EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Federal Government s Role in Electric Transmission Facility Siting

Download or read book Federal Government s Role in Electric Transmission Facility Siting written by Adam Vann and published by DIANE Publishing. This book was released on 2011-02 with total page 17 pages. Available in PDF, EPUB and Kindle. Book excerpt: The location and permitting of electricity transmission lines and facilities have traditionally been the exclusive province of the states, with only limited exceptions. However, the increasing complexity of the interstate transmission grid, as well as widespread power outages in recent history, has resulted in calls for an increased role for the fed. gov¿t. in transmission siting in an attempt to enhance reliability. This report looks at the history of transmission siting and the reason behind the movement toward an increased fed. role in siting decisions, explains the new fed. role in transmission siting pursuant to The Energy Policy Act of 2005, and discusses legal issues related to this and any potential future expansions of the fed. role. A print on demand report.

Book The Federal Government   s Role in Electric Transmission Facility Siting

Download or read book The Federal Government s Role in Electric Transmission Facility Siting written by and published by . This book was released on 2011 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Electricity Transmission

Download or read book Electricity Transmission written by Matthew H. Brown and published by National Council of Teachers of English. This book was released on 2004 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Transmission Infrastructure

Download or read book Transmission Infrastructure written by United States. Congress. Senate. Committee on Energy and Natural Resources and published by . This book was released on 2009 with total page 118 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Transmission Lines

Download or read book Transmission Lines written by Mark Gaffigan and published by . This book was released on 2008 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: Electricity is central to the national economy and the daily lives of many Americans, powering homes, businesses, and industries. Today, an extensive system consisting of more than 150,000 miles of high-voltage transmission lines works to provide reliable electricity service and transport electricity from power plants to consumers. Federal and state entities share responsibility for regulating the electricity system. On the federal level, the Federal Energy Regulatory Commission (FERC) regulates interstate transmission of electricity and wholesale rates, among other regulatory activities. State public utility commissions are generally responsible for regulating retail electricity sales and, in some cases, planning for new power plants and transmission lines. However, as studies have shown, growth in electricity demand has strained the nation's transmission system, resulting in less flexibility to respond to system problems and an increased risk of potential blackouts. These issues have led some to suggest that new lines or other investments in the transmission system may be required to increase capacity and accommodate growing electricity demand. Several companies have recently introduced proposals to build new high-voltage direct-current (HVDC) transmission lines. Some of these proposed lines would follow active transportation rights of way, such as railroads, highways, and pipelines. Some stakeholders have raised concerns about the potential economic, safety, and security issues related to collocating new HVDC transmission lines along transportation rights of way, particularly for nearby residents and consumers of electric power. Given these issues, Congress included a provision in the Implementing Recommendations of the 9/11 Commission Act of 2007 requiring us to assess the siting of HVDC transmission lines along active railroad and other transportation rights of way and report to appropriate congressional committees. In response to this requirement and after discussions with the committees, we examined (1) the role of the federal government in siting HVDC electric transmission lines along active transportation rights of way, (2) advantages and disadvantages of adding transmission lines and using HVDC technology, and (3) benefits and risks associated with the siting of HVDC electric transmission lines along active transportation rights of way. Historically, the federal government has had a limited role in siting transmission lines. It has generally only made siting decisions on federal lands. State governments, through public utility commissions and other agencies, traditionally approve transmission line siting. However, the Energy Policy Act of 2005 expanded the federal government's role. Specifically, under certain circumstances, FERC now has the authority to approve and issue siting permits for new transmission lines in areas designated by the Department of Energy as National Interest Electric Transmission Corridors (NIETC). However, some stakeholders have expressed concerns about FERC's expanded authority in the national corridors, including how the state siting process will be affected and whether states and the public will be involved in FERC's proceedings. FERC officials told us they expect the review of a transmission line proposal in the national corridors would have little impact on the states' existing process. FERC officials also told us that to the extent FERC receives applications, they expect to consider information from the state siting process as part of their federal proceeding and that states and the public will have opportunities to participate in and comment on the federal siting process. Currently, federal statutes as well as federal and state guidance encourage the collocation of new transmission lines along existing transportation and other rights of way. We identified potential advantages and disadvantages to adding transmission lines and using HVDC technology. According to studies we reviewed and stakeholders we interviewed, adding transmission lines offers potential advantages, including (1) decreased congestion and improved reliability of the electricity system by providing access to additional sources of generation and additional paths for electricity, (2) lower costs for consumers at the end of the line where electricity is received, (3) better utilization of existing power plants and more competitive local wholesale electricity markets, (4) facilitated development of new electricity sources location outside population centers, and (5) facilitated development of renewable energy sources. Stakeholders and studies also identified potential disadvantages of adding transmission lines, including (1) diminished economic or aesthetic values of the land if lines are built above ground, (2) raised electricity prices in areas from where the electricity is being taken, and (3) reduced incentives to identify alternatives that decrease demand (e.g., energy conservation). With respect to the potential advantages of using HVDC over HVAC technology, studies we reviewed and stakeholders we interviewed indicated that HVDC lines generally (1) cost less than HVAC over long distances and (2) allow operators of transmission systems to have more control over the direction and the amount of power flowing over HVDC lines. Potential disadvantages of using HVDC over HVAC technology include (1) higher costs for short-distance lines due to the cost of equipment needed to convert DC into AC electricity used by residents and (2) the lack of electricity benefits to consumers living along these lines--unless converter stations are installed at intermediate locations--because such lines are generally not connected to local electricity lines.

