EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Whitney Pond  MA 00633   Connecticut River Basin  Winchendon  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Whitney Pond MA 00633 Connecticut River Basin Winchendon Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of an 82 foot long stone masonry spillway, a 450 foot earth embankment to the left of the spillway, and a 30 foot earth embankment to the right of the spillway. The spillway can pass 7 percent of this flow. The dam would be overtopped by 6 feet. The dam is in generally good condition. It is felt, however, that certain normal maintenance and operational procedures need attention. These include removal of brush and trees on the upstream and downstream slopes; development of a formal warning system and monitoring of the condition of the downstream training wall. Also repairs to the walkway over the spillway are required.

Book National Program for Inspection of Non Federal Dams  Whites Mill Pond Dam  MA 00630   Connecticut River Basin  Winchendon  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Whites Mill Pond Dam MA 00630 Connecticut River Basin Winchendon Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: White's Mill Pond dam which was built before 1923 is a 340-foot long earthfill dam with upstream and downstream dry stone masonry walls. The dam has a maximum height of 13 feet and consists of a spillway, low level outlet, an intake toi a plant, and an earth dike. The following deficiencies were observed at the site: severe seepage at several locations along the toe of the dam; downstream stone masonry walls are out of plumb; lack of access to the low level outlet operator; erosion at the low point of the dam crest; bulging of the downstream masonry wall in several locations; stone missing from the upstream face of the spillway, mortar missing from the stone masonry spillway of the dam; heavy growth of brush and trees on the dam crest and on the dike; and an accumulation of debris in the discharge channel. Hydraulic analyses indicate that the spillway (without stoplogs) can discharge 520 cfs, or 76 percent of the test flood outflow before the dam is overtopped. (With the stoplogs, the spillway can discharge 170 cfs or 22 percent of the test flood outflow before the dam is overtopped).

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1985 with total page 1224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Hunts Pond Dam  MA 00634   Connecticut River Basin  Winchendon  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Hunts Pond Dam MA 00634 Connecticut River Basin Winchendon Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 108 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 184 ft. long concrete dam with a maximum height of 16 ft. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally the dam is considered to be in fair to good condition. It is small in size and has a significant hazard potential. (Author).

Book National Program for Inspection of Non Federal Dams  Congamond Lakes North Dike  MA 00072   Connecticut River Basin  Southwick  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Congamond Lakes North Dike MA 00072 Connecticut River Basin Southwick Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: Congamond Lakes North Dike impounds North Pond which is one of the three ponds which make up the Congamond Lakes. All of the three ponds, North Pond, South Pond and Middle Pond are interconnected by culverts or bridges. Together the three ponds are approximately three miles long and up to one-third mile wide with a total surface area of about 465 acres. The North Dike was constructed to replace an earlier dike (which plugged an old canal) and which failed in 1955. The North Dike is approximately 80 feet long with a maximum height of 29 feet. The present condition of the dike is fair. There is no spillway nor regulating gates at North Dike. The present outlet for the lakes is at Middle Pond where Berkshire Avenue crosses Great Brook about 2 miles to the south of North Dike. During annual floods, the direction of flow in Great Brook reverses itself and flows back towards Congamond Lakes. The outlet structure at Berkshire Avenue has stoplogs which are inserted to prevent Great Brook from flooding back into the lakes. While the stoplogs are in place, Congamond Lakes has no outlet. After the flood stage of Great Brook recedes, the stoplogs are removed and Congamond Lakes are allowed to drain. The PMF inflow into Congamond Lakes, assuming that the stoplogs are in place at Berkshire Avenue would cause the lake level to rise to approximate elevation 232 MSL which is about 2 feet below the top of the dike.

Book Government reports annual index

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1228 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Ashfield Pond Dam  MA 00523   Connecticut River Basin  Ashfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Ashfield Pond Dam MA 00523 Connecticut River Basin Ashfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: Ashfield Pond Dam is an earth embankment about 775 feet long with a maximum height of about 15 feet. A 30 foot long, 14.5 foot high stone masonry and concrete stepped spillway is located about 110 feet from the east abutment. A rectangular concrete low level outlet, 4 feet wide and 1.7 feet high is located at the east end of the spillway. Phase I inspection and evaluation of Ashfield Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on enginnering judgment and the performance of the earth embankment and the outlet works, the project is considered to be in fair condition. The project has a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. Selection of 1/2 PMF as the test flood, yields an outflow of 1698 cfs (assuming the low level outlet is closed), which is greater than the maximum spillway discharge capacity of 965 cfs and would result in an overtopping of the dam by about 0.43 feet.

Book National Program for Inspection of Non Federal Dams  Whiting Street Pond Dam  MA 00070   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Whiting Street Pond Dam MA 00070 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Whiting Street Pond Dam is an earth-buttresed stone masonry dam, 1900 feet long with a maximum height of about 19 feet. A two level stone masonry and concrete spillway is located about 70 feet from the dam's south abutment. A gatehouse and gate chamber are located at approximately the center of the dam and contain the operating mechanisms for controlling the outflows into the City's Water Supply and to the low level outlet. Discharges from the low level outlet and the spillway converge and flow into an unnamed creek before emptying into the Connecticut River. Phase I inspection and evaluation of Whiting Street Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on engineering judgement and the performance of the dam and the outlet works, the project is considered to be in fair condition. The project, however, does have a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The test flood, in accordance with Corps of Engineers guidelines, is the Probable Maximum Flood (PMF). The PMF yields an outflow of 8253 cfs which is greater than the maximum discharge capacity of the spillway of 215 cfs and would result in overtopping of the dam by about 1.4 feet.

Book National Program for Inspection of Non Federal Dams  Black Rock Pond Dam  CT 00633   Naugatuck River Basin  Watertown  Connecticut  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Black Rock Pond Dam CT 00633 Naugatuck River Basin Watertown Connecticut Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Black Rock Pond Dam consists of an earth embankment with the outlet works located near the left end of the dam. An overflow spillway is located at a small dike approximately 800 feet to the left of the dam on a separate arm of the pond. The dam has a top width of 10 feet, a maximum height of 20 feet, a total length of 160 feet, an upstream slope of 3 horizontal to 1 vertical, and a downstream slope of 1.6 horizontal to 1 vertical. The outlet works consist of a 12-inch cast iron low level outlet or blowoff pipe controlled by an upstream gate. The overflow spillway consists of a concrete channel 5 feet wide by 5 feet high with slots for flashboards at the upstream end. The dam impounds Black Rock Pond, which is used for swimming and fishing. Based on the visual inspection, the dam is judged to be in poor condition. Features that could affect the future integrity of the dam are the downstream seepage, erosion of the crest and slopes, the presence of tree stumps on the slopes, and inadequate spillway capacity. The test flood inflow of 1,200 cfs results in a test flood routed outflow of 1,000 cfs that would overtop the dam and dike by 1.6 feet.

Book National Program for Inspection of Non Federal Dams  Congamond Lakes Outlet  Middle Pond   MA 00071   Connecticut River Basin  Southwick  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Congamond Lakes Outlet Middle Pond MA 00071 Connecticut River Basin Southwick Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam is comprised of two earth embankments with a central twin 8 foot wide concrete box culvert with concrete training walls. The inspection indicated the dam to be in generally good condition. The dam has a size classification of intermediate and a hazard classification of low. The test flood would be one-half the PMF.

Book National Program for Inspection of Non Federal Dams  Indian Orchard  MA 00722   Connecticut River Basin  Springfield Ludlow  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Indian Orchard MA 00722 Connecticut River Basin Springfield Ludlow Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is generally comprised of a 401-foot long, 10 to 28 foot high main spillway, a head gate building, an overflow canal spillway and a canal leading to two 8 foot diameter penstocks used in electrical power generation. There are two inoperable gates located in the main dam. The dam is normally operated with two feet of flashboards above the spillway crest. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The 1 /2 PMF test flood used will produce an inflow/outflow of 70,830 cfs. The dam is a run-of-the-river type and the spillway crest would be overtopped by about 14 feet. The spillway has a capacity of 29,500 cfs (42 percent of 1/2 PMF outlfow) at elevation 166.6, top of non-overflow section. The non-overflow section is overtopped by about six feet. This flow would not overtop the upstream training walls which are at elevation 174.0. The overall condition of the dam is considered fair due to the lack of adequate draw down capacity. Remedial measures consist of removing vegetation from the downstream face of the dam, further observation of seepage at the right abutment, repair the wooden crest cover, and develop a formal warning system to warn downstream areas in case of an emergency.

Book National Program for Inspection of Non Federal Dams  Powder Mill Pond Dam  MA 00092   Connecticut River Basin  South Barre  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Powder Mill Pond Dam MA 00092 Connecticut River Basin South Barre Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  McLean Reservoir  MA 00539   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams McLean Reservoir MA 00539 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.

Book National Program for Inspection of Non Federal Dams  North Silver Lake Dam  MA 00307   Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams North Silver Lake Dam MA 00307 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: North Silver Dam is about 1550 feet long with a maximum height of 76 feet. The dam has a chimney drain and a rock toe for internal drainage. The dam has been classified as intermediate in size with a high hazard potential. The dam is considered to be in fair condition. A major breach of the dam could cause appreciable damage to roads, bridges and residences in the downstream area.

Book National Program for Inspection of Non Federal Dams  Snow Pond Dam  MA 00079   Connecticut River Basin  Ware  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Snow Pond Dam MA 00079 Connecticut River Basin Ware Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Snow Pond dam is approximately 200 ft. long overall, and consists of a small earth embankment approximately 6 ft. high, an ungated concrete ogee spillway, a section of earth fill retained by concrete and stone masonry walls and a 6-ft. diameter outlet pipe. The dam is in fair condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway cannot pass either one-half the probable maximum flood or the 100-year flood and the spillway is considered inadequate. Recommendations for remedial work include earthwork to restore embankment grades, structural repair of the control gate to the outlet conduit and reconstruction of certain retaining walls. Work should be designed and constructed as soon as practical under the supervision of a registered professional engineer.

Book National Program for Inspection of Non Federal Dams  Upper Wilson Pond Dam  NH 00202   Connecticut River Basin  Swanzey  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Upper Wilson Pond Dam NH 00202 Connecticut River Basin Swanzey New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 109 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is constructed of reinforced concrete and earth fill. It is about 225 ft. long and 16.6 ft. high. The dam is small in size with a high hazard potential. The dam is in poor condition at the present time. The spillway is capable of passing 5% of the Test Flood routed peak outflow. (Author).

Book National Program for Inspection of Non Federal Dams  Lake Rohunta  MA 00012   Connecticut River Basin  Athol  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lake Rohunta MA 00012 Connecticut River Basin Athol Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a central 46 foot wide concrete spillway flanked by earthen embankments. The western embankment has a length of 250 feet and the eastern embankment has a length of about 280 feet. The dam has a size classification of intermediate and a hazard classification of low. The dam is in generally good condition. It is felt, however, that certain items which are generally normal maintenance and operational procedures need attention. The spillway will pass only 12% of the test flood outflow; the embankment will be overtopped by 3 feet.