EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Palmer Brook Dam MA 00205  Connecticut River Basin  Becket  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Palmer Brook Dam MA 00205 Connecticut River Basin Becket Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Palmer Brook Dam is an earthen embankment structure 33.5 feet high and 290 feet long. Based on visual inspection the dam is judged to be in good condition. It is classified as 'intermediate' in size with a 'high' hazard potential.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1985 with total page 1136 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Black Brook Dam  MA 01057   Connecticut River Basin  Blandford  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Black Brook Dam MA 01057 Connecticut River Basin Blandford Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 132 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Black Brook Dam is an earthfill embankment about 1168 feet in length, and 60 feet in height and has a reinforced concrete principal spillway which maintains the water supply pool level and controls the release of stored floodwater, and a 50 foot wide earth and ledge excavated emergency spillway channel in the right abutment. The dam and appurtenances were found to be in fair condition. The visual inspection indicated that silt from under the upstream riprap is being washed out by runoff and wave action to form small deltas in the pond, the trash rack on the riser has been damaged, the toe of the dam is wet along the abutments and the floor of the discharge channel of the emergency spillway is wet. Some maintenance and minor remedial work is required. The combined spillways have a capacity of about 5000 CFS with the water level at the top of the dam. This capacity is about 185% of the routed test flood outflow from the reservoir.

Book National Program for Inspection of Non Federal Dams  Buckley Dunton Dam  MA 00202   Connecticut River Basin  Becket  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Buckley Dunton Dam MA 00202 Connecticut River Basin Becket Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 22 foot high, 370 foot long earth embankment dam with an ungated 35 foot long spillway weir and a manually operated 24 inch main drain. The visual inspection indicated the dam to be in generally fair condition. The dam has a size classification of intermediate and a hazard potential classification of high. The Owner should institute remedial measures which include: maintenance of brush growth on the slopes, repair of eroded concrete, etc.

Book National Program for Inspection of Non Federal Dams  Diamond International Corporation  Upper Dam  MA 00562  Connecticut River Basin  Palmer  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Diamond International Corporation Upper Dam MA 00562 Connecticut River Basin Palmer Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a run-of-the-river type structure consisting of a 17 ft. high concrete overflow spillway and a 13 ft. high rockfill dike. The total height of the structure is 23 ft. from the top of the dike to the streambed at the toe of the spillway. There are deficiencies which must be corrected to assure the continual performance of this dam. The dam has been classified as intermediate in size with a hazard potential of high.

Book National Program for Inspection of Non Federal Dams  Indian Lake Dam  MA 01051  Connecticut River Basin  Becket  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Indian Lake Dam MA 01051 Connecticut River Basin Becket Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 105 pages. Available in PDF, EPUB and Kindle. Book excerpt: Indian Lake Dam is an earth embankment about 460 feet long with a height of about 15 feet above the brook channel. Near the center of the embankment is a reinforced concrete gravity wall spillway and control structure. The spillway is a free overfall straight drop type with a reinforced concrete, stone lined stilling basin and outfall channel, and provisions for flashboards or stop logs on the crest. A 30 inch square reservoir drain with hand operated sluice gate is also provided in the spillway structure. The embankment is in fair condition. The embankment is not at design height and downstream embankment protection has not been provided. The spillway is in fair condition. The spillway structure shows signs of poor workmanship and deficiencies which could eventually create hazards. Some leakage is apparently occurring under the embankment, but does not appear to be hazardous. Routing the flood flow through the reservoir starting at normal water level, but assuming that the flashboards would go out, the spillway would carry the estimated maximum outflow of 750 cfs with about 1.2 feet freeboard if the embankment is completed to design height.

Book National Program for Inspection of Non Federal Dams  Roaring Brook Dam MA 01056  Connecticut River Basin  Conway  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Roaring Brook Dam MA 01056 Connecticut River Basin Conway Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 65 ft. high, 435 ft. long earth embankment dam with an ungated spillway containing provisions for 24 inch flashboards and a manually operated 18 inch main drain. Based on the visual inspection, the dam seems to be in good condition. However, due to the lack of an accessible upstream control for the drain, the dam is considered in fair condition. It is intermediate in size with a hazard classification of high. (Author).

Book National Program for Inspection of Non Federal Dams  West Parish Filter Number 3 Dam  MA 00610   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams West Parish Filter Number 3 Dam MA 00610 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: West Parish Filter No. 3 Dam is an earthen embankment structure 37.5 feet high and 800 feet long. A side-channel spillway is located at the right abutment. It has a concrete overflow section which is 23.4 feet long. Outlet piping passes beneath the embankment and connects directly to the water treatment plant which serves the City of Springfield, Mass. The dam is situated on a very small (0.07 sq. mi) drainage area, and serves as offstream storage and as a sedimentation basin for water which is piped from other dams. Based on the visual inspection, the dam is judged to be in fair condition. The following deficiencies were observed at the dam: a soft, wet area near the downstream toe; a row of evergreen trees along the downstream toe with some roots penetrating the embankment; rodent holes on the downstream slope; wheel tracks on the crest of the dam; misaligned riprap and loose rock and trees overhanging the spillway; low areas on the top of the dam; and no means of controlling flow at the upstream end of the outlet conduit. The spillway capacity is about 335 percent of the routed test flood outflow of 142 cfs. During the test flood, the freeboard would be 1.9 feet.

Book National Program for Inspection of Non Federal Dams  Textile Printing Co   Upper  Dam  MA00560   Connecticut River Basin  Palmer  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Textile Printing Co Upper Dam MA00560 Connecticut River Basin Palmer Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam has a length of about 230 ft. including the earth embankment on the right side and the canal on the left side structure. The gate house at the upstream end of the canal is considered to be in poor condition while the remaining portions of this facility are in general, fair condition. The dam is intermediate in size having a significant hazard potential. There are deficiencies which must be corrected to assure the continual performance of this dam. (Author).

Book National Program for Inspection of Non Federal Dams  Congamond Lakes North Dike  MA 00072   Connecticut River Basin  Southwick  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Congamond Lakes North Dike MA 00072 Connecticut River Basin Southwick Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: Congamond Lakes North Dike impounds North Pond which is one of the three ponds which make up the Congamond Lakes. All of the three ponds, North Pond, South Pond and Middle Pond are interconnected by culverts or bridges. Together the three ponds are approximately three miles long and up to one-third mile wide with a total surface area of about 465 acres. The North Dike was constructed to replace an earlier dike (which plugged an old canal) and which failed in 1955. The North Dike is approximately 80 feet long with a maximum height of 29 feet. The present condition of the dike is fair. There is no spillway nor regulating gates at North Dike. The present outlet for the lakes is at Middle Pond where Berkshire Avenue crosses Great Brook about 2 miles to the south of North Dike. During annual floods, the direction of flow in Great Brook reverses itself and flows back towards Congamond Lakes. The outlet structure at Berkshire Avenue has stoplogs which are inserted to prevent Great Brook from flooding back into the lakes. While the stoplogs are in place, Congamond Lakes has no outlet. After the flood stage of Great Brook recedes, the stoplogs are removed and Congamond Lakes are allowed to drain. The PMF inflow into Congamond Lakes, assuming that the stoplogs are in place at Berkshire Avenue would cause the lake level to rise to approximate elevation 232 MSL which is about 2 feet below the top of the dike.

Book National Program for Inspection of Non Federal Dams  Lake Rohunta  MA 00012   Connecticut River Basin  Athol  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lake Rohunta MA 00012 Connecticut River Basin Athol Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a central 46 foot wide concrete spillway flanked by earthen embankments. The western embankment has a length of 250 feet and the eastern embankment has a length of about 280 feet. The dam has a size classification of intermediate and a hazard classification of low. The dam is in generally good condition. It is felt, however, that certain items which are generally normal maintenance and operational procedures need attention. The spillway will pass only 12% of the test flood outflow; the embankment will be overtopped by 3 feet.

Book National Program for Inspection of Non Federal Dams  Woronoco Mills  60 Feet  Dam MA 00738  Woronoco Mills  29 Feet  Dam MA 00737  Connecticut River Basin  Russell  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Woronoco Mills 60 Feet Dam MA 00738 Woronoco Mills 29 Feet Dam MA 00737 Connecticut River Basin Russell Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 111 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dams are in fair condition, due to the potential overtopping of the dams during the occurrence of the test flood and the reported overtopping of the dams during prior floods. There is some eroding of concrete joints in the dam, deteriorated concrete on appurtenant structures and observed seepage both from the joints in the concrete and from the embankments. The east dike is heavily overgrown with brush and young trees. Hydraulic analysis indicates that the test flood stage would be at elevation 240.3 which is approximately 4.3 feet above the top of the right embankment. Approximately 95 percent of the test flood would pass over the 60 foot dam, 29 foot dam and the small dam spillways. The remaining flow would be over the right embankment between the screen house and the mill building.

Book National Program for Inspection of Non Federal Dams  Perley Brook Reservoir Dam  MA 00119  Connecticut River Basin  Gardner  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Perley Brook Reservoir Dam MA 00119 Connecticut River Basin Gardner Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Perley Brook Reservoir Dam is a 1000 foot long earthfill dam. The dam has a maximum height of 50 feet with the top at Elevation 1032.0. The dam is in fair condition. The dam has been classified in the 'intermediate' size and 'high' hazard categories. A test flood equal to the full PMF was used to evaluate the capacity of the spillway. (Author).

Book National Program for Inspection of Non Federal Dams  McLean Reservoir  MA 00539   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams McLean Reservoir MA 00539 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.

Book National Program for Inspection of Non Federal Dams  Country Club  MA 00756   Connecticut River Basin  Northampton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Country Club MA 00756 Connecticut River Basin Northampton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is basically comprised of 2 stone masonry vertical faced spillways. The main spillway has a length of 69 ft. and a structural height of 32 ft. The secondary spillway has a length of 30 ft. and a height of about 9 ft. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The size classification is small with a hazard potential of significant. Due to the lack of drawdown capabilities, the dam is considered in fair condition. (Author).

Book National Program for Inspection of Non Federal Dams  Stevens Paper Company  Lower  Dam  MA 00074   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Stevens Paper Company Lower Dam MA 00074 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam generally consists of a 190 foot masonry spillway, an earthfill embankment and 2 outlet pipes. The dam was designed in 1955 by Stone and Webster Engineering Corporation to replace an earlier dam, which was damaged by the flood of that year. Construction which utilized portions of the original structure was completed in 1957. The visual inspection showed the dam to be in good condition. However, water passing over the spillway limited the inspection of the spillway. The spillway is capable of passing 96% of the test flood outflow. The top of the embankment, elevation 175, would be overtopped by about 1 foot. However, failure under this condition would only cause insignificant damage as the downstream flooding would have already occurred. The dam is generally in good condition. However, it is recommended that the owner repair the drawdown outlet, and operate it at least once yearly to insure continued adequacy. After this outlet is repaired, or during a period of low flow, the owner should engage a qualified engineer to inspect the spillway without water flowing over it. Also the erosion of a retaining wall downstream of the spillway on the right abutment side should be repaired.