EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book National Program for Inspection of Non Federal Dams  Arm Brook Multiple Purpose Dam  MA 00604  Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Arm Brook Multiple Purpose Dam MA 00604 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 115 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 760 ft. long, 59 ft. high earth embankment dam. The visual inspection did not disclose any findings that indicate immediate unsafe condition. Although the dam is in generally good condition, it is recommended that certain measures be taken. (Author).

Book National Program for Inspection of Non Federal Dams  West Parish Filter Number 3 Dam  MA 00610   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams West Parish Filter Number 3 Dam MA 00610 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: West Parish Filter No. 3 Dam is an earthen embankment structure 37.5 feet high and 800 feet long. A side-channel spillway is located at the right abutment. It has a concrete overflow section which is 23.4 feet long. Outlet piping passes beneath the embankment and connects directly to the water treatment plant which serves the City of Springfield, Mass. The dam is situated on a very small (0.07 sq. mi) drainage area, and serves as offstream storage and as a sedimentation basin for water which is piped from other dams. Based on the visual inspection, the dam is judged to be in fair condition. The following deficiencies were observed at the dam: a soft, wet area near the downstream toe; a row of evergreen trees along the downstream toe with some roots penetrating the embankment; rodent holes on the downstream slope; wheel tracks on the crest of the dam; misaligned riprap and loose rock and trees overhanging the spillway; low areas on the top of the dam; and no means of controlling flow at the upstream end of the outlet conduit. The spillway capacity is about 335 percent of the routed test flood outflow of 142 cfs. During the test flood, the freeboard would be 1.9 feet.

Book National Program for Inspection of Non Federal Dams  Stevens Paper Company  Lower  Dam  MA 00074   Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Stevens Paper Company Lower Dam MA 00074 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam generally consists of a 190 foot masonry spillway, an earthfill embankment and 2 outlet pipes. The dam was designed in 1955 by Stone and Webster Engineering Corporation to replace an earlier dam, which was damaged by the flood of that year. Construction which utilized portions of the original structure was completed in 1957. The visual inspection showed the dam to be in good condition. However, water passing over the spillway limited the inspection of the spillway. The spillway is capable of passing 96% of the test flood outflow. The top of the embankment, elevation 175, would be overtopped by about 1 foot. However, failure under this condition would only cause insignificant damage as the downstream flooding would have already occurred. The dam is generally in good condition. However, it is recommended that the owner repair the drawdown outlet, and operate it at least once yearly to insure continued adequacy. After this outlet is repaired, or during a period of low flow, the owner should engage a qualified engineer to inspect the spillway without water flowing over it. Also the erosion of a retaining wall downstream of the spillway on the right abutment side should be repaired.

Book National Program for Inspection of Non Federal Dams  Black Brook Dam  MA 01057   Connecticut River Basin  Blandford  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Black Brook Dam MA 01057 Connecticut River Basin Blandford Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 132 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Black Brook Dam is an earthfill embankment about 1168 feet in length, and 60 feet in height and has a reinforced concrete principal spillway which maintains the water supply pool level and controls the release of stored floodwater, and a 50 foot wide earth and ledge excavated emergency spillway channel in the right abutment. The dam and appurtenances were found to be in fair condition. The visual inspection indicated that silt from under the upstream riprap is being washed out by runoff and wave action to form small deltas in the pond, the trash rack on the riser has been damaged, the toe of the dam is wet along the abutments and the floor of the discharge channel of the emergency spillway is wet. Some maintenance and minor remedial work is required. The combined spillways have a capacity of about 5000 CFS with the water level at the top of the dam. This capacity is about 185% of the routed test flood outflow from the reservoir.

Book National Program for Inspection of Non Federal Dams  Powdermill Brook Detention Dam  MA 00605  Connecticut River Basin  Westfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Powdermill Brook Detention Dam MA 00605 Connecticut River Basin Westfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 642 ft. long, 60 ft. high earth embankment flood retention dam. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The dam is generally in good condition. It should be assured that the gate on the intake structure is in good working order. Barriers should be installed to prevent further intrusion by motorized vehicles. (Author).

Book National Program for Inspection of Non Federal Dams  Palmer Brook Dam MA 00205  Connecticut River Basin  Becket  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Palmer Brook Dam MA 00205 Connecticut River Basin Becket Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Palmer Brook Dam is an earthen embankment structure 33.5 feet high and 290 feet long. Based on visual inspection the dam is judged to be in good condition. It is classified as 'intermediate' in size with a 'high' hazard potential.

Book National Program for Inspection of Non Federal Dams  Ware Industries Main  Upper  Dam  MA 00594   Connecticut River Basin  Ware  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Ware Industries Main Upper Dam MA 00594 Connecticut River Basin Ware Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Ware Industries Man (Upper) Dam consists of a main spillway 115 ft. long and approximately 34 ft. high, a spillway extension 50 ft. long and 4 ft. high, a concrete emergency spillway, a gate house with control works to a canal, and a 115 ft. long overflow weir from the canal. Based on a visual examination of the structure, the project is in good to fair condition. There was no evidence of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 109,200 cfs would overtop the dam by 11.25 ft. With the water level at the top of dam, the spillway system can pass 7980 cfs which is 7.3 percent of the test flood.

Book National Program for Inspection of Non Federal Dams  Roaring Brook Dam MA 01056  Connecticut River Basin  Conway  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Roaring Brook Dam MA 01056 Connecticut River Basin Conway Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 65 ft. high, 435 ft. long earth embankment dam with an ungated spillway containing provisions for 24 inch flashboards and a manually operated 18 inch main drain. Based on the visual inspection, the dam seems to be in good condition. However, due to the lack of an accessible upstream control for the drain, the dam is considered in fair condition. It is intermediate in size with a hazard classification of high. (Author).

Book National Program for Inspection of Non Federal Dams  Westfield Reservoir Dam  MA 00734  Connecticut River Basin  Montgomery  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Westfield Reservoir Dam MA 00734 Connecticut River Basin Montgomery Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Westfield Reservoir Dam is an earthen embankment structure about 350 feet long and 40 feet high. It has an uncontrolled overflow spillway located on the left (east) abutment and a 24-inch diameter cast-iron pipe outlet conduit which passes beneath the dam and which is valve controlled at the outlet end. Based on the visual inspection, the dam is judged to be in air condition. The following deficiencies were observed at the dam: minor but widespread slumping on the downstream slope; an animal burrow on the downstream slope; large trees near both abutments; a soft, wet area along the right bank of the downstream channel; a small sinkhole on the right side of the spillway discharge channel; lack of vegetation on the crest of the dam; inoperable valves on the downstream end of the outlet conduit; and no valve or other means of regulating or shutting off flow at the intake end of the outlet conduit. With the stoplog in place, the spillway capacity of Westfield Reservoir Dam is 707 cfs, which is about 15 percent of the routed test flood outflow of 4670 cfs. With the stoplog removed, the spillway capacity is about 994 cfs, which is about 21 percent of the routed test flood outflow. The test flood would cause the dam to be overtopped by about 3.5 feet.

Book National Program for Inspection of Non Federal Dams  Kendall Company Number 1 Dam  MA 00047   Connecticut River Basin  Colrain  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Kendall Company Number 1 Dam MA 00047 Connecticut River Basin Colrain Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Kendall Company No. 1 Dam is a run of river facility that diverts water into a flume leading to the company's plant. Within the river channel there is a rock-filled, timber crib spillway structure 238 feet long. This overflow structure has a topwidth of 5 feet, and it has 2.9-foot high flashboards on its crest. The height of the dam, measured at the abutments of the spillway overflow section, is 24 feet. Based on visual inspection, the dam is judged to be in poor condition. The major concerns with respect to the integrity of the dam are deterioration of the wood crib abutment structure at the right end of the overflow section; trees growing in the wood crib abutment structure, on the upstream and downstream sides of the right abutment and on the dike; hazards resulting from the existing breach in the dike; lack of adequate erosion protection on the bank of the downstream channel near the left abutment; trees growing on the strip of ground between the dry stone masonry wall, on the left side of the downstream channel, and the right side of the concrete-lined flume on the left side of the valley; and lack of a low-level outlet for the dam. The spillway capacities are, respectively, about 22 percent and 38 percent of the routed test flood outflows. The depths of overtopping of the dam and dike that would occur during the test flood are 4.2 feet with the flashboards in place, and 3.5 feet with the flashboards removed.

Book National Program for Inspection of Non Federal Dams  Perley Brook Reservoir Dam  MA 00119  Connecticut River Basin  Gardner  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Perley Brook Reservoir Dam MA 00119 Connecticut River Basin Gardner Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Perley Brook Reservoir Dam is a 1000 foot long earthfill dam. The dam has a maximum height of 50 feet with the top at Elevation 1032.0. The dam is in fair condition. The dam has been classified in the 'intermediate' size and 'high' hazard categories. A test flood equal to the full PMF was used to evaluate the capacity of the spillway. (Author).

Book National Program for Inspection of Non Federal Dams  Woronoco Mills  60 Feet  Dam MA 00738  Woronoco Mills  29 Feet  Dam MA 00737  Connecticut River Basin  Russell  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Woronoco Mills 60 Feet Dam MA 00738 Woronoco Mills 29 Feet Dam MA 00737 Connecticut River Basin Russell Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 111 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dams are in fair condition, due to the potential overtopping of the dams during the occurrence of the test flood and the reported overtopping of the dams during prior floods. There is some eroding of concrete joints in the dam, deteriorated concrete on appurtenant structures and observed seepage both from the joints in the concrete and from the embankments. The east dike is heavily overgrown with brush and young trees. Hydraulic analysis indicates that the test flood stage would be at elevation 240.3 which is approximately 4.3 feet above the top of the right embankment. Approximately 95 percent of the test flood would pass over the 60 foot dam, 29 foot dam and the small dam spillways. The remaining flow would be over the right embankment between the screen house and the mill building.

Book National Program for Inspection of Non Federal Dams  West Lake Dam  MA 00288   Connecticut River Basin  Sandisfield  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams West Lake Dam MA 00288 Connecticut River Basin Sandisfield Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 181 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill embankment about 920 feet in length, and 25 feet in height and has a reinforced concrete principle spillway, The dam has been rated fair. It has a classification of intermediate size and high hazard. Failure of the dam would pose a serious threat to about 11 houses, two major highway bridges, and three secondary road crossings.

Book National Program for Inspection of Non Federal Dams  Northampton Reservoir  Upper Dam   MA 00521   Connecticut River Basin  Whately  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Northampton Reservoir Upper Dam MA 00521 Connecticut River Basin Whately Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam is a 940 foot long earth embankment dam with a concrete spillway. It is recommended that the areas of erosion both on the upstream and downstream faces where the abutments and embankment interface be repaired. Surface water in these areas should be redirected to prevent future erosion. The riprap on the upstream face should be extended to the dam's crest. The water exiting from the toe and core wall drains should be directed to a control channel and weir where the flow can be periodically measured. The 20-in capped pipe running beneath the dam to the downstream toe should be uncapped and extended to the lower reservoir. This will prevent the potential of a pressurized pipe (should the outlet gate be left open) from bursting and undermining the dam. Although the spillway can not discharge the test flood without overtopping the dam, the spillway capacity is comparatively large. Because of the hydrologic and safety relationships between this dam and the lower reservoir, it is necessary that future hydrologic studies concerning spillway capacities at either project should simultaneously encompass studies for both projects.

Book National Program for Inspection of Non Federal Dams  McLean Reservoir  MA 00539   Connecticut River Basin  Holyoke  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams McLean Reservoir MA 00539 Connecticut River Basin Holyoke Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 700 foot, 35 foot high earthfill embankment and a 920 foot long, 15 foot high earth-fill dike a gatehouse with outlet controls and a 10 foot wide concrete arch emergency spillway. With the water lever assumed to spillway crest at time of test flood, spilway discharge of about 30 cfs woudl occur. The reservoir woudl be surcharged to elevation 433, four feet above the spillway crest and two feet below the dam crest. The dam will not be overtopped. The dam is generally in fair condition. Remedial measures consist of removal of all brush and trees from the downstream slope of the main dam and spillway channel and repair of spalled and deteriorated concrete on the emergency spillway.

Book National Program for Inspection of Non Federal Dams  Indian Orchard  MA 00722   Connecticut River Basin  Springfield Ludlow  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Indian Orchard MA 00722 Connecticut River Basin Springfield Ludlow Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is generally comprised of a 401-foot long, 10 to 28 foot high main spillway, a head gate building, an overflow canal spillway and a canal leading to two 8 foot diameter penstocks used in electrical power generation. There are two inoperable gates located in the main dam. The dam is normally operated with two feet of flashboards above the spillway crest. The visual inspection did not disclose any findings that indicate an immediate unsafe condition. The 1 /2 PMF test flood used will produce an inflow/outflow of 70,830 cfs. The dam is a run-of-the-river type and the spillway crest would be overtopped by about 14 feet. The spillway has a capacity of 29,500 cfs (42 percent of 1/2 PMF outlfow) at elevation 166.6, top of non-overflow section. The non-overflow section is overtopped by about six feet. This flow would not overtop the upstream training walls which are at elevation 174.0. The overall condition of the dam is considered fair due to the lack of adequate draw down capacity. Remedial measures consist of removing vegetation from the downstream face of the dam, further observation of seepage at the right abutment, repair the wooden crest cover, and develop a formal warning system to warn downstream areas in case of an emergency.

Book National Program for Inspection of Non Federal Dams  Mountain Lake Dam  MA 00530   Connecticut River Basin  Chicopee  Massachusetts  Phase I Inspection Report

Download or read book National Program for Inspection of Non Federal Dams Mountain Lake Dam MA 00530 Connecticut River Basin Chicopee Massachusetts Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 200 ft. long, having a maximum height of about 28 ft. It consists of an earth embankment with no upstream shore protection and natural vegetation on the crest and downstream face. It is in poor condition. It is small in size and has a high hazard potential classification.