EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Meredith Reservoir Dam  NH 00308   Merrimack River Basin  Meredith  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Meredith Reservoir Dam NH 00308 Merrimack River Basin Meredith New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill dam about 400 ft. long with a maximum height of 25 ft. dam is small in size wiht a significant hazard potential. The dam is judged to be in fair overall condition. Trees and brush are growing on the dam embankment and the spillway is showing signs of deterioration. It is recommended that a periodic annual technical inspection be implemented.

Book Government Reports Annual Index

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1016 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

Book National Program for Inspection of Non Federal Dams  Lake Waukewan Dam  NH 00306   Merrimack River Basin  Meredith  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Lake Waukewan Dam NH 00306 Merrimack River Basin Meredith New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a manmade outlet facility between lake Waukewan and Lake Winnepesaukee. The dam is in fair condition as a result of a modification completed in 1976. Further hydrological studies are required to establish the need for, and means, of providing an emergency spillway. (Author).

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1985-10 with total page 1060 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Program for Inspection of Non Federal Dams  Merrimack Village Dam  NH 00115   Merrimack River Basin  Merrimack  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Merrimack Village Dam NH 00115 Merrimack River Basin Merrimack New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: The concrete dam is about 180 ft. long and is constructed on a circular arc. It is small in size with a low hazard potential classification. The dam is in fair condition. At the present time, there is no way to draw down the level of the reservoir. A program of annual technical inspections of the dam should be undertaken.

Book National Program for Inspection of Non Federal Dams  Weare Reservoir Dam  NH 00114   Merrimack River Basin  Weare  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Weare Reservoir Dam NH 00114 Merrimack River Basin Weare New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an on-stream concrete gravity dam. It is 340 ft. long and 34 ft. high. The dam is assessed to be in fair condition. It is recommended that the State carry out its planned renovation program, with a few additions, within the next couple of years. (Author).

Book National Program for Inspection of Non Federal Dams  Millville Reservoir Dam  NH 00030   NHWRF209 08  Merrimack River Basin  Salem  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Millville Reservoir Dam NH 00030 NHWRF209 08 Merrimack River Basin Salem New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earth and concrete dam with an overall length of 484 ft. and a height of 20 ft. The drainage consists of 10.1 square miles of rolling terrain. It is small in size with a significant hazard potential. It is in poor condition at the present time. Several further investigations and remedial measures need to be implemented at the site. (Author).

Book National Program for Inspection of Non Federal Dams  Reservoir Number One  MA 00337  Merrimack River Basin  Framingham  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Reservoir Number One MA 00337 Merrimack River Basin Framingham Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: Total length of the dam is about 800 ft. with a height of about 22 ft. Although there were some minor deficiencies noted the dam is considered to be in good condition. It is intermediate in size with a hazard potential of high.

Book National Program for Inspection of Non Federal Dams  Sanborn Pond Outlet Dam  NH 00182   NHWRB Number 143 10  Merrimack River Basin  Loudon  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Sanborn Pond Outlet Dam NH 00182 NHWRB Number 143 10 Merrimack River Basin Loudon New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sanborn Pond Outlet dam is an earthen embankment structure about 265 feet in overall length and a maximum height of 16.5 feet from crest of dam to downstream toe. The upstream and downstream faces consists of a 2 feet thick vertical dry stone masonry wall which extends the full height of the dam. Located about 105 feet from the left abutment is the principal spillway which consists of a 19 feet long spillway structure with vertical dry masonry training walls and flashboards. The dam in considered to be in poor condition with some major concern which must be corrected. It is intermediate in size with a significant hazard potential. Keywords include: Visual inspection, Dam safety, Merrimack River Basin, Louden, New Hampshire, and Sanborn Brook.

Book National Program for Inspection of Non Federal Dams  Baker Floodwater Reservoir Site 5 and Dike  NH 00245   00246   NHWRB Number 249 11  Merrimack River Basin  Wentworth  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Baker Floodwater Reservoir Site 5 and Dike NH 00245 00246 NHWRB Number 249 11 Merrimack River Basin Wentworth New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 807 ft. long 48 ft. high earthen structure. The dike is an earthen structure about 600 ft. long and 11.5 ft. high. The inspection revealed both the dam and dike to be in good condition. There were no recommendations for the dam after this inspection. The dam is intermediate in size with a significant hazard potential. (Author).

Book National Program for Inspection of Non Federal Dams  Souhegan River Watershed Dam Number 13  NH 00432   00481   NHWRB175 20 Merrimack River Basin  New Ipswich  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Souhegan River Watershed Dam Number 13 NH 00432 00481 NHWRB175 20 Merrimack River Basin New Ipswich New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Souhegan River Watershed Dam No. 13 consists of two earth embankment sections known as the main dam and the east dike. The main dam is 500 ft. long and 13.5 ft. high with a drop inlet service spillway structure and a 30 inch outlet conduit. The east dike is 620 ft. long and 9.5 ft. high with no outlet facilities. An earth emergency spillway 112 ft. wide is cut into the right abutment. It is small in size with a significant hazard potential. The dam is in good condition at the present time. No conditions were observed which require further investigation. There are various remedial measures which must be implemented by the owner. Keywords include: Visual inspection; Dam safety; Merrimack River Basin; New Ipswich, New Hampshire; and Unnamed tributary of the Souhegan River.

Book National Program for Inspection of Non Federal Dams  Souhegan River Watershed Dam Number 26  NH 00207   NHWRB 234 08  Merrimack River Basin  Temple  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Souhegan River Watershed Dam Number 26 NH 00207 NHWRB 234 08 Merrimack River Basin Temple New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Souhegan River Watershed Dam No. 26 is located on Blood Brook, a tributary of the Souhegan River, approximately 2 miles upstream of West Wilton, New Hampshire. The dam is an earth embankment 692 feet long and 79 feet high with a drop inlet service spillway structure and a 30 inch outlet conduit. An emergency spillway 320 feet wide is cut into the left abutment.

Book National Program for Inspection of Non Federal Dams  Crystal Lake Dam  NH 00018   NHWRB Number 91 11  Merrimack River Basin  Gilmanton  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Crystal Lake Dam NH 00018 NHWRB Number 91 11 Merrimack River Basin Gilmanton New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 188 ft. long, 16 ft. high earth embankment dam. The condition is fair. The visual inspection did not disclose any immediate safety problems. The dam's spillway will not pass the test flood, therefore it is recommended that the owner engage a qualified engineer to evaluate further the potential for overtopping the inadequacy of the spillway. (Author).

Book National Program for Inspection of Non Federal Dams  Baker Floodwater Reservoir Site 11A  NH 00247   NHWRB Number 249 14  Merrimack River Basin  Wentworth  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Baker Floodwater Reservoir Site 11A NH 00247 NHWRB Number 249 14 Merrimack River Basin Wentworth New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: Baker Floodwater Reservoir Site 11A is a 640 foot long 24 foot high earthen structure. There is one fill zone in the dam which includes a cutoff wall. Top width of the dam is 12 feet. The upstream and downstream embankments are on a 3 horizontal to 1 vertical slope. Appurtenant structures consist of a principal spillway, plunge pool stilling basin and emergency spillway. The visual inspection revealed that the dam is in good condition. The inspections also revealed random surface cracks and scaling of the concrete on the riser structure. It is small in size with a high hazard potential classification. Keywords include: Inspection, Dam safety, Merrimack River Basin, Wentworth, New Hampshire, and Tributary to Baker River.

Book National Program for Inspection of Non Federal Dams  Souhegan River Watershed Dam Number 14  NH 00433   NHWRB 175 01  Merrimack River Basin  New Ipswich  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Souhegan River Watershed Dam Number 14 NH 00433 NHWRB 175 01 Merrimack River Basin New Ipswich New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Souhegan River Watershed Dam No. 14 is located on Furnace Brook approximately 1/2 mile upstream of New Ipswich Center, NH. The dam is an earth embankment 1,500 feet long and 35 feet high with a drop inlet service spillway structure and a 30 inch outlet conduit. An earth emergency spillway 120 feet wide is cut into the left abutment. It is small in size with a high hazard potential. The test flood is the PMF. The dam is in good condition at the present time although there were some remedial measure which must be undertaken by the owner. No conditions were observed which require additional investigation. Keywords include: Visual inspection, Dam safety, Merrimack River Basin, New Ipswich, New Hampshire, and Furnace Brook tributary of Souhegan River.

Book National Program for Inspection of Non Federal Dams  Wheeler Dam  NH 00028   Arlington Mill Reservoir  Merrimack River Basin  Salem  New Hampshire  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Wheeler Dam NH 00028 Arlington Mill Reservoir Merrimack River Basin Salem New Hampshire Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a concrete gravity dam with earth abutments. It is 730 ft. long and the maximum height of it is 54 ft. The dam is assessed to be in poor condition due to unusual and severe concrete surface spalling, aggravated in places by erosion. (Author).