EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Advanced Flue Gas Desulfurization  AFGD  Demonstration Project  Technical Progress Report No  15  July 1  1993  September 30  1993

Download or read book Advanced Flue Gas Desulfurization AFGD Demonstration Project Technical Progress Report No 15 July 1 1993 September 30 1993 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO[sub 2] emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO[sub 2] from coal-fired power plant flue gas at the Northern Indiana Public Service Company's Bailly Generating Station.

Book Advanced Flue Gas Desulfurization  AFGD  Demonstration Project  Technical Progress Report No  13  January 1  1993  March 31  1993

Download or read book Advanced Flue Gas Desulfurization AFGD Demonstration Project Technical Progress Report No 13 January 1 1993 March 31 1993 written by and published by . This book was released on 1994 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt: The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO2 emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO2 from coal-fired power plant flue gas at the Northern Indiana Public Service Company's Bailly Generating Station.

Book Advanced Fuel Gas Desulfurization  AFGD  Demonstration Project  Technical Progress Report No  19  July 1  1994  September 30  1994

Download or read book Advanced Fuel Gas Desulfurization AFGD Demonstration Project Technical Progress Report No 19 July 1 1994 September 30 1994 written by and published by . This book was released on 1995 with total page 400 pages. Available in PDF, EPUB and Kindle. Book excerpt: The {open_quotes}Advanced Flue Gas Desulfurization (AFGD) Demonstration Project{close_quotes} is a $150.5 million cooperative effort between the U.S. Department of Energy and Pure Air, a general partnership of Air Products and Chemicals, Inc. and Mitsubishi Heavy Industries America, Inc. The AFGD process is one of several alternatives to conventional flue gas desulfurization (FGD) being demonstrated under the Department of Energys̀ Clean Coal Technology Demonstration Program. The AFGD demonstration project is located at the Northern Indiana Public Service Companys̀ Bailly Generating Station, about 12 miles northeast of Gary, Indiana.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 624 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1996 with total page 402 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Advanced Flue Gas Desulfurization  AFGD  Demonstration Project  Volume 2  Project Performance and Economics  Final Technical Report

Download or read book Advanced Flue Gas Desulfurization AFGD Demonstration Project Volume 2 Project Performance and Economics Final Technical Report written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The project objective is to demonstrate removal of 90--95% or more of the SO[sub 2] at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO[sub 2] absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO[sub 2] absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO[sub 2] while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip[reg-sign] gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

Book Advanced Flue Gas Desulfurization  AFGD  Demonstration Project

Download or read book Advanced Flue Gas Desulfurization AFGD Demonstration Project written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Advanced Flue Gas Desulfurization  AFGD  Demonstration Project  A DOE Assessment

Download or read book Advanced Flue Gas Desulfurization AFGD Demonstration Project A DOE Assessment written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO2 emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO2 removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge.

Book Bench scale Demonstration of Hot gas Desulfurization Technology  Quarterly Technical Progress Report  July 1  1993  September 30  1993

Download or read book Bench scale Demonstration of Hot gas Desulfurization Technology Quarterly Technical Progress Report July 1 1993 September 30 1993 written by and published by . This book was released on 1993 with total page 16 pages. Available in PDF, EPUB and Kindle. Book excerpt: The US Department of Energy (DOE), Morgantown Energy Technology Center (METC), is sponsoring research in advanced methods for controlling contaminants in hot coal gasifier gas (coal gas) streams of integrated gasification combined-cycle (IGCC) power systems. The programs focus on hot-gas particulate removal and desulfurization technologies that match or nearly match the temperatures and pressures of the gasifier, cleanup system, and power generator. The purpose is to eliminate the need for expensive heat recovery equipment, reduce efficiency losses due to quenching, and minimize wastewater treatment costs. Hot-gas desulfurization research has focused on regenerable mixed-metal oxide sorbents which can reduce the sulfur in coal gas to less than 20 ppmv and can be regenerated in a cyclic manner with air for multicycle operation. Zinc titanate (Zn2TiO4 or ZnTiO3), formed by a solid-state reaction of zinc oxide (ZnO) and titanium dioxide (TiO2), is currently the leading sorbent. The sulfidation/regeneration cycle can be carried out in fixed-bed, moving-bed, or fluidized-bed reactor configuration, and all three types of reactors are slated for demonstration in the DOE Clean Coal Technology program. The fluidized-bed reactor configuration is most attractive because of several potential advantages including faster kinetics and the ability to handle the highly exothermic regeneration to produce a regeneration offgas containing a constant concentration of SO2.

