EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book RCRA  Resource Conservation and Recovery Act  Ground water Monitoring Projects for Hanford Facilities

Download or read book RCRA Resource Conservation and Recovery Act Ground water Monitoring Projects for Hanford Facilities written by and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the progress during 1989 of 16 Hanford Site ground-water monitoring projects covering 25 hazardous waste facilities and 1 nonhazardous waste facility. Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act of 1976 and the State of Washington Administrative Code. 40 refs., 75 figs., 6 tabs.

Book RCRA  Resource Conservation and Recovery Act  Ground water Monitoring Projects for Hanford Facilities

Download or read book RCRA Resource Conservation and Recovery Act Ground water Monitoring Projects for Hanford Facilities written by and published by . This book was released on 1989 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs.

Book RCRA  Resource Conservation and Recovery Act of 1976  Ground water Monitoring Projects for Hanford Facilities

Download or read book RCRA Resource Conservation and Recovery Act of 1976 Ground water Monitoring Projects for Hanford Facilities written by and published by . This book was released on 1989 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the progress of 13 Hanford ground-water monitoring projects for the period October 1 to December 31, 1988. There are 16 individual hazardous waste facilities covered by the 13 ground-water monitoring projects. The Grout Treatment Facility is included in this series of quarterly reports for the first time. The 13 projects discussed in this report were designed according to applicable interim-status ground-water monitoring requirements specified in the Resource Conservation and Recovery Act of 1976 (RCRA). During this quarter, field activities primarily consisted of sampling and analyses, and water-level monitoring. The 200 Areas Low-Level Burial Grounds section includes sediment analyses in addition to ground-water monitoring results. Twelve new wells were installed during the previous quarter: two at the 216-A-29 Ditch, six at the 216-A-10 Crib, and four at the 216-B-3 Pond. Preliminary characterization data for these new wells include drillers' logs and other drilling and site characterization data, and are provided in Volume 2 or on microfiche in the back of Volume 1. 26 refs., 28 figs., 74 tabs.

Book Annual Report for RCRA Groundwater Monitoring Projects at Hanford Site Facilities for 1995

Download or read book Annual Report for RCRA Groundwater Monitoring Projects at Hanford Site Facilities for 1995 written by and published by . This book was released on 1996 with total page 580 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the US Department of Energys̀ Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1994 and September 1995. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

Book Annual Report for RCRA Groundwater Monitoring Projects at Hanford Site Facilities for 1993

Download or read book Annual Report for RCRA Groundwater Monitoring Projects at Hanford Site Facilities for 1993 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report presents the annual hydrogeologic evaluation of 20 Resource Conservation and Recovery Act of 1976 groundwater monitoring projects and 1 nonhazardous waste facility at the US Department of Energy's Hanford Site. Most of the projects no longer receive dangerous waste; a few projects continue to receive dangerous waste constituents for treatment, storage, or disposal. The 20 RCRA projects comprise 30 waste management units. Ten of the units are monitored under groundwater quality assessment status because of elevated levels of indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration, distribution, and rate of migration are evaluated. Groundwater is monitored at the other 20 units to detect contamination, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1992 and September 1993. Recent groundwater quality is also described for the 100, 200, 300, and 600 Areas and for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period October 1 Through December 31  1994

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period October 1 Through December 31 1994 written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and[open-quotes]Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities[close-quotes] (Title 40 Code of Federal Regulations[CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

Book Quarterly Report of RCRA  Resource Conservation and Recovery Act of 1976  Groundwater Monitoring Data for Period July 1  1990 Through September 30  1990

Download or read book Quarterly Report of RCRA Resource Conservation and Recovery Act of 1976 Groundwater Monitoring Data for Period July 1 1990 Through September 30 1990 written by and published by . This book was released on 1990 with total page 148 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and 40CFR265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1988b). This submittal provides data obtained from groundwater monitoring activities for July 1, 1990 through September 30, 1990. 26 refs., 21 figs., 30 tabs.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period October 1  1993  December 31  1993

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period October 1 1993 December 31 1993 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between November 20 and February 25, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period January 1  1993 Through March 31  1993

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period January 1 1993 Through March 31 1993 written by and published by . This book was released on 1993 with total page 425 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

Book RCRA Groundwater Monitoring Data  Quarterly Report  April 1  1995  June 30  1995

Download or read book RCRA Groundwater Monitoring Data Quarterly Report April 1 1995 June 30 1995 written by and published by . This book was released on 1995 with total page 300 pages. Available in PDF, EPUB and Kindle. Book excerpt: Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between April and June 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter, but also data from earlier sampling events that were not previously reported.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period January 1  March 31  1995

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period January 1 March 31 1995 written by and published by . This book was released on 1995 with total page 407 pages. Available in PDF, EPUB and Kindle. Book excerpt: This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

Book Resource Conservation and Recovery Act Ground water Monitoring Projects for Hanford Facilities

Download or read book Resource Conservation and Recovery Act Ground water Monitoring Projects for Hanford Facilities written by and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This is Volume 1 of a two-volume document that describes the progress of 15 Hanford Site ground-water monitoring projects for the period October 1 to December 31, 1989. This volume discusses the projects. The work described in this document is conducted by the Pacific Northwest Laboratory under the management of Westinghouse Hanford Company for the US Department of Energy. Concentrations of ground-water constituents are compared to federal drinking water standards throughout this document for reference purposes. All drinking water supplied from the samples aquifer meets regulatory standards for drinking water quality. 51 refs., 35 figs., 86 tabs.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period April 1  1991 Through June 30  1991

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period April 1 1991 Through June 30 1991 written by and published by . This book was released on 1991 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or ground water quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and 40 CFR 265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1989). Compliance with the 40 CFR 265 regulations are required by the Washington Administrative Code 173--303 (Ecology 1991). This submittal provides data obtained from groundwater monitoring activities for April 1, 1991 through June 30, 1991. 12 refs., 1 fig., 12 tabs.

Book Resource Conservation and Recovery Act Ground water Monitoring Projects for Hanford Facilities

Download or read book Resource Conservation and Recovery Act Ground water Monitoring Projects for Hanford Facilities written by and published by . This book was released on 1989 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This is Volume 1 of a two-volume document that describes the progress of 14 Hanford Site ground-water monitoring projects for the period July 1 to September 30, 1989. This volume discusses the projects; Volume 2 provides as-built diagrams, completion/inspection reports, drilling logs, and geophysical logs for wells drilled, completed, or logged during this period. Volume 2 can be found on microfiche in the back pocket of Volume 1. The work described in this document is conducted by the Pacific Northwest Laboratory under the management of Westinghouse Hanford Company for the US Department of Energy. Concentrations of ground-water constituents are compared to federal drinking water standards throughout this document for reference purposes. All drinking water supplied from the sampled aquifer meets regulatory standards for drinking water quality.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period July 1  1993  September 30  1993

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period July 1 1993 September 30 1993 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ''Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, '' as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173--303. This quarterly report contains data received between August 21 and November 19, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the July through September quarter but also data from earlier sampling events that were not previously reported.

Book Quarterly Report of RCRA Groundwater Monitoring Data for Period July 1  1991 Through September 30  1991

Download or read book Quarterly Report of RCRA Groundwater Monitoring Data for Period July 1 1991 Through September 30 1991 written by and published by . This book was released on 1991 with total page 255 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and 40 CFR 265, Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (EPA 1989). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303 (Ecology 1991). This submittal provides data obtained from groundwater monitoring activities for July 1, 1991 through September 30, 1991. This report contains groundwater monitoring data from Hanford Site groundwater projects. A RCRA network is currently being established at the 100-D Pond. Groundwater chemistry analyses have not yet been performed.