EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Integrated Hot Fuel Gas Cleaning for Advanced Gasification Combined Cycle Processes VOLUME IV  JOULE II   PROGRAMME CLEAN COAL TECHNOLOGY R D 2nd Phase

Download or read book Integrated Hot Fuel Gas Cleaning for Advanced Gasification Combined Cycle Processes VOLUME IV JOULE II PROGRAMME CLEAN COAL TECHNOLOGY R D 2nd Phase written by and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Joule II   Programme Clean Coal Technology R D

Download or read book Joule II Programme Clean Coal Technology R D written by A. J. Minchener and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Integrated Hot Fuel gas Cleaning for Advanced Gasification Combined Cycle

Download or read book Integrated Hot Fuel gas Cleaning for Advanced Gasification Combined Cycle written by Harwell Laboratory. Coal R & D Programme and published by . This book was released on 1996 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Integrated Hot Fuel gas Cleaning for Advanced Gasification Combined Cycle Processes

Download or read book Integrated Hot Fuel gas Cleaning for Advanced Gasification Combined Cycle Processes written by Harwell Laboratory. Coal R & D Programme and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Novel Gas Cleaning Conditioning for Integrated Gasification Combined Cycle

Download or read book Novel Gas Cleaning Conditioning for Integrated Gasification Combined Cycle written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Development efforts have been underway for decades to replace dry-gas cleaning technology with humid-gas cleaning technology that would maintain the water vapor content in the raw gas by conducting cleaning at sufficiently high temperature to avoid water vapor condensation and would thus significantly simplify the plant and improve its thermal efficiency. Siemens Power Generation, Inc. conducted a program with the Gas Technology Institute (GTI) to develop a Novel Gas Cleaning process that uses a new type of gas-sorbent contactor, the ''filter-reactor''. The Filter-Reactor Novel Gas Cleaning process described and evaluated here is in its early stages of development and this evaluation is classified as conceptual. The commercial evaluations have been coupled with integrated Process Development Unit testing performed at a GTI coal gasifier test facility to demonstrate, at sub-scale the process performance capabilities. The commercial evaluations and Process Development Unit test results are presented in Volumes 1 and 2 of this report, respectively. Two gas cleaning applications with significantly differing gas cleaning requirements were considered in the evaluation: IGCC power generation, and Methanol Synthesis with electric power co-production. For the IGCC power generation application, two sets of gas cleaning requirements were applied, one representing the most stringent ''current'' gas cleaning requirements, and a second set representing possible, very stringent ''future'' gas cleaning requirements. Current gas cleaning requirements were used for Methanol Synthesis in the evaluation because these cleaning requirements represent the most stringent of cleaning requirements and the most challenging for the Filter-Reactor Novel Gas Cleaning process. The scope of the evaluation for each application was: (1) Select the configuration for the Filter-Reactor Novel Gas Cleaning Process, the arrangement of the individual gas cleaning stages, and the probable operating conditions of the gas cleaning stages to conceptually satisfy the gas cleaning requirements; (2) Estimate process material & energy balances for the major plant sections and for each gas cleaning stage; (3) Conceptually size and specify the major gas cleaning process equipment; (4) Determine the resulting overall performance of the application; and (5) Estimate the investment cost and operating cost for each application. Analogous evaluation steps were applied for each application using conventional gas cleaning technology, and comparison was made to extract the potential benefits, issues, and development needs of the Filter-Reactor Novel Gas Cleaning technology. The gas cleaning process and related gas conditioning steps were also required to meet specifications that address plant environmental emissions, the protection of the gas turbine and other Power Island components, and the protection of the methanol synthesis reactor. Detailed material & energy balances for the gas cleaning applications, coupled with preliminary thermodynamic modeling and laboratory testing of candidate sorbents, identified the probable sorbent types that should be used, their needed operating conditions in each stage, and their required levels of performance. The study showed that Filter-Reactor Novel Gas Cleaning technology can be configured to address and conceptually meet all of the gas cleaning requirements for IGCC, and that it can potentially overcome several of the conventional IGCC power plant availability issues, resulting in improved power plant thermal efficiency and cost. For IGCC application, Filter-Reactor Novel Gas Cleaning yields 6% greater generating capacity and 2.3 percentage-points greater efficiency under the Current Standards case, and more than 9% generating capacity increase and 3.6 percentage-points higher efficiency in the Future Standards case. While the conceptual equipment costs are estimated to be only slightly lower for the Filter-Reactor Novel Gas Cleaning processes than for the conventional processes, the improved power plant capacity results in the potential for significant reductions in the plant cost-of-electricity, about 4.5% for the Current Standards case, and more than 7% for the Future Standards case. For Methanol Synthesis, the Novel Gas Cleaning process scheme again shows the potential for significant advantages over the conventional gas cleaning schemes. The plant generating capacity is increased more than 7% and there is a 2.3%-point gain in plant thermal efficiency. The Total Capital Requirement is reduced by about 13% and the cost-of-electricity is reduced by almost 9%. For both IGCC Methanol Synthesis cases, there are opportunities to combine some of the filter-reactor polishing stages to simplify the process further to reduce its cost. This evaluation has devised plausible humid-gas cleaning schemes for the Filter-Reactor Novel Gas Cleaning process that might be applied in IGCC and Methanol Synthesis applications.

Book Trace Element Emissions

Download or read book Trace Element Emissions written by Leslie L. Sloss and published by . This book was released on 2000 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Dry Syngas Purification Processes for Coal Gasification Systems

Download or read book Dry Syngas Purification Processes for Coal Gasification Systems written by Makoto Kobayashi and published by Elsevier. This book was released on 2020-10-18 with total page 290 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dry Syngas Purification Processes for Coal Gasification Systems illustrates the promising development status of dry syngas purification for various power generation systems based on coal gasification. The core advantages of dry syngas purification, methodologies for impurity measurement, sorbents development, and evaluation of process performance are described in-depth, and from a practical perspective that is based on current research and development. Reviewing key findings from process integration, the book encompasses scale-up strategies from pilot processes to achieve dry syngas processing for new build plants. The book provides researchers and engineers with practical information to realize dry syngas purification processes for each context. Delivers pathways to realize dry syngas purification processes customized to specific power plant contexts Provides analytical tools to facilitate plant operators in examining and interpreting the relevant impurities of coal gasification and gas treatment processes Illustrates rational strategies for developing capable and durable dry removal sorbent for syngas impurities Describes process design and integration through key engineering evaluation Describes scale-up strategies of dry syngas processing for their deployment in new plants Provides prospects on the development of future coal energy conversion system adopting dry syngas purification processes

Book Hot Gas Cleanup in Gasification based Power Generation Systems

Download or read book Hot Gas Cleanup in Gasification based Power Generation Systems written by W. J. McMichael and published by . This book was released on 1990 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Hot Warm Gas Cleanup

Download or read book Hot Warm Gas Cleanup written by and published by . This book was released on 2001 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: Using regenerable sorbents and transport or fluid-bed contacting, the Gas Process Development Unit (GPDU) at NETL-Morgantown will be used to demonstrate the process feasibility of removing sulfur from coal gasification or other fuel gas streams at temperatures above dew point of the gas. This technology, also known as hot or warm gas desulfurization, is expected to remove sulfur to concentrations lower than conventional systems at comparable cost. The project was constructed under the U.S. Department of Energy (DOE) Integrated Gasification Combined Cycle (IGCC) power system program and is an ''enabling technology'' in the Vision 21 program. The GPDU was designed to be the smallest scale research and development facility capable of providing viable scale-up design data for new integrated transport or fluid-bed desulfurization processes. With the capability to test at process conditions representative of anticipated commercial applications in terms of temperatures, pressures, major compositions, velocities, and sorbent cycling, the unit is expected to generate important information on process control, configuration, and sorbent suitability. In this way, the GPDU fills a strategic role between past/current small-scale testing and large-scale demonstrations. A primary objective of the project is to gain insight into which reactor combination (i.e., both transport, both fluid bed, or mixed) is more suitable for desulfurization technology and why. Assuming process feasibility is demonstrated, this guides future development or commercial ventures by answering the question of what to build, and provides performance and scale-up data (e.g., required transport reactor densities). Another important objective, which naturally derives from the process development activities, is demonstration of sorbent suitability and readiness for commercial deployment (e.g., sorbent attrition and cycle life). In this sense, the GPDU can serve as a final testing ground to reduce the risks of large-scale sorbent failure.

Book Gas Cleaning at High Temperatures

Download or read book Gas Cleaning at High Temperatures written by R. Clift and published by Springer Science & Business Media. This book was released on 2012-12-06 with total page 692 pages. Available in PDF, EPUB and Kindle. Book excerpt: 2nd International Symposium

Book Desulfurization of Hot Coal Gas

Download or read book Desulfurization of Hot Coal Gas written by Aysel T. Atimtay and published by Springer Science & Business Media. This book was released on 2013-06-29 with total page 409 pages. Available in PDF, EPUB and Kindle. Book excerpt: Economic and environmental requirements for advanced power generating systems demand the removal of corrosive and other sulfurous compounds from hot coal gas. After a brief account of the world energy resources and an overview of clean coal technologies, a review of regenerable metal oxide sorbents for cleaning the hot gas is provided. Zinc oxide, copper oxide, calcium oxide, manganese oxide based as well as supported and mixed metal oxide sorbents are treated. Performance analysis of these sorbents, effects of various parameters on the desulfurization efficiency, kinetics of sulfidation and regeneration reactions, sulfiding and regeneration mechanisms are discussed. Two chapters present recent results in the direct production of elemental sulfur from regeneration or SO2-rich gases.

