EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book 200 CW 1 Operable Unit Remedial Investigation Report

Download or read book 200 CW 1 Operable Unit Remedial Investigation Report written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase 1 Remedial Investigation Report for 200 BP 1 Operable Unit

Download or read book Phase 1 Remedial Investigation Report for 200 BP 1 Operable Unit written by and published by . This book was released on 1993 with total page 511 pages. Available in PDF, EPUB and Kindle. Book excerpt: The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

Book Remedial Investigation Report for the 200 ZP 1 Groundwater Operable Unit

Download or read book Remedial Investigation Report for the 200 ZP 1 Groundwater Operable Unit written by Mark E. Byrnes and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase I Remedial Investigation Report for the 200 BP 1 Operable Unit

Download or read book Phase I Remedial Investigation Report for the 200 BP 1 Operable Unit written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Data Quality Objectives Summary Report for the 200 PW 1 Operable Unit Phase I Representative Waste Sites

Download or read book Remedial Investigation Data Quality Objectives Summary Report for the 200 PW 1 Operable Unit Phase I Representative Waste Sites written by Roy G. Bauer and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book REMEDIAL INVESTIGATION REPORT FOR THE 200 CW 5 U POND   Z DITCHES   200 CW 2 S POND   200 SCW R T POND   200 SC 1 STEAM CONDENSATE GROUP OU

Download or read book REMEDIAL INVESTIGATION REPORT FOR THE 200 CW 5 U POND Z DITCHES 200 CW 2 S POND 200 SCW R T POND 200 SC 1 STEAM CONDENSATE GROUP OU written by and published by . This book was released on 2004 with total page 490 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this remedial investigation (RI) report is to evaluate the data generated during the RI and other characterization activities at the 200-CW-5 Operable Unit (OU) to (1) determine if sufficient data have been collected to support risk assessment and remedial decision making, (2) estimate risk at the representative sites based on data collected during the RI and on other existing data, (3) determine the need to proceed with a feasibility study (FS), and (4) determine which constituents and site-specific considerations need to be addressed in the FS. This RI report also provides data to support the evaluation of alternatives in the FS with regard to meeting potential applicable or relevant and appropriate requirements, risk reduction, and potentially significant data gaps (if any). This RI report includes an evaluation of the baseline risk using characterization data generated during the RI and significant data from other investigations (e.g., historical data from the 216-U-10 Pond and the 216-Z-1D, 216-Z-11, 216-U-14, and 216-Z-19 Ditches). Data generated during the RI will support the closeout of waste sites in the 200-CW-5 OU, as well as the waste sites in the 200-CW-2,200-CW-4, and 200-SC-1 consolidated OUs.

Book Phase I Remedial Investigation Report for the 300 FF 5 Operable Unit  Volume 1

Download or read book Phase I Remedial Investigation Report for the 300 FF 5 Operable Unit Volume 1 written by and published by . This book was released on 1994 with total page 509 pages. Available in PDF, EPUB and Kindle. Book excerpt: The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

Book Draft Remedial Investigation feasibility Study Work Plan for the 200 BP 1 Operable Unit  Hanford Site  Richland  Washington

Download or read book Draft Remedial Investigation feasibility Study Work Plan for the 200 BP 1 Operable Unit Hanford Site Richland Washington written by United States. Department of Energy and published by . This book was released on 1989 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Report for the 200 MW 1 Miscellaneous Waste Group Operable Unit

Download or read book Remedial Investigation Report for the 200 MW 1 Miscellaneous Waste Group Operable Unit written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Physiologie  qualit   et transport des bananes

Download or read book Physiologie qualit et transport des bananes written by and published by . This book was released on 1962 with total page 119 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Data Quality Objectives Summary Report for the 200 LW 1  300 Area Chemical Laboratory Waste Group Operable Unit

Download or read book Remedial Investigation Data Quality Objectives Summary Report for the 200 LW 1 300 Area Chemical Laboratory Waste Group Operable Unit written by Mary E. Todd and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase 1  Remedial Investigation Report for the 300 FF 5 Operable Unit

Download or read book Phase 1 Remedial Investigation Report for the 300 FF 5 Operable Unit written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Data Quality Objective Summary Report for the 200 PW 1 Operable Unit Dispersed Carbon Tetrachloride Vadose Zone Plume

Download or read book Remedial Investigation Data Quality Objective Summary Report for the 200 PW 1 Operable Unit Dispersed Carbon Tetrachloride Vadose Zone Plume written by Roy G. Bauer and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase 1 Remedial Investigation Report for 200 BP 1 Operable Unit

Download or read book Phase 1 Remedial Investigation Report for 200 BP 1 Operable Unit written by and published by . This book was released on 1993 with total page 1128 pages. Available in PDF, EPUB and Kindle. Book excerpt: Volume two contains appendices for the following: crib soil sample reference table; crib soil analytical data; and crib soil quality control data.