EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Technical Abstract Bulletin

Download or read book Technical Abstract Bulletin written by and published by . This book was released on with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Nanticoke Creek Watershed Project Site Number 8  Inventory Number NY 573   Susquehanna River Basin  Broome County  New York  Phase 1 Inspection Report

Download or read book National Dam Safety Program Nanticoke Creek Watershed Project Site Number 8 Inventory Number NY 573 Susquehanna River Basin Broome County New York Phase 1 Inspection Report written by George Koch and published by . This book was released on 1979 with total page 74 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Nanticoke Creek Watershed Protection Project Dam Site No. 8 was found to have no conditions which would render the dam unsafe. Minor maintenance actions were recommended. (Author).

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1980 with total page 954 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Nanticoke Creek Watershed Project Floodwater Retarding Dam Site 9 C  Inventory Number N Y  628   Susquehanna River Basin  Broome County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Nanticoke Creek Watershed Project Floodwater Retarding Dam Site 9 C Inventory Number N Y 628 Susquehanna River Basin Broome County New York Phase I Inspection Report written by Lawrence D. Andersen and published by . This book was released on 1981 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Based on the evaluation of the existing conditions, the condition of the Nanticoke Creek Watershed Project - Floodwater Retarding Dam Site 9-C is considered to be good. The examination of documents and visual observations did not reveal conditions which consitute a hazard to human life or property. The spillway capacity was evaluated according to the recommended procedure and was found to pass the required spillway design flood of 100 percent of the Probable Maximum Flood (PMF). Therefore, the spillway capacity is rated to be adequate. (Author).

Book Old Growth in the East

Download or read book Old Growth in the East written by Mary D. Davis and published by . This book was released on 1993 with total page 158 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Nanticoke Creek Watershed Project Floodwater Retarding Dam Site 7 B  Inventory Number N Y  605   Susquehanna River Basin  Tioga County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Nanticoke Creek Watershed Project Floodwater Retarding Dam Site 7 B Inventory Number N Y 605 Susquehanna River Basin Tioga County New York Phase I Inspection Report written by Lawrence D. Andersen and published by . This book was released on 1981 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Based on the evaluation of the existing conditions, the condition of the Nanticoke Creek Watershed Project-Floodwater Retarding Dam Site 7-B is considered to be good. The examination of documents and visual observations did not reveal conditions which constitute a hazard to human life or property. The spillway capacity was evaluated according to the recommended procedure and was found to pass the required spillway design flood of 100 percent of the Probable Maximum Flood (PMF). Therefore, the spillway capacity is rated as adequate. (Author).

Book National Dam Safety Program  Patterson Brixius Grey Creek Watershed Project  Site 2  Inventory Number NY 725   Susquehanna River Basin  Broome County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Patterson Brixius Grey Creek Watershed Project Site 2 Inventory Number NY 725 Susquehanna River Basin Broome County New York Phase I Inspection Report written by George Koch and published by . This book was released on 1980 with total page 108 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is located on Brixius Creek, a tributary of the Susquehanna River, approximately 1/2 mile north of Union, NY. The examination of documents and visual inspection of the Site 2 Dam and appurtenant structures did not reveal conditions which constitute a hazard to human life or property. The discharge capacity of the spillways is adequate for the PMF (Probable Maximum Flood). However the following remedial actions must be completed within 1 year from notification to the owner: (1) Eliminate the pedestrian traffic on the embankment and auxiliary spillway, backfill all depressions and reseed these areas; (2) repair the depressions on the upstream slope in the vicinity of the riser and beyond the downstream toe of the dam; (3) Remove the parking area from the auxiliary spillway channel and reseed the affected area; (4) Remove the vegetation from the inlet and outlet of the auxiliary spillway, and the downstream channel; (5) Investigate the conditions of the reservoir drain and restore to operational status, if required; (6) Repair the erosion or the Taft Road embankment and clean out the sediment within the 6 feet diameter highway culvert; and (7) provide a program of periodic inspection and maintenance of the dam and appurtenances, including yearly operation and lubrication of the reservoir drain system.

Book National Dam Safety Program  Patterson  Brixius  Grey Creek Watershed Project  Site 1  Inventory Number NY698   Susquehanna River Basin  Broome County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Patterson Brixius Grey Creek Watershed Project Site 1 Inventory Number NY698 Susquehanna River Basin Broome County New York Phase I Inspection Report written by and published by . This book was released on 1980 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Site 1 Dam consists of a 1300 feet long homogeneous earth embankment with an auxiliary spillway located at the right end of the embankment in a cut section beyond the abutment of the embankment. The maximum height of the dam is 65 feet. The embankment has a crest width of 20 feet, an upstream slope of 1 vertical on 3 horizontal, and a downstream slope of 1 on 2.5. The auxiliary spillway is a vegetated earth channel, with a bottom width of 340 feet and side slopes of 1 on 3 (left slope) and 1 on 2 (right slope). The principal spillway is a rectangular concrete riser which extends above the upstream slope near the toe of slope. The riser is topped by a triangular trash rack, the sides of which form a drop inlet, which is utilized during high reservoir levels. Under low flow conditions, a rectangular low stage inlet, in the upstream face of the riser, controls the reservoir level. A 30 inch diameter reinforced concrete pipe controls the flow between the riser and the impact basin located at the toe of the dam. An 18 inch diameter pipe, with a manually operated slide gate, the controls of which are located atop the riser, serve as the reservoir drain system. The examination of documents and visual inspection of the Site 1 Dam and appurtenant structures did not reveal conditions which constitute a hazard to human life or property. The discharge capacity of the spillway is adequate for the PMF (Probable Maximum Flood).

