EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Dredged Material Management Plan and Environmental Impact Statement  Mcnary Reservoir and Lower Snake River Reservoirs  Appendix B

Download or read book Dredged Material Management Plan and Environmental Impact Statement Mcnary Reservoir and Lower Snake River Reservoirs Appendix B written by and published by . This book was released on 2002-07-01 with total page 273 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River , and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance - capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3- Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book

    Book Details:
  • Author : יצחק לבנון
  • Publisher :
  • Release : 197?
  • ISBN :
  • Pages : 17 pages

Download or read book written by יצחק לבנון and published by . This book was released on 197? with total page 17 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Dredged Material Management Plan and Environmental Impact Statement  Mcnary Reservoir and Lower Snake River Reservoirs  Appendix C

Download or read book Dredged Material Management Plan and Environmental Impact Statement Mcnary Reservoir and Lower Snake River Reservoirs Appendix C written by and published by . This book was released on 2002-07-01 with total page 160 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Enviornmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for managment of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: ALternative 1 = No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs written by and published by . This book was released on 2002 with total page 353 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Final DMMP/EIS presents the Corps of Engineers' programmatic plan-for maintenance of the authorized navigation channel in the lower Snake River reservoirs between Lewiston, Idaho, and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal, Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot 0.9-METER (M) Levee Raise, Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot (0.9-m) Levee Raise, and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot (0.9-m) Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement

Download or read book Dredged Material Management Plan and Environmental Impact Statement written by and published by . This book was released on 2002-07-01 with total page 177 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the Lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074) The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3- Foot levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix H  Water and Sediment Quality

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix H Water and Sediment Quality written by and published by . This book was released on 2002 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the Lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074) The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book

    Book Details:
  • Author :
  • Publisher :
  • Release :
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix O  Responses to Comments on Draft DMMP EIS

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix O Responses to Comments on Draft DMMP EIS written by and published by . This book was released on 2002 with total page 143 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the darn and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use 0 Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix A  Hydrologic Analysis

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix A Hydrologic Analysis written by and published by . This book was released on 2002 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Final Dredged Material Management Plan/Environmental Impact Statement (DMMP(EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-water Disposal; Alternative 2 - Maintenance Dredging With In-water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix D  Upland Disposal Conceptual Design

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix D Upland Disposal Conceptual Design written by and published by . This book was released on 2002 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the Lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074) The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix K  Aquatic Resources

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix K Aquatic Resources written by and published by . This book was released on 2002 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4- Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement

Download or read book Dredged Material Management Plan and Environmental Impact Statement written by and published by . This book was released on 2002-07-01 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the Lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074) The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3- Foot levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix N  Dredging Proposed for Winter 2002 2003

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix N Dredging Proposed for Winter 2002 2003 written by and published by . This book was released on 2002 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River; and McNary reservoir on the Columbia River for 20 years; for management of dredged material fram these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3--Foot levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement

Download or read book Dredged Material Management Plan and Environmental Impact Statement written by and published by . This book was released on 2002-07-01 with total page 353 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Final DMMP/EIS presents the Corps of Engineers' programmatic plan-for maintenance of the authorized navigation channel in the lower Snake River reservoirs between Lewiston, Idaho, and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In- Water Disposal, Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot 0.9-METER (M) Levee Raise, Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot (0.9-m) Levee Raise, and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot (0.9-m) Levee Raise (Recommended Plan/Preferred Alternative).

Book Dredged Material Management Plan and Environmental Impact Statement  McNary Reservoir and Lower Snake River Reservoirs  Appendix B  Final  July 2002

Download or read book Dredged Material Management Plan and Environmental Impact Statement McNary Reservoir and Lower Snake River Reservoirs Appendix B Final July 2002 written by Walla Walla District Corps of Engineers and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: