EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book                                                                         70 638

    Book Details:
  • Author :
  • Publisher :
  • Release : 1999
  • ISBN :
  • Pages : pages

Download or read book 70 638 written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 14??
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 14?? with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft Remedial Investigation

Download or read book Draft Remedial Investigation written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Phase I and II Feasibility Study Report for the 300 FF 5 Operable Unit

Download or read book Phase I and II Feasibility Study Report for the 300 FF 5 Operable Unit written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

Book FEASIBILITY STUDY REPORT FOR THE 200 ZP 1 GROUNDWATER OPERABLE UNIT

Download or read book FEASIBILITY STUDY REPORT FOR THE 200 ZP 1 GROUNDWATER OPERABLE UNIT written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km2 (586 mi2) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

Book Basewide Groundwater Operable Unit  Groundwater Operable Unit Remedial Investigation Feasibility Study Report

Download or read book Basewide Groundwater Operable Unit Groundwater Operable Unit Remedial Investigation Feasibility Study Report written by and published by . This book was released on 1994 with total page 729 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document presents the Remedial Investigation/Feasibility Study (RI/FS) for the Groundwater Operable Unit (GW OU) at McClellan Air Force Base (McClellan AFB). The RI/FS is one step in the GW OU, which is intended to develop an interim remedial action for groundwater contamination at McClellan AFB. The preferred interim remedial action for the GW OU is containment of the 0.000006 risk target volume, treatment using air stripping with vapor phase carbon and LGAC polishing on the east side, the existing GWTP on the west side, and injection of the treated water.

Book Feasibility Study Report

Download or read book Feasibility Study Report written by United States. Environmental Protection Agency. Region IX. and published by . This book was released on 1996 with total page 18 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book 100 BC 5 Operable Unit Focused Feasibility Study Report  Draft A

Download or read book 100 BC 5 Operable Unit Focused Feasibility Study Report Draft A written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Mather Air Force Base  California

Download or read book Mather Air Force Base California written by Air Force Center for Environmental Excellence (U.S.) and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Preliminary Response to Agency Comments  February 2005 Final Perimeter Groundwater Operable Unit Remedial Investigation Feasibility Study

Download or read book Preliminary Response to Agency Comments February 2005 Final Perimeter Groundwater Operable Unit Remedial Investigation Feasibility Study written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book South Fresno Regional Groundwater Plume

Download or read book South Fresno Regional Groundwater Plume written by Geomatrix Consultants and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Basewide Groundwater Operable Unit  Groundwater Operable Unit Remedial Investigation Feasibility Study Report

Download or read book Basewide Groundwater Operable Unit Groundwater Operable Unit Remedial Investigation Feasibility Study Report written by and published by . This book was released on 1994 with total page 713 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report has been prepared for the Air Force by CH2M HILL for the purpose of aiding in the implementation of a final remedial action plan under the Air Force Installation Restoration Program (IRP). Because the report relates to actual or possible releases of potentially hazardous substances, its release prior to an Air Force final decision on remedial action may be in the public's interest. The limited objectives of this report and the ongoing nature of the IRP, along with the evolving knowledge of site conditions and chemical effects on the environment and health, must be considered when evaluating this report, since subsequent facts may become known that may make this report premature or inaccurate.