Book Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal Derived Syngas

Download or read book Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal Derived Syngas written by and published by . This book was released on 2010 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: One of the key obstacles for the introduction of commercial gasification technology for the production of power with Integrated Gasification Combined Cycle (IGCC) plants or the production of value added chemicals, transportation fuels, and hydrogen has been the cost of these systems. This situation is particularly challenging because the United States has ample coal resources available as raw materials and effective use of these raw materials could help us meet our energy and transportation fuel needs while significantly reducing our need to import oil. One component of the cost of these systems that faces strong challenges for continuous improvement is removing the undesirable components present in the syngas. The need to limit the increase in cost of electricity to

Book Advanced Gas Purification Technologies for Co gasification of Coal  Refineryby products  Biomass and Waste  Targeted to Clean Power Produced from Gas Andsteam Turbine Generator Sets and Fuel Cells  Agapute

Download or read book Advanced Gas Purification Technologies for Co gasification of Coal Refineryby products Biomass and Waste Targeted to Clean Power Produced from Gas Andsteam Turbine Generator Sets and Fuel Cells Agapute written by and published by . This book was released on 2011 with total page 291 pages. Available in PDF, EPUB and Kindle. Book excerpt: The objective of the project was to improve cleaning technologies, to be modelled, validated, interlinked in optimised processes and economically assessed for application to syngas, considering the enlargement of the fuel panorama. The work was organised in two main lines. The first line focused on the improvement of purification technologies, carried out at two levels : (a) development of better performing models ; (b) scientific advancement on improved and innovative technologies. Level (a) activities carried out in WP3, interlinked with WP1-2 and WP13-16, produced a repository containing relevant techno-economic details about various gasification process scenarios. Level (b) activities were the subject of WP4-12. Although valuable scientific advancements have been reached, as demonstrated by published material in archived journals, their techno-economic impact in actual gasification processes has been achieved in only a few cases, mainly because this advanced knowledge could only be tested at the laboratory scale. The second line refers to the modelling, validation and techno-economic evaluation of optimised process schemes for gas cleaning, targeted at enhancing the industrial design of gasification processes at a preliminary stage. WP13 created and validated an innovative superstructure for modelling and simulating gasification processes that is supported by a modular software toolset (WP13-16), open to new features, standards-compliant, interoperable and allows for future development. A versatile simulation and optimisation toolkit was carried out for the first time for the preliminary design of new process alternatives, the redesign of existing ones and improvement of the operating conditions of real plants. However, further development is needed for commercial use.

Book Bench Scale Demonstration of Hot Gas Desulfurization Technology

Download or read book Bench Scale Demonstration of Hot Gas Desulfurization Technology written by and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Department of Energy (DOE), Federal Energy Technology Center (FETC), is sponsoring research in advanced methods for controlling contaminants in hot coal gasifier gas (coal-derived fuel-gas) streams of integrated gasification combined-cycle (IGCC) power systems. The hot gas cleanup work seeks to eliminate the need for expensive heat recovery equipment, reduce efficiency losses due to quenching, and minimize wastewater treatment costs.

Book Pilot Gasification and Hot Gas Cleanup Operations

Download or read book Pilot Gasification and Hot Gas Cleanup Operations written by and published by . This book was released on 1995 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Morgantown Energy Technology Center (METC) has an integrated gasification hot gas cleanup facility to develop gasification, hot particulate and desulfurization process performance data for IGCC systems. The objective of our program is to develop fluidized-bed process performance data for hot gas desulfurization and to further test promising sorbents from lab-scale screening studies at highpressure (300 psia), and temperatures (1,200°F) using coal-derived fuel gases from a fluid-bed gasifier. The 10-inch inside diameter (ID), nominal 80 lb/hr, air blown gasifier is capable of providing about 300 lb/hr of low BTU gas at 1,000°F and 425 psig to downstream cleanup devices. The system includes several particle removal stages, which provide the capability to tailor the particle loading to the cleanup section. The gas pressure is reduced to approximately 300 psia and filtered by a candle filter vessel containing up to four filter cartridges. For batch-mode desulfurization test operations, the filtered coal gas is fed to a 6-inch ID, fluid-bed reactor that is preloaded with desulfurization sorbent. Over 400 hours of gasifier operation was logged in 1993 including 384 hours of integration with the cleanup rig. System baseline studies without desulfurization sorbent and repeatability checks with zinc ferrite sorbent were conducted before testing with the then most advanced zinc titanate sorbents, ZT-002 and ZR-005. In addition to the desulfurization testing, candle filters were tested for the duration of the 384 hours of integrated operation. One filter was taken out of service after 254 hours of filtering while another was left in service. At the conclusion of testing this year it is expected that 3 candles, one each with 254, 530, and 784 hours of filtering will be available for analysis for effects of the exposure to the coal gas environment.

Book NOVEL GAS CLEANING

    Book Details:
  • Author :
  • Publisher :
  • Release : 2001
  • ISBN :
  • Pages : 5 pages

Download or read book NOVEL GAS CLEANING written by and published by . This book was released on 2001 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: The objective of this program is to develop and evaluate novel sorbents for the Siemens Westinghouse Power Company's (SWPC's) ''Ultra-Clean Gas Cleaning Process'' for reducing to near-zero levels the sulfur- and chlorine-containing gas emissions and fine particulate matter (PM2.5) caused by fuel bound constituents found in carbonaceous materials, which are processed in Integrated Gasification Combined Cycle (IGCC) technologies.