Book National Dam Safety Program  Little Choconut Watershed Site 2A Dam  Inventory Number NY 720   Susquehanna River Basin  Broome County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Little Choconut Watershed Site 2A Dam Inventory Number NY 720 Susquehanna River Basin Broome County New York Phase I Inspection Report written by Hugh C. Flaherty and published by . This book was released on 1981 with total page 175 pages. Available in PDF, EPUB and Kindle. Book excerpt: Little Choconut Watershed Site 2A Dam is one of eight floodwater retarding dams in the Little Choconut, Finch Hollow, and Trout Brook watersheds designed to reduce floodwater damages. The dam embankment is approximately 530 feet long, 33 feet high and has an upstream slope of 3 horizontal to 1 vertical and a downstream slope of 2.5 to 1. The principal spillway is a drop inlet structure consisting of a single stage reinforced concrete riser, a 24 inch diameter prestressed concrete cylinder pipe and a channel excavated into bedrock at the outlet of the conduit. The emergency spillway is a curved 80 foot wide channel with 3 to 1 side slopes cut into earth at the left abutment. Hydrologic/hydraulic analyses performed in accordance with the Corps of Engineers' Recommended Guidelines for Safety Inspection of Dams indicate that the principal spillway and the emergency spillway would pass 100 percent of the outflow from the Probable Maximum Flood (PMF) without overtopping the dam. Therefore, the combined spillway capacity is adjudged to be adequate.

Book 1630 1632

    Book Details:
  • Author : Scotland. Privy Council
  • Publisher :
  • Release : 1902
  • ISBN :
  • Pages : 908 pages

Download or read book 1630 1632 written by Scotland. Privy Council and published by . This book was released on 1902 with total page 908 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The Stocking Book

Download or read book The Stocking Book written by Victor Arwas and published by skirt!. This book was released on 2011-11 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Stocking Book navigates the history of stockings from their invention until their present day use and explores the astonishing variety of stockings from the eighteenth century to the present, the way great painters depicted them, the way illustrators and cartoonists made use of them, the way advertisements presented them, and the way they have developed. Complete with full-colored illustrations and cultural commentary, this book provides a delightful history of the stocking and what has made it so classic, so provocative, and so irresistible throughout the ages.

Book National Dam Safety Program  Finch Hollow Watershed Project Site 2  Inventory Number 719  Susquehanna River Basin  Broome County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Finch Hollow Watershed Project Site 2 Inventory Number 719 Susquehanna River Basin Broome County New York Phase I Inspection Report written by George Koch and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. The examination of documents and visual inspection of the Finch Hollow Site 2 Dam did not reveal conditions which constitute a hazard to human life or property. The total discharge capacity of the spillways is adequate to impound and safely discharge the floodwaters resulting from the Probable Maximum Flood (PMF). Several minor deficiencies were noted on this structure. Among these deficiencies were a small depression on the upstream slope near the riser, ponding of water in the bottom of the auxiliary spillway channel, and a substantial accumulation of debris around the intake of the principal spillway riser. These deficiencies should be corrected within 6 months of the date of notification of the owner. In addition, an emergency action plan for notification of downstream residents should be developed within 6 months. (Author).

Book EPA 840 B

    Book Details:
  • Author :
  • Publisher :
  • Release : 2000
  • ISBN :
  • Pages : 66 pages

Download or read book EPA 840 B written by and published by . This book was released on 2000 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Geomorphology of New Zealand

Download or read book Geomorphology of New Zealand written by Charles Andrew Cotton and published by . This book was released on 1922 with total page 492 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book National Dam Safety Program  Little Choconut Watershed Site 2B Dam  Inventory Number 721   Susquehanna River Basin  Broome County  New York  Phase I Inspection Report

Download or read book National Dam Safety Program Little Choconut Watershed Site 2B Dam Inventory Number 721 Susquehanna River Basin Broome County New York Phase I Inspection Report written by Hugh C. Flaherty and published by . This book was released on 1981 with total page 188 pages. Available in PDF, EPUB and Kindle. Book excerpt: Little Choconut Watershed Site 2B Dam is one of eight floodwater retarding dams in the Little Choconut, Finch Hollow, and Trout Brook watersheds designed to reduce floodwater damages. The dam embankment is approximately 790 feet long angling slightly downstream, 56 feet high and has an upstream slope of 3 horizontal to 1 vertical and a downstream slope of 2.5 to 1. The principal spillway is a drop inlet structure consisting of a single stage reinforced concrete riser, a 30 inch diameter prestressed concrete cylinder pipe and a reinforced concrete impact basin. The emergency spillway is a 380 foot long by 55 foot wide channel cut into rock at the right abutment. Hydrologic/hydraulic analyses performed in accordance with the Corps of Engineers' Recommended Guidelines for Safety Inspection of Dams indicate that the principal spillway and the emergency spillway would pass 100 percent of the outflow from the Probable Maximum Flood (PMF) without overtopping the dam. Therefore, the combined spillway capacity is adjudged to be adequate.

Book Public general laws

Download or read book Public general laws written by Maryland and published by . This book was released on 1860 with total page 856 pages. Available in PDF, EPUB and Kindle. Book excerpt: