Download or read book Finding of No Significant Impact for Casper Dave Johnston 230 KV Transmission Line Project Converse and Natrona Counties Wyoming written by United States. Department of Energy and published by . This book was released on 1986 with total page 11 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Casper to Dave Johnson 230 kV Transmission Line Project written by and published by . This book was released on 1986 with total page 146 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Casper to Dave Johnson 230 kV Transmission Line Project written by and published by . This book was released on 1986 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Casper to Dave Johnston 230 kV Transmission Line Project written by United States. Department of Energy and published by . This book was released on 1986 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Thermopolis Alcova Casper Transmission Line Project written by and published by . This book was released on 1984 with total page 352 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Colorado Wyoming 230 KV Transmission Line and Facilities written by and published by . This book was released on 1975 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Rifle Substation Expansion Garfield County Finding of No Significant Impact FONSI B1 Environmental Assessment EA B2 Termination of Craig Rifle 345 KV Transmission Line Borrower s Environmental Report written by and published by . This book was released on 1981 with total page 24 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Thermopolis Alcova Casper Transmission Line Project Wyoming written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This EIS assesses the environmental effects of constructing 152.1 miles of 230-kV or 230/345-kV transmission line between Thermopolis and Alcova, and between Alcova and Casper. Approximately 136.1 miles of the new 230-kV or 230/345-kV line will either replace two existing but deteriorated 69-kV lines or parallel an existing 115-kV line. The remaining 16.0 miles of line will be constructed on a new corridor. In addition, approximately 50.0 miles of 69-kV line will be reconstructed at 69/115-kV between Arminto and Casper. Other minor elements of the project include construction of short 34.5-kV and 69/115-kV connecting lines, and a new substation near Alcova. The purpose of the project is to bring the regional transmission system into compliance with National Electric Reliability Council criteria and to reduce energy losses associated with overloading of the existing system. Alternatives assessed include no action, delay, reduction in the quality of electrical service, alternative transmission technologies, alternative design, and alternative routes. Significant impacts include soil disturbance and increased erosion, potential disturbance of sensitive habitats for sage grouse, bald eagles and raptors, and increased visual impacts created by the replacement of small, wood structures with larger transmission structures.
Download or read book Conrad Shelby Transmission Line Project Pondera County written by and published by . This book was released on 1987 with total page 344 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Riverton Pilot Butte 115 KV Transmission Line and Related Substation Construction Environmental Assessment EA B1 Finding of No Significant Impact FONSI B2 Borrower s Environmental Report written by and published by . This book was released on 1981 with total page 124 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Thermopolis Alcova Casper Transmission Line Project Wyoming written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This EIS assesses the environmental effects of constructing 152.1 miles of 230-kV or 230/345-kV transmission line between Thermopolis and Alcova, and between Alcova and Casper. Approximately 136.1 miles of the new 230-kV or 230/345-kV line will either replace two existing but deteriorated 69-kV lines or parallel an existing 115-kV line. The remaining 16.0 miles of line will be constructed on a new corridor. In addition, approximately 50.0 miles of 69-kV line will be reconstructed at 69/115-kV between Arminto and Casper. Other minor elements of the project include construction of short 34.5-kV and 69/115-kV connecting lines, and a new substation near Alcova. The purpose of the project is to bring the regional transmission system into compliance with National Electric Reliability Council criteria and to reduce energy losses associated with overloading of the existing system. Alternatives assessed include no action, delay, reduction in the quality of electrical service, alternative transmission technologies, alternative design, and alternative routes. Significant impacts include soil disturbance and increased erosion, potential disturbance of sensitive habitats for sage grouse, bald eagles and raptors, and increased visual impacts created by the replacement of small, wood structures with larger transmission structures.
Download or read book Finding of No Significant Impact Warren Air Force Base 115 KV Transmission Line Project Cheyenne Wyoming written by United States. Western Area Power Administration and published by . This book was released on 1986 with total page 7 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Carter Mountain Thermopolis 230 KV Transmission Line Project Hot Springs County Wyoming written by United States. Western Area Power Administration and published by . This book was released on 1992 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Environmental Assessment and Finding of No Significant Impact written by and published by . This book was released on 2000 with total page 146 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.
Download or read book Amselco Project 69 KV Transmission Line and Associated Facilities White Pine Eureka Counties Environmental Assessment EA Finding of No Significant Impact FONSI written by and published by . This book was released on 1981 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Davis Dam to Riviera 230 KV Transmission Line and Associated Facilities Mohave County Environmental Assessment EA Finding of No Significant Impact FONSI written by and published by . This book was released on 1982 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Environmental Assessment written by United States. Western Area Power Administration. Loveland Area Office and published by . This book was released on 1994 with total page 242 pages. Available in PDF, EPUB and Kindle. Book excerpt: