EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale  Phase II  Quarterly Progress Report  September 1  1980 November 30  1980

Download or read book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale Phase II Quarterly Progress Report September 1 1980 November 30 1980 written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The major activities at OOSI's Logan Wash site during the quarter were: mining the voids at all levels for Retorts 7 and 8; blasthole drilling; tracer testing MR4; conducting the start-up and burner tests on MR3; continuing the surface facility construction; and conducting Retorts 7 and 8 related Rock Fragmentation tests. Environmental monitoring continued during the quarter, and the data and analyses are discussed. Sandia National Laboratory and Laramie Energy Technology Center (LETC) personnel were active in the DOE support of the MR3 burner and start-up tests. In the last section of this report the final oil inventory for Retort 6 production is detailed. The total oil produced by Retort 6 was 55,696 barrels.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1982 with total page 1696 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale  Phase II  Quarterly Progress Report  September 1 November 30  1979

Download or read book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale Phase II Quarterly Progress Report September 1 November 30 1979 written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The major activities at OOSI's Logan Wash site during the quarter were: driving the access drifts towards the underground locations for Retorts 7 and 8; manway raise boring; constructing the change house; rubbling the first lift of Mini-Retort (MR)1; preparing the Mini-Retorts for tracer testing; coring of Retort 3E; and beginning the DOE instrumentation program.

Book Fossil Energy Update

Download or read book Fossil Energy Update written by and published by . This book was released on 1981 with total page 886 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale  Phase II

Download or read book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale Phase II written by and published by . This book was released on 1980 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The progress presented in this report covers the period June 1, 1980 through August 31, 1980 under the work scope for. Phase II of the DOE/Occidental Oil Shale, Inc. (OOSI) Cooperative Agreement. The major activities at OOSI 1s Logan Wash site during the quarter were: mining the voids at all levels for Retorts 7, 8 and 8x; completing Mini-Retort (MR) construction; continuing surface facility construction; tracer testing the MR 1 s; conducting Retorts 7 & 8 related Rock Fragmentation tests; setting up and debugging the Sandia B-61 trailer; and preparing the Phase II instrumentation plan.

Book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale  Phase II  Quarterly Progress Report  June 1  1979 August 31  1979

Download or read book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale Phase II Quarterly Progress Report June 1 1979 August 31 1979 written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Objectives are to: construct, tracer/flow test, and simultaneously process two side-by-side large scale retorts (Retorts 7 and 8) formed by blasting to a horizontal free face; conduct small-scale start up tests, prior to ignition of Retorts 7 and 8, on at least two quarter size retorts (miniretorts); develop mine stability data for commercial size retorts; develop and test advanced retort ignition systems; collect evaluate and report environmental data; and test special mining and remote sensing equipment. This quarterly report covers the activities for the first three months of the Phase II Program. The major activities at Logan Wash and on Phase II during the months of June, July, and August were: driving the access and ventilation drifts towards the underground locations for Retorts 7 and 8; beginning construction for surface facilities; mining the rooms for the mini retorts; and developing an instrumentation program for DOE funding.

Book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale   Phase 1      b Volume 1  Summary Report November 1  1976  October 31  1977

Download or read book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale Phase 1 b Volume 1 Summary Report November 1 1976 October 31 1977 written by Robert Alden Loucks and published by . This book was released on 1977 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale

Download or read book Occidental Vertical Modified in Situ Process for the Recovery of Oil from Oil Shale written by Reid M. Nelson and published by . This book was released on 1982 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Phase II of the Cooperative Agreement between the Department of Energy (DOE) and Occidental Oil Shale, Inc. (OOSI) has the primary objective of simultaneously processing two commercial-size modified in situ (MIS) retorts. Most of the data obtained from this program will appear in the Summary Report to be issued six months after the completion of Phase II. This Final Report summarizes the progress of the project through August 19, 1981, the effective data of the DOE discontinuance of funding. As agreed under Modification 014 to the Agreement, there will be no reports between this Final Report and the Summary Report. Through the Discontinuance, the work covered in Phase II include: mining for, and formation of, Retorts 7, 8, and Room 8X (R7, 8, and 8X); construction of processing facilities; installation of mine stability and processing instrumentation; collection and analysis of a R7 and 8 core; execution of a mini-retort blast and ignition test program; and continuous environmental support.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1981 with total page 1374 pages. Available in PDF, EPUB and Kindle. Book excerpt: