Download or read book Environmental Impact Statement for an Early Site Permit Esp at the Exelon Esp Site written by U.s. Nuclear Reglatory Commission and published by CreateSpace. This book was released on 2014-06-14 with total page 502 pages. Available in PDF, EPUB and Kindle. Book excerpt: This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Download or read book Environmental Impact Statement for an Early Site Permit Esp at the Exelon Esp Site written by U.s. Nuclear Reglatory Commission and published by CreateSpace. This book was released on 2014-06-14 with total page 498 pages. Available in PDF, EPUB and Kindle. Book excerpt: This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Download or read book Early Site Permit ESP at the Exelon ESP Site written by and published by . This book was released on 2006 with total page 504 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Early Site Permit ESP at the Grand Gulf ESP Site written by and published by . This book was released on 2006 with total page 878 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Early Site Permit ESP at the Vogtle Electric Generating Plant Site written by and published by . This book was released on 2008 with total page 642 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Combined Licences COLs for South Texas Project Electric Generating Station Units 3 and 4 written by and published by . This book was released on 2011 with total page 1196 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Combined Licenses for Virgil C Summer Nuclear Station Units 2 and 3 written by and published by . This book was released on 2011 with total page 876 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Nuclear Regulatory Commission Issuances written by U.S. Nuclear Regulatory Commission and published by . This book was released on 2008 with total page 706 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book News Releases written by and published by . This book was released on 2005 with total page 342 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Indexes to Nuclear Regulatory Commission Issuances written by and published by . This book was released on 2001 with total page 812 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Radiological Risk Assessment and Environmental Analysis written by John E. Till and published by Oxford University Press. This book was released on 2008-07-10 with total page 728 pages. Available in PDF, EPUB and Kindle. Book excerpt: Radiological Risk Assessment and Environmental Analysis comprehensively explains methods used for estimating risk to people exposed to radioactive materials released to the environment by nuclear facilities or in an emergency such as a nuclear terrorist event. This is the first book that merges the diverse disciplines necessary for estimating where radioactive materials go in the environment and the risk they present to people. It is not only essential to managers and scientists, but is also a teaching text. The chapters are arranged to guide the reader through the risk assessment process, beginning with the source term (where the radioactive material comes from) and ending with the conversion to risk. In addition to presenting mathematical models used in risk assessment, data is included so the reader can perform the calculations. Each chapter also provides examples and working problems. The book will be a critical component of the rebirth of nuclear energy now taking place, as well as an essential resource to prepare for and respond to a nuclear emergency.
Download or read book Federal Register written by and published by . This book was released on 2006-07-18 with total page 258 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Nuclear News written by and published by . This book was released on 2009 with total page 788 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Transactions of the American Nuclear Society written by American Nuclear Society and published by . This book was released on 1958 with total page 964 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Draft Environmental Impact Statement for an Early Site Permit ESP at the North Anna ESP Site written by U.s. Nuclear Reglatory Commission and published by CreateSpace. This book was released on 2014-06-14 with total page 472 pages. Available in PDF, EPUB and Kindle. Book excerpt: The staff of the U.S. Nuclear Regulatory Commission (NRC) has prepared this Supplement to the Draft Environmental Impact Statement (EIS) for an Early Site Permit (ESP) at the North Anna ESP Site (SDEIS) because Dominion Nuclear North Anna, LLC (Dominion or applicant) amended its ESP application, as described in Revision 6 to its application for an ESP. In Revision 6 (which was submitted to the NRC on April 13, 2006), Dominion described a new approach for cooling its proposed Unit 3. Under the revised approach, Unit 3 would use a closed-cycle cooling system, rather than the originally proposed once-through cooling system. The newly-proposed system would not use the 1376-ha (3400-ac) waste heat treatment facility for cooling. Dominion also proposed to increase the power level of both proposed Units 3 and 4 from 4300 megawatts-thermal (MW(t)) to 4500 MW(t).
Download or read book Boiling Water Reactor Plant written by United Engineers & Constructors, inc and published by . This book was released on 1972 with total page 218 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Early Site Permit ESP at the Vogtle Electric Generating Plant Site written by and published by . This book was released on 2008 with total page 118 pages. Available in PDF, EPUB and Kindle. Book excerpt: