EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Technical Abstract Bulletin

Download or read book Technical Abstract Bulletin written by and published by . This book was released on with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  No Name Dam Number 31  NJ 00519   Raritan River Basin  Cramers Creek  Hunterdon County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program No Name Dam Number 31 NJ 00519 Raritan River Basin Cramers Creek Hunterdon County New Jersey Phase 1 Inspection Report written by Anthony G. Posch and published by . This book was released on 1979 with total page 87 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1980 with total page 954 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Clinton Mills Dam  NJ00122   Raritan River Basin  South Branch of Raritan River  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Clinton Mills Dam NJ00122 Raritan River Basin South Branch of Raritan River Hunterdon County New Jersey Phase I Inspection Report written by Richard J. McDermott and published by . This book was released on 1980 with total page 86 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam was inspected on 19 and 28 November 1979 by Storch Engineers under contract to the State of New Jersey. The State, under agreement with the U.S. Army Engineer District, Philadelphia, has this inspection performed in accordance with the National Dam Inspection Act, Public Law 92-367. Clinton Mills Dam, initially listed as a 'high' hazard potential structure, but reduced to a 'significant' hazard potential structure as a result of this inspection, is judged to be in fair overall condition. The dam's spillway is considered inadequate because a flow equivalent to five percent of the Spillway Design Flood - SDF- would cause the dam to be overtopped. (The SDF, in this instance, is one half of the Probable Maximum Flood.).

Book National Dam Safety Program  J  Seward Johnson Dam  NJ00770   Raritan River Basin  Cold Brook  Hunterdon County  New Jersey  Phase I  Inspection Report

Download or read book National Dam Safety Program J Seward Johnson Dam NJ00770 Raritan River Basin Cold Brook Hunterdon County New Jersey Phase I Inspection Report written by Abraham Perea and published by . This book was released on 1981 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. The dam appeared to be in a generally satisfactory condition with the water level at normal pool elevation at the time of inspection. The is a crescent-shaped structure (see Figure 2) constructed on a gentle and uniformly sloping hillside. Matted grass on the crest indicates the presence of an occasional vehicle, although severe rutting was not observed. Heavy brush and an occasional young conifer were noted in scattered areas on the left half of the downstream embankment, while somewhat thinner growth covered the upstream face of the dam. The alignment of the crest is satisfactory. No slumping, cracking, or seepage was observed although some rodent burrows were noted on the downstream slope and light erosion was evident at several locations on the upstream face.

Book National Dam Safety Program  Lake Solitude Dam  NJ00123   Raritan River Basin  South Branch Raritan River  Hunterdon County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program Lake Solitude Dam NJ00123 Raritan River Basin South Branch Raritan River Hunterdon County New Jersey Phase 1 Inspection Report written by Robert J. Jenny and published by . This book was released on 1979 with total page 113 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book National Dam Safety Program  Camp Beisler Dam  NJ 00141   Raritan River Basin  Spruce Run  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Camp Beisler Dam NJ 00141 Raritan River Basin Spruce Run Hunterdon County New Jersey Phase I Inspection Report written by John P. Talerico and published by . This book was released on 1981 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: Camp Beisler Dam is an earthfill dam with a concrete drop inlet, the main spillway, located in the center of the dam. In addition there is an auxiliary spillway at the right end of the dam. The overall condition of the dam is good. There are no signs of distress or instability in the embankment. Possible seepage was observed approximately 100 feet from the left end of the dam. The low-level outlet was not opened and is not used. The hazard potential is recommended to be downgraded from 'high' to 'significant'. Camp Beisler Dam is considered inadequate in view of its lack of spillway capacity to pass the SDF (1/2 PMF) without overtopping the dam. The spillway is capable of passing a flood equal to 30.5 percent of the PMF (61 percent of the 1/2 PMF), and is assessed as 'inadequate'. At present, the engineering data available is not sufficient to make a definitive statement on the stability of the dam, but based on the findings of the visual inspection, the preliminary assessment of static stability is that it is satisfactory.

Book National Dam Safety Program  Rockafellows Mills Dam  NJ00568   Raritan River Basin  South Branch Raritan River  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Rockafellows Mills Dam NJ00568 Raritan River Basin South Branch Raritan River Hunterdon County New Jersey Phase I Inspection Report written by John P. Talerico and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book N J  No Name No  30 Dam  NJ00339

Download or read book N J No Name No 30 Dam NJ00339 written by John J. Williams and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  N J  No Name Dam Number 53  NJ00809  Passaic River Basin  Tributary of Whippany River  Morris County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program N J No Name Dam Number 53 NJ00809 Passaic River Basin Tributary of Whippany River Morris County New Jersey Phase I Inspection Report written by NEW JERSEY DEPT OF ENVIRONMENTAL PROTECTION TRENTON. and published by . This book was released on 1981 with total page 64 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).

Book J  Steward Johnson Dam  NJ 00770

Download or read book J Steward Johnson Dam NJ 00770 written by Louis Berger and Associates and published by . This book was released on 1981 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Raritan River Basin  Lawrence Brook  Middlesex County  New Jersey  Davidsons Mill Pond Dam

Download or read book Raritan River Basin Lawrence Brook Middlesex County New Jersey Davidsons Mill Pond Dam written by United States. Army. Corps of Engineers. Philadelphia District and published by . This book was released on 1978 with total page 118 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book N J  No Name No  56 Dam  NJ00804

Download or read book N J No Name No 56 Dam NJ00804 written by Richard J. McDermott and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Grover s Mill Dam  NJ00155   Raritan River Basin  Big Bear Brook  Mercer County  New Jersey  Phase 1 Inspection Report

Download or read book National Dam Safety Program Grover s Mill Dam NJ00155 Raritan River Basin Big Bear Brook Mercer County New Jersey Phase 1 Inspection Report written by Richard J. McDermott and published by . This book was released on 1980 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam was inspected on 12 November 1979 by Storch Engineers under contract to the State of New Jersey. The State, under agreement with the U.S. Army Engineer District, Philadelphia, had this inspection performed in accordance with the National Dam Inspection Act, Public Law 92-367. Grover's Mill Dam, a high hazard potential structure, is judged to be in fair overall condition. The dam's spillway is considered inadequate because a flow equivalent to seven percent of the Spillway Design Flood - SDF - would cause the dam to be overtopped. (The SDF, in this instance, is one half of the Probable Maximum Flood). The decision to consider the spillway 'inadequate' instead of 'seriously inadequate' is based on the determination that dam failure from overtopping would not significantly increase the hazard to loss of life downstream from the dam from that which would exist just before overtopping failure.

Book National Dam Safety Program  Nishisakwick Creek Dam  NJ 00 129   Delaware River Basin  Nishisakwick Creek  Hunterdon County  New Jersey  Phase I Inspection Report

Download or read book National Dam Safety Program Nishisakwick Creek Dam NJ 00 129 Delaware River Basin Nishisakwick Creek Hunterdon County New Jersey Phase I Inspection Report written by Anthony G. Posch and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).