Book Electric Power Transmission

Download or read book Electric Power Transmission written by United States. General Accounting Office and published by . This book was released on 1988 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The Future of the Grid

Download or read book The Future of the Grid written by United States. Congress. House. Committee on Energy and Commerce. Subcommittee on Energy and Environment and published by . This book was released on 2012 with total page 290 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Electricity proposals and Electric Transmission and Reliability Enhancement Act of 2003

Download or read book Electricity proposals and Electric Transmission and Reliability Enhancement Act of 2003 written by United States. Congress. Senate. Committee on Energy and Natural Resources and published by . This book was released on 2003 with total page 260 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Electrical Transmission Grid

Download or read book Electrical Transmission Grid written by United States. Congress. Senate. Committee on Energy and Natural Resources and published by . This book was released on 2008 with total page 168 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Electric Transmission Infrastructure and Investment Needs

Download or read book Electric Transmission Infrastructure and Investment Needs written by United States. Congress. Senate. Committee on Energy and Natural Resources. Subcommittee on Water and Power and published by . This book was released on 2001 with total page 64 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Siting Major Energy Facilities

Download or read book Siting Major Energy Facilities written by and published by . This book was released on 1979 with total page 308 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy Aware Facility Siting and Permitting Guide

Download or read book Energy Aware Facility Siting and Permitting Guide written by and published by . This book was released on 2011 with total page 180 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book  Socialized  is Not a Dirty Word

Download or read book Socialized is Not a Dirty Word written by Jordan Smith and published by . This book was released on 2014 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: Following the Federal government's requirement that electric utilities allow other power generators to use their transmission lines, investment in the U.S. electric grid has faltered. The effects of underinvestment in the grid has limited the proper function of competitive energy markets, and stifled investment in renewable energy sources. The Federal Energy Regulatory Commission (the “FERC”) has allowed states belonging to planning regions that coordinate transmission development to create multiple methods for allocating the costs of new facilities crossing state lines. Many of these methods use models to forecast which customers in each state benefit from the facility, and then assign costs based on those determinations. This Note argues that the fluid nature of the modern grid defies attempts to assign costs so specifically, and that instead the only cost allocation method the FERC can allow that also complies with the 16 U.S.C. § 824d(a) requirement that rate determinations be “just and reasonable” is if it requires the costs of high-voltage interstate transmission facilities to be spread among all customers in a planning region.

Book Terrorism and the Electric Power Delivery System

Download or read book Terrorism and the Electric Power Delivery System written by National Research Council and published by National Academies Press. This book was released on 2012-11-25 with total page 165 pages. Available in PDF, EPUB and Kindle. Book excerpt: The electric power delivery system that carries electricity from large central generators to customers could be severely damaged by a small number of well-informed attackers. The system is inherently vulnerable because transmission lines may span hundreds of miles, and many key facilities are unguarded. This vulnerability is exacerbated by the fact that the power grid, most of which was originally designed to meet the needs of individual vertically integrated utilities, is being used to move power between regions to support the needs of competitive markets for power generation. Primarily because of ambiguities introduced as a result of recent restricting the of the industry and cost pressures from consumers and regulators, investment to strengthen and upgrade the grid has lagged, with the result that many parts of the bulk high-voltage system are heavily stressed. Electric systems are not designed to withstand or quickly recover from damage inflicted simultaneously on multiple components. Such an attack could be carried out by knowledgeable attackers with little risk of detection or interdiction. Further well-planned and coordinated attacks by terrorists could leave the electric power system in a large region of the country at least partially disabled for a very long time. Although there are many examples of terrorist and military attacks on power systems elsewhere in the world, at the time of this study international terrorists have shown limited interest in attacking the U.S. power grid. However, that should not be a basis for complacency. Because all parts of the economy, as well as human health and welfare, depend on electricity, the results could be devastating. Terrorism and the Electric Power Delivery System focuses on measures that could make the power delivery system less vulnerable to attacks, restore power faster after an attack, and make critical services less vulnerable while the delivery of conventional electric power has been disrupted.

Book State Perspectives on Energy Facility Siting

Download or read book State Perspectives on Energy Facility Siting written by National Governors' Conference. Subcommittee on Energy Facility Siting and published by . This book was released on 1977 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Siting  Hearings     92 2  on S  1684     S  1915     S  3631     April 28  May 15  and June 1  1972

Download or read book Powerplant Siting Hearings 92 2 on S 1684 S 1915 S 3631 April 28 May 15 and June 1 1972 written by United States. Congress. Senate. Commerce and published by . This book was released on 1972 with total page 1052 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Siting

Download or read book Powerplant Siting written by United States. Congress. Senate. Committee on Commerce and published by . This book was released on 1972 with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt: