EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Energy Engineering Analysis Program  Umatilla Army Depot  Oregon  Volume 1  Executive Summary

Download or read book Energy Engineering Analysis Program Umatilla Army Depot Oregon Volume 1 Executive Summary written by and published by . This book was released on 1983 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report is submitted in accordance with the Phase III requirements of Contract No. DACA05-81-C-0138 for the Energy Engineering Analysis Program for the Umatilla Depot Activity (UMDA) near Hermiston, Oregon. This study was performed in accordance with the Energy Conservation Jnvestment Program (ECIP) Guidance issued by the Department of the Army, Office of the Chief of Engineers dated revised 31 December 1982. The governing Supplemental Scope of Work was revised by the Sacramento District Corps of Engineers as of 11 June 1982, 9 July 1982, 14 January 1983 and 8 April 1983. The contract objective is to develop a systematic plan of projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Plan (dated 26 October 1981) without decreasing the readiness posture of the Army.

Book Energy Engineering Analysis Program at New Cumberland Army Depot  PA  Volume 1  Executive Summary

Download or read book Energy Engineering Analysis Program at New Cumberland Army Depot PA Volume 1 Executive Summary written by and published by . This book was released on 1984 with total page 29 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is the Corrected Final Report on Increments A through G of the Energy Engineering Analysis Program (EEAP) at New Cumberland Army Depot (NCAD). This project has been conducted under the Norfolk District, Corps of Engineers Contract No. DACA 65-8O-C-0O14, by PRC Systems Services, Cocoa Beach, FL. During Increments A and B, four modification projects were recommended for funding under the Energy Conservation Investment Program (ECIP). Increment G resulted in three recommended projects and Increment E determined the feasibility of a new, coal-fired central steam plant. Studies conducted during Increments C, D, and F concluded that none of the proposed work was economically feasible under applicable guidelines. Actual energy consumption at NCAD was determined from electricity billings and from fuel oil delivery records. Costs were taken. from contracts and service agreements that were in force at the times the various increments were undertaken. Using conversion factors specified in the Army Facilities Energy Plan and prices in effect during the year, the following summarizes the total energy picture for fiscal year (FY) 83.

Book Energy Engineering Analysis  Fort Devens  Seneca Army Depot  Letterkenny Army Depot  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Fort Devens Seneca Army Depot Letterkenny Army Depot Volume 1 Executive Summary written by and published by . This book was released on 1986 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: In February 1980, the Norfolk District Corps of Engineers initiated a contract with Reynolds, Smith and Hills of Jacksonville, Florida. This contract called for the performance of Energy Engineering Analysis Programs of three U.S. Army installations: Fort Devens, Massachusetts; LetterKenny Army Depot, Pennsylvania; and Seneca Army Depot, New York. The objective of these Programs was the identification, evaluation, and development of programming documents for energy conservation projects which meet the criteria of the Army's Energy Conservation Investment Program (ECIP).

Book Energy Engineering Analysis Program  Final Report   Increments A  B  D  F and G  U S  Army  Detroit Arsenal  Michigan  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Program Final Report Increments A B D F and G U S Army Detroit Arsenal Michigan Volume 1 Executive Summary written by and published by . This book was released on 1983 with total page 35 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Final Report summarizes all work accomplished under Increments A, B, D, F and G of the Energy Engineering Analysis Program conducted at the Detroit Arsenal (DA) in Warren, Michigan and Satellite Operations at Arsenal Acres, Pontiac Storage Facility and Keweenaw Field Station. The tasks assigned under these Increments have been completed and are documented within. The study objective was to develop a systematic plan of projects that would result in the reduction of energy consumption in compliance with the Army Facilities Energy Plan (AFEP) and to prepare Project Development Brochures (PDB's), DD Forms 1391 and supporting documentation for those projects deemed feasible. The projects developed as a result of this study are described in this report. Project Development Brochures and DD Forms 1391 have been prepared in accordance with Army procedures and are bound separately.

Book Energy Engineering Analysis Program  Final Report   Increments A  B  F and G  Volume 1   Executive Summary  U S  Army  Rocky Mountain Arsenal

Download or read book Energy Engineering Analysis Program Final Report Increments A B F and G Volume 1 Executive Summary U S Army Rocky Mountain Arsenal written by and published by . This book was released on 1983 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: The overall objectives of the EEAP are: (a) Develop a systematic plan of projects that will result in the reduction of installation energy consumption in compliance with the Army Facilities Energy Plan (AFEP). (b) Develop Coordinated Basewide Energy Systems Plans. (c) Prepare Project Development Brochures (PDBs), DD Forms 1391 and supporting documentation for all feasible energy conservation projects.

Book Energy Engineering Analysis Program  Arlington Hall Station  Virginia  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Program Arlington Hall Station Virginia Volume 1 Executive Summary written by and published by . This book was released on 1982 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: The overall purpose of this report is to provide a systematic plan of improvement projects that will reduce the energy consumption by 1985 in compliance with the Army Facilities Energy Plan (AFEP) without decreasing the present standard of living.

Book Energy Engineering Analysis Program  Fort George G  Meade  Maryland  Volume 1  Executive Summary

Download or read book Energy Engineering Analysis Program Fort George G Meade Maryland Volume 1 Executive Summary written by and published by . This book was released on 1986 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Army Energy Plan, established in early 1978, sets both short and long term energy goals for the Army consistent with the Presidential Executive Order 12003 issued in mid-1977. It directs the Major Army commands to develop detailed implementation plans and funding documents. The National Energy Conservation Policy Act (NECPA) of 1978, directs that all facilities owned and operated by a Federal Agency must have all energy conservation retrofits performed by 1 January 1990. The Department of the Army, through the Corps of Engineers Baltimore, has contracted with Ewing Cole Cherry Parsky to provide the Energy Engineering Analysis Program (EEAP) at Fort George G. Meade under contract number DACA3l-82-C-0307. The results of the study are indicated in detail in the MAIN REPORT, Volume 2B of the Report. Back-up calculations are provided in Volume 4B of the Report.

Book Energy Engineering Analysis Program  Letterkenny Army Depot  Pennsylvania  Executive Summary  Revision One

Download or read book Energy Engineering Analysis Program Letterkenny Army Depot Pennsylvania Executive Summary Revision One written by and published by . This book was released on 1983 with total page 36 pages. Available in PDF, EPUB and Kindle. Book excerpt: The objective of these Programs was the identification, evaluation, and development of programming documents for energy conservation projects which meet the criteria of the Army's Energy Conservation Investment Program (ECIP).

Book Energy Engineering Analysis Program  Eighth US Army  Korea  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Program Eighth US Army Korea Volume 1 Executive Summary written by and published by . This book was released on 1981 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: Executive Order 12003, dated 19 July 1977, set forth national goals in energy conservation and provided specific guidance to Federal agencies for reduction of energy consumption. The Army Energy Plan, published in February 1978, similarly set up goals for the Army. Succeeding publications and procedures established specific programs and the Energy Engineering Analysis Program (EEAP) evolved as the vehicle for generating documentation for energy conserving construction projects. In parallel, the Congress has authorized funds for such projects under the Energy Conservation Investment Program (ECIP).

Book Energy Engineering Analysis Program  EEAP  and Modernization Program Central Boiler Plant  Increment E Mod    Longhorn Army Ammunition Plant  Texes  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Program EEAP and Modernization Program Central Boiler Plant Increment E Mod Longhorn Army Ammunition Plant Texes Volume 1 Executive Summary written by and published by . This book was released on 1984 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to provide the Army with data of conservation projects associated with the investigation of facilities; to analyze present fuel consumption records; and to developed an orderly procedure for reducing energy consumption consistent with Army Facilities Energy Plan (AFEP), dated 26 October, 1981.

Book Energy Engineering Analysis Program  Increments A  B  F and G  U S  Army Rock Island Arsenal  Illinois  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Program Increments A B F and G U S Army Rock Island Arsenal Illinois Volume 1 Executive Summary written by and published by . This book was released on 1983 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt: Objectives and Scope As stated in the EEAP Scope of Work the overall objectives were: a) "Develop a systematic plan of projects that will result in the reduction of installation energy consumption in compliance with the Army Facilities Energy Plan." b) "Develop Coordinated Basewide Energy System Plans." c) "Prepare Project Development Brochures (PDBs), DD Forms 1391 and supporting documentation for all feasible energy conservation projects." The Scope of Work further defined the objectives and scope of each work increment to be as follows: Increment A - ECIP ̂Projects for Buildings and Processes Increment B - ECIP Projects for Utilities, Energy Distribution Systems and Energy Monitoring and Control Systems (EMCS) Increment C - Renewable Energy Systems Projects Increment D - Cogeneration and Solid Waste Plants Projects Increment E - Central Boiler Plant Projects Increment F - Facilities Engineer Conservation Measures Increment G - Projects Identified in Increments A and B that do not qualify under ECIP criteria This submittal presents the final results for Increments A, B, F and G through a description of those energy conservation opportunities (ECOs) and ECIP projects that were identified and evaluated as part of these work increments. Increments C, D and E have not been authorized at this time for Rock Island Arsenal.

Book Energy Engineering Analysis Program  Seneca Army Depot  New York  Executive Summary  Revision One

Download or read book Energy Engineering Analysis Program Seneca Army Depot New York Executive Summary Revision One written by and published by . This book was released on 1983 with total page 33 pages. Available in PDF, EPUB and Kindle. Book excerpt: This contract called for the performance of Energy Engineering Analysis Programs of three U.S. Army installations: Fort Devens, Massachusetts; Letterkenny Army Depot, Pennsylvania; and Seneca Army Depot, New York. The objective of these Programs was the identification, evaluation, and development of programming documents for energy conservation projects which meet the criteria of the Army's Energy Conservation Investment Program (ECIP). At Seneca Army Depot (SEAD) the initial work under this contract called for the following studies: (1) Increment A, Energy Conservation Investigations for Buildings and Processes; (2) Increment B, Energy Conservation Investigations for Utilities and Energy Distribution Systems.

Book Energy Engineering Analysis Program at Watervliet Arsenal  NY  Volume 1  Executive Summary

Download or read book Energy Engineering Analysis Program at Watervliet Arsenal NY Volume 1 Executive Summary written by and published by . This book was released on 1984 with total page 26 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is the Corrected Final Report on Increments A, B, C, D, E, and G of the Energy Engineering Analysis Program (EEAP) at Watervliet Arsenal (WVLT). This project has been conducted under the Norfolk District, Corps of Engineers Contract No. DACA 65-80-C-00l4, by PRC Systems Services, Cocoa Beach, FL. During Increments A and B, five modification projects were recommended for funding under the Energy Conservation Investment Program (ECIP). Increment G resulted in three recommended projects and Increment E determined the feasibility of a new, coal fired central steam plant. Studies conducted during Increments C and D concluded that none of the proposed work was economically feasible under applicable guidelines.

Book Energy Survey of Army Industrial Facilities  Energy Engineering Analysis Program  Letterkenny Army Depot  Chambersburg  Pennsylvania  Executive Summary

Download or read book Energy Survey of Army Industrial Facilities Energy Engineering Analysis Program Letterkenny Army Depot Chambersburg Pennsylvania Executive Summary written by and published by . This book was released on 1992 with total page 26 pages. Available in PDF, EPUB and Kindle. Book excerpt: The report consists of an Executive Summary and four volumes. Volume I, the Narrative Report, contains the results of all of the site surveys, analysis and project development. All backup data and calculations are found in Volume II. The site survey notes are in Volume III.

Book Energy Engineering Analysis Program  MC Alester Army Ammunition Plant  Volume 1   Executive Summary

Download or read book Energy Engineering Analysis Program MC Alester Army Ammunition Plant Volume 1 Executive Summary written by and published by . This book was released on 1984 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: The EEAP study at McAlester will result in a comprehensive basewide energy plan. The plan will describe modifications to maximize efficiency of the existing installation and recommend investment opportunities to further reduce energy use. The plan will be developed to reduce energy consumption in compliance with the objective set forth in the Army Facilities Energy Plan. All practical methods of energy conservation will be evaluated for economic feasibility.