EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Hanford Site Tank 241 SY 101  Damaged Equipment Removal

Download or read book Hanford Site Tank 241 SY 101 Damaged Equipment Removal written by and published by . This book was released on 1993 with total page 12 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site Tank 241-SY-101 has a history of generating hydrogen-nitrous oxide gases. The gases are generated and trapped in the non-convective waste layer near the bottom of the 23-m- (75-ft- ) diameter underground tank. Approximately every three months the pressure in the tank is relieved as the trapped gases are released through or around the surface crust into the tank dome. This process moves large amounts of liquid waste and crust material around in the tank. The moving waste displaced air lances and thermocouple assemblies (2-in. schedule-40 pipe) installed in four tank risers and permanently bent them to a maximum angle of 40 degrees. The bends were so severe that assemblies could not be removed from the tank using the originally designed hardware. Just after the tank releases the trapped gas, a 20-to-30-day work ''window'' opens.

Book Hanfor Site Tank 241 SY 101  Damaged Equipment Removal

Download or read book Hanfor Site Tank 241 SY 101 Damaged Equipment Removal written by and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Radioactive Waste Management

Download or read book Radioactive Waste Management written by and published by . This book was released on 1981 with total page 726 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Removal of Technetium from Hanford Tank 241 AP 101

Download or read book Removal of Technetium from Hanford Tank 241 AP 101 written by Ingrid E. Burgeson and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Structural Analysis of the Equipment Removal System for Tank 241SY101

Download or read book Structural Analysis of the Equipment Removal System for Tank 241SY101 written by and published by . This book was released on 1995 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Transactions of the American Nuclear Society

Download or read book Transactions of the American Nuclear Society written by American Nuclear Society and published by . This book was released on 1993 with total page 596 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Operability Test Procedure  Tank  241 SY 101 Equipment Removal System

Download or read book Operability Test Procedure Tank 241 SY 101 Equipment Removal System written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book An Assessment of the Dilution Required to Mitigate Hanford Tank 241 SY 101

Download or read book An Assessment of the Dilution Required to Mitigate Hanford Tank 241 SY 101 written by John D. Hudson and published by . This book was released on 1995 with total page 23 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Turning the Corner on Hanford Tank Waste Cleanup From Safe Storage to Closure

Download or read book Turning the Corner on Hanford Tank Waste Cleanup From Safe Storage to Closure written by and published by . This book was released on 2002 with total page 15 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Department of Energy (DOE), Office of River Protection (ORP) is leading the River Protection Project (RPP) which is responsible for the disposition of 204,000 cubic meters (54 million gallons) of high-level radioactive waste that have accumulated in large underground tanks at the Hanford Site since 1944. ORP continues to make good progress on improving the capability to treat Hanford tank waste. Design of the waste vitrification facilities is proceeding well and construction will begin within the next year. Progress is also being made in reducing risk to the worker and the environment from the waste currently stored in the tank farms. Removal of liquids from single-shell tanks (SSTs) is on schedule and we will begin removing solids (salt cake) from a tank (241-U-107) in 2002. There is a sound technical foundation for the waste vitrification facilities. These initial facilities will be capable of treating (vitrifying) the bulk of Hanford tank waste and are the cornerstone of the clean-up strategy. ORP recognizes that as the near-term work is performed, it is vital that there be an equally strong and defensible plan for completing the mission. ORP is proceeding on a three-pronged approach for moving the mission forward. First, ORP will continue to work aggressively to complete the waste vitrification facilities. ORP intends to provide the most capable and robust facilities to maximize the amount of waste treated by these Initial facilities by 2028 (regulatory commitment for completion of waste treatment). Second, and in parallel with completing the waste vitrification facilities, ORP is beginning to consider how best to match the hazard of the waste to the disposal strategy. The final piece of our strategy is to continue to move forward with actions to reduce risk in the tank farms and complete cleanup. The goal of these efforts is to keep the RPP on a success path for completing cleanup of Hanford tank waste. While all parties are aggressively moving forward to provide vitrification facilities with enhanced capabilities, work continues toward a credible plan for completing waste treatment and accelerating risk reduction. In all of these efforts two principles are paramount; (1) all actions are focused on protecting worker health and the environment and complying with laws and regulations, and (2) open discussion, involvement, and cooperation of regulators and stakeholders is fundamental to any decision making.

Book Removal of Floating Organic in Hanford Waste Tank 241 C 103 Restart Plan

Download or read book Removal of Floating Organic in Hanford Waste Tank 241 C 103 Restart Plan written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 534 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book INIS Atomindex

Download or read book INIS Atomindex written by and published by . This book was released on 1995 with total page 682 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Miscellaneous Component Design for Tank 241SY101 Pump Removal

Download or read book Miscellaneous Component Design for Tank 241SY101 Pump Removal written by and published by . This book was released on 1995 with total page 215 pages. Available in PDF, EPUB and Kindle. Book excerpt: A mixer pump has been used to mitigate the hydrogen build-up in tank 241SY101 (SY101), located in the 200 West Area of the Hanford Site. New equipment is being prepared for the removal, transport, storage, and disposal of the test pump. The disposal equipment for the test pump now in tank SY101 includes a shipping container, a strong back, a lifting beam, a test weight, container support stands, a modified mock-up pump, a flexible receiver blast shield, a lifting yoke, and a yoke brace. The structural evaluations of container and strong back are detailed in another supporting document (WHC 1994a), the engineering analyses of flexible receiver blast shield/lifting yoke and yoke brace are given in other supporting documents (WHC 1994b, WHC 1994c), respectively. Engineering tasks that were contracted to Advanced Engineering Consultants (AEC) include the design and analysis of the following. Two spreader-beam lifting devices. a Container test weight. Container support saddles. Mock-up pump modification. This report documents the work description, design basis, assumptions, and design calculations provided by AEC for the above components. All AEC documents appear in Appendix A. Additional work conducted by Westinghouse Hanford Company (WHC) on the modified container test weight, modification to the mock-up pump, the removable support for the transport assembly, and saddle modification for air pallets also are included in this document.

Book Hanford Site Tank Waste Remediation Systems  TWRS   Management and Disposal of Radioactive  Hazardous  and Mixed Wastes  City of Richland  Grant County

Download or read book Hanford Site Tank Waste Remediation Systems TWRS Management and Disposal of Radioactive Hazardous and Mixed Wastes City of Richland Grant County written by and published by . This book was released on 1996 with total page 298 pages. Available in PDF, EPUB and Kindle. Book excerpt: