap on the upstream face and abutments; (6) Remove trees and their root systems from the dam to a distance of 15 feet downstream and backfill the holes with appropriate compacted soil.

Book National Program for Inspection of Non Federal Dams  Mill Pond Dam  CT 00164   Connecticut River Basin  Newington  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mill Pond Dam CT 00164 Connecticut River Basin Newington Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an earth-covered, irregular natural rock formation 600 ft. long, with a top width varying from 10 to 20 ft. and a maximum height of 19 ft. The outlet for the dam is a natural rock weir spillway approximately 35 ft. wide, which is overpassed by a footbridge. The crest of the spillway is about 3 ft. below the lowest point on the dam crest. Based on visual inspection, the Mill Pond Dam is judged to be in good condition; however, during the inspection, there was a light snow cover of approximately 2 inches which may have obscured problems, such as erosion or seepage. A test flood of a 100 year frequency was selected in accordance with the Corps of Engineers' Guidelines. The calculated test flood inflow of 1,000 cfs results in a routed outflow of 990 cfs. With the water level at the top of the dam the spillway capacity is 575 cfs which is 58% of the outflow flood. The storage capacity of the Mill Pond is 52 ac.-ft. at the top of the dam.

Book National Program for Inspection of Non Federal Dams  Riverside Pond Dam  CT 00336   Thames River Basin  Stafford  Connecticut  Phase I Inspection Program

Download or read book National Program for Inspection of Non Federal Dams Riverside Pond Dam CT 00336 Thames River Basin Stafford Connecticut Phase I Inspection Program written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam at Riverside Pond is a stone-faced earth embankment dam and is used to supply process water to the adjacent factory located just downstream of the dam. the dam has a height of 21 feet and is approximately 180 feet in length (including the spillway). A single span two lane bridge spans the spillway crest. The spillway is a stone masonry/concrete cap, uncontrolled broad crested weir, 64 feet in length. There are two outlet works, one located to the right of the spillway and the other at the left of the spillway. the right outlet works is a gated underground sluiceway that supplies process water to the adjacent mill. Flows at this outlet pass through the mill and discharge through the side wall of the building foundation and return to Furnace Brook. The left outlet works is also gated and is a 42 inch diameter riveted steel plate pipe through the left dam embankment. Based on the visual inspection at the site, the dam is considered to be in POOR condition. Deficiencies observed include: cracks and voids in the upstream masonry face vegetation growing in the upstream and downstream masonry walls, cracks and bulging of the downstream face of the dam, leakage through the left intake gates and deterioration of the outlet pipe, and seepage along the downstream face. Assuming the pool elevation at the top of the dam, the spillway can pass a flow of 4,435 CFS, which represents only 69 percent of the test flood outflow.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1984 with total page 1260 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Parks Pond Dam  CT 00071   Housatonic River Basin  Danbury  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Parks Pond Dam CT 00071 Housatonic River Basin Danbury Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: Parks Pond Dam is a cyclopean masonry/earth embankment that is approximately 180 feet long and 12 feet high. The earth embankment is on the downstream side and has a 2:1 slope. The upstream face is cyclopean masonry with a vertical face. The spillway is located on the southern half of the dam and consists of a 30.5 foot long weir. There is a lower gate house for the control of a discharge pipe that passes through the base of the dam. The size of the pipe is unknown. The valve for the operation of the discharge pipe is inoperable. The drainage area is 0.5 square miles and the reservoir has 100 acre-feet of available storage. The assessment of the dam is based on the visual inspection, past operational performance and hydraulic/hydrologic computations. The dam is judged to be in poor condition with several areas that require attention. These areas include seepage through the dam and around the spillway's west training wall, deteriorated concrete of the spillway and upstream face of the dam, vegetation on the embankments and along the toe of the dam and the nonoperating status of the blowoff. The dam is classified as small and has a significant hazard potential in accordance with guidelines established by the Corps of Engineers. The test flood for this dam is 1/2 the Probable Maximum Flood (PMF). The test flood inflow is 625 cfs and the routed test flood outflow is 473 cfs. The test flood outflow will overtop the dam by 0.55 feet.

Book National Program for Inspection of Non Federal Dams  Hopeville Pond Dam  CT 00438   Thames River Basin  Griswold  Connecticut  Phase I Inspection Program

Download or read book National Program for Inspection of Non Federal Dams Hopeville Pond Dam CT 00438 Thames River Basin Griswold Connecticut Phase I Inspection Program written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam at Hopeville Pond is approximately 493 feet long (including the overflow spillway) and is an earth embankment structure. The embankment is about 18 feet high with an average crest width of 10 feet. The overflow, concrete-stone masonry vertical fall spillway, is approximately 108 feet in length and located 187 feet from the right abutment. There are two outlet works structures. The dam is judged to be in FAIR condition with several deficiencies that require attention. The deficiencies include: lack of slope protection on the upstream slope, rotting tree stumps on the upstream and downstream slopes, trees growing on the downstream slope, and seepage at the downstream toe and left abutment. The maximum spillway discharge of 3985 CFS represents only 22.9 percent of the routed test flood outflow.