EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Dam Safety Program  Cedar Hill Lake Number 1 Dam  MO 30073   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Cedar Hill Lake Number 1 Dam MO 30073 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by PRC CONSOER TOWNSEND INC ST LOUIS MO. and published by . This book was released on 1979 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Cedar Hill Lake Number 2 and Number 3 Dams  MO 30005  and  MO 31020   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Cedar Hill Lake Number 2 and Number 3 Dams MO 30005 and MO 31020 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Walter G. Shifrin and published by . This book was released on 1979 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: Based on the criteria in the guidelines, the dams are in the high hazard potential classification, which means that loss of life and appreciable property loss could occur in the event of failure. Our inspection and evaluation indicates that the spillway of Cedar Hill Lake No. 2 and No. 3 Dams meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. These dams are small size dams with a high hazard potential required by the guidelines to pass from one-half of the Probable Maximum Flood to the Probable Maximum Flood without overtopping. Considering the small volume of water impounded, and the large floodplain downstream, one-half of the PMF is the appropriate Spillway Design Flood (SDF). It was determined that the spillways will pass 55 percent of the Probable Maximum Flood without overtopping the dam. Our evaluation indicates that the spillways will pass the 100-year flood; that is, a flood having a 1 percent chance of being equalled or exceeded during any given year.

Book Technical Abstract Bulletin

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 206 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Lake Virginia Dam  MO 30425   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Lake Virginia Dam MO 30425 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Henry M. Reitz and published by . This book was released on 1978 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. This dam has been classified as unsafe, non-emergency by the St. Louis District as a result of the application of the following criteria: (1) Spillway will not pass 15 percent of the Probable Maximum Flood; (2) Overtopping could result in dam failure; and (3) DAm failure significantly increases the hazard to loss of life downstream.

Book National Dam Safety Program  Clear Lake Dam  MO 30437   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Clear Lake Dam MO 30437 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Walter G. Shifrin and published by . This book was released on 1981 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assessess the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Cole Lake Dam  MO 30440   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Cole Lake Dam MO 30440 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by HORNER AND SHIFRIN INC ST LOUIS MO. and published by . This book was released on 1979 with total page 59 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Francois Lake Dam  MO 31389   Upper Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Francois Lake Dam MO 31389 Upper Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Ralph E. Sauthoff and published by . This book was released on 1981 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam has been classified as unsafe, non-emergency by the St. Louis District as a result of the application of the following criteria: Spillways will not pass 50 percent of the Probable Maximum Flood without overtopping the dam; Overtopping of the dam could result in failure of the dam; and Dam failure significantly increases the hazard to loss of life downstream.

Book National Dam Safety Program  Siesta Lake Dam  MO 31199   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Siesta Lake Dam MO 31199 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Walter G. Shifrin and published by . This book was released on 1981 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book Mississippi Kaskaskia St  Louis Basin  Becker Lake Dam  No  Name 250   Jefferson County  Missouri Phase 1 Inspection Report  National Dam Safety Program

Download or read book Mississippi Kaskaskia St Louis Basin Becker Lake Dam No Name 250 Jefferson County Missouri Phase 1 Inspection Report National Dam Safety Program written by United States. Army. Corps of Engineers. St. Louis District and published by . This book was released on 1978 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Valle Lake Dam  MO 30438   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Valle Lake Dam MO 30438 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Walter G. Shifrin and published by . This book was released on 1981 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Little Lake Dam  MO 30456   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Little Lake Dam MO 30456 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Walter G. Shifrin and published by . This book was released on 1981 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Becker Lake Dam  No Name 250   MO 30435   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Becker Lake Dam No Name 250 MO 30435 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by ARMY ENGINEER DISTRICT ST LOUIS MO. and published by . This book was released on 1978 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Pine Lake Dam  MO 30447   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Pine Lake Dam MO 30447 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Albert B Becker (Jr) and published by . This book was released on 1978 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: Certain deficiencies were noticed during the visual inspection and are considered to have an adverse effect on the overall safety and future operation of the dam and spillway. The upstream slope of the dam is irregular (maximum slope ratio is approximately 1v on 1.3h) beginning at a level about 12 feet below the top of the dam. Excessive irregularities of the face of the dam are indications of instability and/or erosion, both of which are considered detrimental to the safety of the dam. A substantial cover of small trees and brush that may conceal animal burrows exists on the upstream and downstream slopes of the dam. The tree roots and animal burrows can provide a pathway for lake seepage that may develop into a piping condition. The upstream slope has a grass cover to protect it from erosion by wave action. Grass cover is not considered adequate to prevent erosion by wave action for a fluctuating lake level. Loss of material can result in instability and settlement of the dam crest. A dense growth of brush and small trees obstructs the spillway crest and outlet channel.

Book National Dam Safety Program  Highway 21 Lake Dam  MO 31402   Upper Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Highway 21 Lake Dam MO 31402 Upper Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Harold B. Lockett and published by . This book was released on 1981 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Dehner Lake Dam  MO 30423   Upper Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Dehner Lake Dam MO 30423 Upper Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Ralph E. Sauthoff and published by . This book was released on 1981 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Big Lake Dam  MO 30457   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Big Lake Dam MO 30457 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Walter G. Shifrin and published by . This book was released on 1981 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Book National Dam Safety Program  Fon Du Lac  MO 10699   Mississippi   Kaskaskia   St  Louis Basin  Jefferson County  Missouri  Phase I Inspection Report

Download or read book National Dam Safety Program Fon Du Lac MO 10699 Mississippi Kaskaskia St Louis Basin Jefferson County Missouri Phase I Inspection Report written by Henry M. Reitz and published by . This book was released on 1978 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: Fon-du-lac Subdivision Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Failure would threaten the life and property of ten families and cause appreciable damage to two county roads. Our inspection and evaluation indicates the dam is deficient in that the spillway is inadequate. The guidelines for a dam having the above size and hazard potential require that the spillway be capable of passing a one-half PMF (Probable Maximum Flood). The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions reasonably possible in the region. Considering the small volume of water impounded, the large floodplain downstream and the three groups of farm buildings downstream, one-half PMF is the appropriate spillway design flood. A 20% PMF will begin to overtop the dam. The lake and spillway are adequate to contain a 1% annual probability flood (100-year flood) without overtopping the dam.