Book LIFAC Sorbent Injection Desulfurization Demonstration Project  Quarterly Report No  12  July  September 1993

Download or read book LIFAC Sorbent Injection Desulfurization Demonstration Project Quarterly Report No 12 July September 1993 written by and published by . This book was released on 1993 with total page 16 pages. Available in PDF, EPUB and Kindle. Book excerpt: In December 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO2) in the flue gas. The host site for this $22 million, three-phase project is Richmond Power and Light's Whitewater Valley Unit No. 2 in Richmond, Indiana. The three project phases are: (1) Design; (2A) Long Lead Procurement; (2B) Construction; and (3) Operations. The design phase began on August 8, 1990 and was scheduled to last six months. Phase 2A, long lead procurement, overlaps the design phase and was expected to require about four months to complete. The construction phase was then to continue for another seven months, while the operations phase was scheduled to last about twenty-six months. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the twelfth Technical Progress Report covering the period July 1, 1993 through the end of September 1993. Due to the power plant's planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 2000
  • ISBN :
  • Pages : 95 pages

Download or read book written by and published by . This book was released on 2000 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Itogi Vserossijskoj gorodskoj perepisi 1923 goda na Dal nem Vostoke

Download or read book Itogi Vserossijskoj gorodskoj perepisi 1923 goda na Dal nem Vostoke written by and published by . This book was released on 1923 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Management of Dry Flue Gas Desulfurization By products in Underground Mines  Quarterly Report  January  March 1995

Download or read book Management of Dry Flue Gas Desulfurization By products in Underground Mines Quarterly Report January March 1995 written by and published by . This book was released on 1995 with total page 38 pages. Available in PDF, EPUB and Kindle. Book excerpt: On September 30, 1993, the U.S. Department of Energy, Morgantown Energy Technology Center and Southern Illinois University at Carbondale (SIUC) entered into a cooperative research agreement entitled {open_quotes}Management of Dry Flue Gas Desulfurization By-Products in Underground Mines{close_quotes} (DE-FC21-93MC 30252). Under the agreement Southern Illinois University at Carbondale will develop and demonstrate several technologies for the placement of coal combustion residues in abandoned coal mines, and will assess the environmental impact of such underground residues placement. Previous quarterly Technical Progress Reports have set forth the specific objectives of the program, as well as the management plan and the test plan for the overall program, and a discussion of these will not be repeated here. Rather, this report, will set forth the technical progress made during the period January 1 through March 31, 1995. The demonstration of the SEEC, Inc. technology for the transporting of coal combustion residues was completed with the unloading and final disposition of the three Collapsible Intermodal Containers (CIC). The loading and transport by rail of the three CIC's was quire successful; however some difficulties were encountered in the unloading of the containers. A full topical report on the entire SEEC demonstration is being prepared. As a result of the demonstration some modifications of the SEEC concept may be undertaken. Also during the quarter the location of the injection wells at the Peabody No. 10 mine demonstration site were selected. Peabody Coal Company has developed the specifications for the wells and sought bids for the actual drilling. It is expected that the wells will be drilled early in May.

Book Management of Dry Flue Gas Desulfurization By products in Underground Mines  Quarterly Technical Progress Report  April 1995  June 1995

Download or read book Management of Dry Flue Gas Desulfurization By products in Underground Mines Quarterly Technical Progress Report April 1995 June 1995 written by and published by . This book was released on 1995 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt: On September 30, 1993, the U.S. Department of Energy-Morgantown Energy Technology Center and Southern Illinois University at Carbondale (SIUC) entered into a cooperative research agreement entitled {open_quotes}Management of Dry Flue Gas Desulfurization By-Products in Underground Mines{close_quotes} (DE-FC21-93MC30252). Under the agreement Southern Illinois University at Carbondale will develop and demonstrate several technologies for the placement of coal combustion residues in abandoned coal mines, and will assess the environmental impact of such underground residues placement. Previous quarterly Technical Progress Reports have set forth the specific objectives of the program, and a discussion of these is not repeated here. Rather, this report discusses the technical progress made during the period April 1 - June 30, 1995. A final topical report on the SEEC, Inc. demonstration of its technology for the transporting of coal combustion residues was completed during the quarter, although final printing of the report was accomplished early in July, 1995. The SEEC technology involves the use of Collapsible Intermodal Containers (CIC's) developed by SEEC, and the transportation of such containers - filled with fly ash or other coal combustion residues - on rail coal cars or other transportation means. Copies of the final topical report, entitled {open_quotes}The Development and Testing of Collapsible Intermodal Containers for the Handling and Transport of Coal Combustion Residues{close_quotes} were furnished to the Morgantown Energy Technology Center. The Rapid Aging Test colums were placed in operation during the quarter. This test is to determine the long-term reaction of both the pneumatic and hydraulic mixtures to brine as a leaching material, and simulates the conditions that will be encountered in the actual underground placement of the coal combustion residues mixtures. The tests will continue for about one year.

Book Confined Zone Dispersion Flue Gas Desulfurization Demonstration  Quarterly Report No  10  February 17  May 31  1993

Download or read book Confined Zone Dispersion Flue Gas Desulfurization Demonstration Quarterly Report No 10 February 17 May 31 1993 written by and published by . This book was released on 1993 with total page 239 pages. Available in PDF, EPUB and Kindle. Book excerpt: The CZD process involves injecting a finely atomized slurry of reactive lime into the flue gas duct work of a coal-fired utility boiler. The principle of the confined zone is to form a wet zone of slurry droplets in the middle of the duct walls. The lime slurry reacts with part of the SO2 in the gas, and the reaction products dry to form solid particles. A solids collector, typically an electrostatic precipitator (ESP) downstream from the point of injection, captures the reaction products along with the fly ash entrained in the flue gas. The demonstration is being conducted at Penelecs̀ Seward Station, Unit No. 15. This boiler is a 147 MWe coal-fired unit, which utilizes Pennsylvania bituminous coal (approximately 1.2 to 2.5% sulfur). One of the two flue gas ducts leading from the boiler has been retrofitted with the CZD technology. The first existing ESP installed in the station is immediately behind the air preheater. The second ESP, installed about 15 years ago, is about 80 feet away from the first ESP. The goal of this demonstration is to prove the technical and economic feasibility of the CZD technology on a commercial scale. The process is expected to achieve 50% SO2

Book Bench scale Demonstration of Hot gas Desulfurization Technology  Quarterly Technical Progress Report  October 1  December 31  1993

Download or read book Bench scale Demonstration of Hot gas Desulfurization Technology Quarterly Technical Progress Report October 1 December 31 1993 written by and published by . This book was released on 1994 with total page 13 pages. Available in PDF, EPUB and Kindle. Book excerpt: Research Triangle Institute (RTI) with DOE/METC sponsorship has been developing zinc titanate sorbent technology since 1986. In addition, RTI has been developing the Direct Sulfur Recovery Process (DSRP) with DOE/METC sponsorship since 1988. Fluidized-bed zinc titanate desulfurization coupled to the DSRP is currently the most advanced and attractive technology for sulfur removal/recovery for IGCC systems, and it has recently been proposed in a Clean Coal Technology project. The goal of this project is to continue further development of the zinc titanate desulfurization and DSRP technologies by: scaling up the zinc titanate reactor system; developing an integrated skid-mounted zinc titanate desulfurization-DSRP reactor system; testing the integrated system over an extended period with real coal-gas from an operating gasifier to quantify the degradative effect, if any, of the trace contaminants present in coal gas; developing an engineering database suitable for system scaleup; and designing, fabricating and commissioning a larger DSRP reactor system capable of operating on a six-fold greater volume of gas than the DSRP reactor used in the bench-scale field test. During this reporting period the Construction Permit Application was completed and approved by the Process Safety Committee, and a final revised Application has been submitted to DOE/METC. A draft Test Plan for the field test was formulated. Finally, progress was made in the reactor system fabrication with the submission of purchase orders for nearly all major equipment, and with the final design of the trailer (mobile laboratory).

Book Confined Zone Dispersion Flue Gas Desulfurization Demonstration  Quarterly Report No  8  August 17  1992  November 16  1992

Download or read book Confined Zone Dispersion Flue Gas Desulfurization Demonstration Quarterly Report No 8 August 17 1992 November 16 1992 written by and published by . This book was released on 1993 with total page 254 pages. Available in PDF, EPUB and Kindle. Book excerpt: The CZD process involves injecting a finely atomized slurry of reactive lime into the flue gas duct work of a coal-fired utility boiler. The principle of the confined zone is to form a wet zone of slurry droplets in the middle of the duct confined in an envelope of hot gas between the wet zone and the duct walls. The lime slurry reacts with part of the SO2 in the gas, and the reaction products dry to form solid particles. A solids collector, typically an electrostatic precipitator (ESP) downstream from the point of injection, captures the reaction products along with the fly ash entrained in the flue gas. The goal of this demonstration is to prove the technical and economic feasibility of the CZD technology on a commercial scale. The process is expected to achieve 50% SO2 removal at lower capital and O & M costs than other systems. To achieve its objectives, the project is divided into the following three phases: Phase 1: Design and Permitting, Phase 2: Construction and Start-up, Phase 3: Operation and Disposition. Phase 1 activities were completed on January 31, 1991. Phase 2 activities were essentially concluded on July 31, 1991, and Phase 3a, Parametric Testing, was initiated on July 1, 1991. This Quarterly Technical Progress Report covers Phase 3b activities from August 17, 1992 through November 16, 1992.