EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Stevens Paper Company  Lower  Dam  MA 00074   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Stevens Paper Company Lower Dam MA 00074 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam generally consists of a 190 foot masonry spillway, an earthfill embankment and 2 outlet pipes. The dam was designed in 1955 by Stone and Webster Engineering Corporation to replace an earlier dam, which was damaged by the flood of that year. Construction which utilized portions of the original structure was completed in 1957. The visual inspection showed the dam to be in good condition. However, water passing over the spillway limited the inspection of the spillway. The spillway is capable of passing 96% of the test flood outflow. The top of the embankment, elevation 175, would be overtopped by about 1 foot. However, failure under this condition would only cause insignificant damage as the downstream flooding would have already occurred. The dam is generally in good condition. However, it is recommended that the owner repair the drawdown outlet, and operate it at least once yearly to insure continued adequacy. After this outlet is repaired, or during a period of low flow, the owner should engage a qualified engineer to inspect the spillway without water flowing over it. Also the erosion of a retaining wall downstream of the spillway on the right abutment side should be repaired.

Book National Program for Inspection of Non Federal Dams  West Parish Filter Number 3 Dam  MA 00610   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams West Parish Filter Number 3 Dam MA 00610 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: West Parish Filter No. 3 Dam is an earthen embankment structure 37.5 feet high and 800 feet long. A side-channel spillway is located at the right abutment. It has a concrete overflow section which is 23.4 feet long. Outlet piping passes beneath the embankment and connects directly to the water treatment plant which serves the City of Springfield, Mass. The dam is situated on a very small (0.07 sq. mi) drainage area, and serves as offstream storage and as a sedimentation basin for water which is piped from other dams. Based on the visual inspection, the dam is judged to be in fair condition. The following deficiencies were observed at the dam: a soft, wet area near the downstream toe; a row of evergreen trees along the downstream toe with some roots penetrating the embankment; rodent holes on the downstream slope; wheel tracks on the crest of the dam; misaligned riprap and loose rock and trees overhanging the spillway; low areas on the top of the dam; and no means of controlling flow at the upstream end of the outlet conduit. The spillway capacity is about 335 percent of the routed test flood outflow of 142 cfs. During the test flood, the freeboard would be 1.9 feet.

Book National Program for Inspection of Non Federal Dams  Westfield Reservoir Dam  MA 00734  Connecticut River Basin  Montgomery  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Westfield Reservoir Dam MA 00734 Connecticut River Basin Montgomery Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Westfield Reservoir Dam is an earthen embankment structure about 350 feet long and 40 feet high. It has an uncontrolled overflow spillway located on the left (east) abutment and a 24-inch diameter cast-iron pipe outlet conduit which passes beneath the dam and which is valve controlled at the outlet end. Based on the visual inspection, the dam is judged to be in air condition. The following deficiencies were observed at the dam: minor but widespread slumping on the downstream slope; an animal burrow on the downstream slope; large trees near both abutments; a soft, wet area along the right bank of the downstream channel; a small sinkhole on the right side of the spillway discharge channel; lack of vegetation on the crest of the dam; inoperable valves on the downstream end of the outlet conduit; and no valve or other means of regulating or shutting off flow at the intake end of the outlet conduit. With the stoplog in place, the spillway capacity of Westfield Reservoir Dam is 707 cfs, which is about 15 percent of the routed test flood outflow of 4670 cfs. With the stoplog removed, the spillway capacity is about 994 cfs, which is about 21 percent of the routed test flood outflow. The test flood would cause the dam to be overtopped by about 3.5 feet.

Book Government reports annual index

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1140 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1984-12 with total page 1194 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Ware Industries Main  Upper  Dam  MA 00594   Connecticut River Basin  Ware  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Ware Industries Main Upper Dam MA 00594 Connecticut River Basin Ware Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Ware Industries Man (Upper) Dam consists of a main spillway 115 ft. long and approximately 34 ft. high, a spillway extension 50 ft. long and 4 ft. high, a concrete emergency spillway, a gate house with control works to a canal, and a 115 ft. long overflow weir from the canal. Based on a visual examination of the structure, the project is in good to fair condition. There was no evidence of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 109,200 cfs would overtop the dam by 11.25 ft. With the water level at the top of dam, the spillway system can pass 7980 cfs which is 7.3 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Lower Glen  Greenfield  Reservoir Dam  MA 00048   Connecticut River Basin  Leyden  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lower Glen Greenfield Reservoir Dam MA 00048 Connecticut River Basin Leyden Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Glen (Greenfield) Reservoir Dam is a 46-foot high stone masonry dam, spanning the lower portion of a 300-foot deep V-shaped valley. The dam has a crest approximately 95 feet long, a vertical downstream face, a service spillway and an auxiliary spillway. The upstream face of the dam is submerged, and since no construction data are available, the configuration of the upstream side of the dam is unknown. The dam was constructed around 1904 to provide a water supply reservoir for the Town of Greenfield. The reservoir has not been used for water supply purposes for more than 30 years; therefore, the dam now serves no useful purpose. The dam appears to be in poor overall condition. Several joints have opened due to structural movement of the dam as evidenced by a bulge on the downstream face of the dam located just to the east of the center dam pier at mid-height. A great deal of seepage was observed at the location of the bulge and toward the east side groin area. The test flood peak inflow to Lower Glen (Greenfield) Reservoir was computed to be 3,760 cfs. The test flood peak overflow is also 3,760 cfs, with a discharge 4.8 feet over the top of the dam. The service and auxiliary spillways have a combined discharge capacity of 740 cfs, or 20 percent of the routed test flood outflow, just prior to overtopping of the dam.

Book National Program for Inspection of Non Federal Dams  Indian Orchard  MA 00722   Connecticut River Basin  Springfield Ludlow  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Indian Orchard MA 00722 Connecticut River Basin Springfield Ludlow Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is generally comprised of a 401-foot long, 10 to 28 foot high main spillway, a head gate building, an overflow canal spillway and a canal leading to two 8 foot diameter penstocks used in electrical power generation. There are two inoperable gates located in the main dam. The dam is normally operated with two feet of flashboards above the spillway crest. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The 1 /2 PMF test flood used will produce an inflow/outflow of 70,830 cfs. The dam is a run-of-the-river type and the spillway crest would be overtopped by about 14 feet. The spillway has a capacity of 29,500 cfs (42 percent of 1/2 PMF outlfow) at elevation 166.6, top of non-overflow section. The non-overflow section is overtopped by about six feet. This flow would not overtop the upstream training walls which are at elevation 174.0. The overall condition of the dam is considered fair due to the lack of adequate draw down capacity. Remedial measures consist of removing vegetation from the downstream face of the dam, further observation of seepage at the right abutment, repair the wooden crest cover, and develop a formal warning system to warn downstream areas in case of an emergency.

Book National Program for Inspection of Non Federal Dams  Lower Roberts Meadow Reservoir Dam  MA 00753   Connecticut River Basin  Northampton  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lower Roberts Meadow Reservoir Dam MA 00753 Connecticut River Basin Northampton Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 135 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Roberts Meadow Reservoir Dam is an earthfill embankment with a maximum height of 22.7 feet and a greatly curved crest, 550 feet long and 10 feet wide. A concrete and stone masonry spillway about 50 feet long, 14 feet high, and a freeboard of 9.3 feet is located near the northeast end of the embankment. Concrete and stone masonry training walls flank the spillay. A concrete low level intake structure with a manully controled slide gate is located about 180 feet west of the spillway. Phase I inspection and evaluation of the Lower Roberts Meadow Reservoir Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on engineering judgment and the performance of the earth embankment and the outlet works, the project is considered to be in good condition. The project has a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. It is estimated that 23% of the PMF over the combined drainage area could be processed by the combined Middle and Lower Reservoir storage and spillway capacities without overtooping the Lower Dam.

Book National Program for Inspection of Non Federal Dams  Northampton Reservoir  Upper Dam   MA 00521   Connecticut River Basin  Whately  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Northampton Reservoir Upper Dam MA 00521 Connecticut River Basin Whately Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam is a 940 foot long earth embankment dam with a concrete spillway. It is recommended that the areas of erosion both on the upstream and downstream faces where the abutments and embankment interface be repaired. Surface water in these areas should be redirected to prevent future erosion. The riprap on the upstream face should be extended to the dam's crest. The water exiting from the toe and core wall drains should be directed to a control channel and weir where the flow can be periodically measured. The 20-in capped pipe running beneath the dam to the downstream toe should be uncapped and extended to the lower reservoir. This will prevent the potential of a pressurized pipe (should the outlet gate be left open) from bursting and undermining the dam. Although the spillway can not discharge the test flood without overtopping the dam, the spillway capacity is comparatively large. Because of the hydrologic and safety relationships between this dam and the lower reservoir, it is necessary that future hydrologic studies concerning spillway capacities at either project should simultaneously encompass studies for both projects.

Book National Program for Inspection of Non Federal Dams  Kendall Company Number 1 Dam  MA 00047   Connecticut River Basin  Colrain  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Kendall Company Number 1 Dam MA 00047 Connecticut River Basin Colrain Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Kendall Company No. 1 Dam is a run of river facility that diverts water into a flume leading to the company's plant. Within the river channel there is a rock-filled, timber crib spillway structure 238 feet long. This overflow structure has a topwidth of 5 feet, and it has 2.9-foot high flashboards on its crest. The height of the dam, measured at the abutments of the spillway overflow section, is 24 feet. Based on visual inspection, the dam is judged to be in poor condition. The major concerns with respect to the integrity of the dam are deterioration of the wood crib abutment structure at the right end of the overflow section; trees growing in the wood crib abutment structure, on the upstream and downstream sides of the right abutment and on the dike; hazards resulting from the existing breach in the dike; lack of adequate erosion protection on the bank of the downstream channel near the left abutment; trees growing on the strip of ground between the dry stone masonry wall, on the left side of the downstream channel, and the right side of the concrete-lined flume on the left side of the valley; and lack of a low-level outlet for the dam. The spillway capacities are, respectively, about 22 percent and 38 percent of the routed test flood outflows. The depths of overtopping of the dam and dike that would occur during the test flood are 4.2 feet with the flashboards in place, and 3.5 feet with the flashboards removed.

Book National Program for Inspection of Non Federal Dams  Powder Mill Pond Dam  MA 00092   Connecticut River Basin  South Barre  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Powder Mill Pond Dam MA 00092 Connecticut River Basin South Barre Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Stevens Paper Company  Upper  Dam  MA 00075   Hampden County  Westfield  Massachusetts

Download or read book National Program for Inspection of Non Federal Dams Stevens Paper Company Upper Dam MA 00075 Hampden County Westfield Massachusetts written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 24 pages. Available in PDF, EPUB and Kindle. Book excerpt: Stevens Paper Co. (Upper) Dam consists of a stone masonry spillway 150 feet long and a maximum height of 18 feet near the right abutment. The average height of the spillway is approximately 15 feet. The abutment walls and embankments rise 8 feet above the spillway crest on both banks. Crane Pond is formed by the Lower Stevens Co. Dam and would experience a surge as a result of a failure of the Upper Stevens Dam. However, assuming no reduction in the failure outflow in the 1.3 mile reach, a 5 foot freeboard would remain at the lower dam. Downstream of the Lower Stevens Dam is an extensive, under-developed flood plain which would attenuate any surge which might pass through Crane Pond. As there is no apparent increase in hazard above that which would exist in prior to failure, the hazard potential of the Upper Stevens Dam is considered low. Based on this finding, the Phase I assessment of the condition of the dam has not been performed.

Book National Program for Inspection of Non Federal Dams  Chicopee Reservoir  MA 00720   Connecticut River Basin  Chicopee  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Chicopee Reservoir MA 00720 Connecticut River Basin Chicopee Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: Chicopee Reservoir Dam is a 545-foot long, 47-foot high earth embankment dam constructed circa 1926. The spillway is a 44-foot long ogee crest which si located at the right abutment of the dam and has a crest elevation (El) 168.0. The outlet conduits are a 24-inch cast-iron former water supply line and a 30-inch cast-iron blowoff. The following deficiencies were observed at the site: high degree of erosion of the principal spillway chute structure and outlet training walls; erosion gullies on the right abutment above the dam crest; brush growth on the downstream slope of the embankment; and seepage from the left abutment downstream of the dam. Generally, the dam is in fiar condition. The adopted spillway Test Flood is equal to the Probable Maximum Flood which yields a peak test flood inflow of 7565 cfs. Hydraulic analyses indicate that the spillway, without flashboards, with the water surface at the top of the dam can discharge 3,950 cfs which is less than the total routed test flood outflow of 6,450 cfs. Thus, the spillway can discharge 60% of the routed test flood outflow.

Book National Program for Inspection of Non Federal Dams  Buckley Dunton Dam  MA 00202   Connecticut River Basin  Becket  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Buckley Dunton Dam MA 00202 Connecticut River Basin Becket Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 22 foot high, 370 foot long earth embankment dam with an ungated 35 foot long spillway weir and a manually operated 24 inch main drain. The visual inspection indicated the dam to be in generally fair condition. The dam has a size classification of intermediate and a hazard potential classification of high. The Owner should institute remedial measures which include: maintenance of brush growth on the slopes, repair of eroded concrete, etc.

Book National Program for Inspection of Non Federal Dams  Stevens Pond Outlet Dam  MA 00232   Merrimack River Basin  Lawrence  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Stevens Pond Outlet Dam MA 00232 Merrimack River Basin Lawrence Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam appears to be in good condition, The 'V' spillway is 90 ft. long with effective abutments of about 10 ft. on either end. The dam is about 15 ft. high at the abutments. Although the dam is in the small size category the hazard potential is extremely high and thus the situation was analyzed using the full probable maximum flood. A failure of the dam would overflow the left bank immediately below the dam, flood nearby buildings and streets.

Book National Program for Inspection of Non Federal Dams  Northampton Reservoir  Lower Dam   MA 00520   Connecticut River Basin  Whately  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Northampton Reservoir Lower Dam MA 00520 Connecticut River Basin Whately Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 1200 ft. long, 23 ft. high earth embankment dam. The visual inspection of the dam did not disclose any immediate stability problems. It is recommended that the seepage condition below the toe of the dam be investigated and an adequate collection and monitoring system be designed.