EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Description of Work for the Installation of a 100 D Area Extraction Well as Part of 100 HR 3 Pump and treat Remediation System

Download or read book Description of Work for the Installation of a 100 D Area Extraction Well as Part of 100 HR 3 Pump and treat Remediation System written by C. A. Sump and published by . This book was released on 2002 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Description of Work for the Installation of 3 Groundwater Wells at the 100 KR 4 and 200 ZP 1 Pump and Treat Remediation System FY2003 Cercla Drilling

Download or read book Description of Work for the Installation of 3 Groundwater Wells at the 100 KR 4 and 200 ZP 1 Pump and Treat Remediation System FY2003 Cercla Drilling written by and published by . This book was released on 2002 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: This description of work (DOW) documents the requirements for three wells to be drilled and constructed in fiscal year 2003 as part of the 100 KR-4 and 200-ZP-1 groundwater Pump-and-Treat Remediation Facilities on the Hanford Site. Installation of these wells is to replace two existing extraction wells in the 100-KR-4 and 200-ZP-1 Pump-and Treat Systems, and the installation of one new monitoring well at 100-KR-4. Process design upgrades to the 100-K pump and treat system will not be covered in this document. A site plan view map of the 100-KR-4 Pump and Treat Facility is presented in Figure 8-1. A site map of the new well location at the 200-ZP-1 Pump and Treat Facility is in Figure 8-2. The proposed 100-KR-4 extraction well (C4117) will be located 4.6 meters (15 feet) southeast of existing extraction well 199-K-112A. The new monitoring well (C4120) will be approximately 300 meters (980 feet) northeast of 199-K-112A (Figure 8-1). The proposed 200-ZP-1 extraction well (C4119) will be located near extraction well 299-W15-33 (Figure 8-2). Construction parameters for the three wells will be based on existing wells and on geologic conditions encountered during drilling, and discussed in detail in Section 3.0. The 100-KR-4 Operable Unit contains numerous culturally sensitive areas. Because of these areas, access will be severely limited and off-road travel forbidden.

Book Radioactive Waste Management

Download or read book Radioactive Waste Management written by and published by . This book was released on 1996 with total page 430 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Well Summary Report

    Book Details:
  • Author : C. A. Sump
  • Publisher :
  • Release : 2002
  • ISBN :
  • Pages : pages

Download or read book Well Summary Report written by C. A. Sump and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995 with total page 718 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Description of Work for the Installation of One Well at the 100 KW Pump and Treat System for the 100 KR 4 Groundwater Operable Unit  FY 2007

Download or read book Description of Work for the Installation of One Well at the 100 KW Pump and Treat System for the 100 KR 4 Groundwater Operable Unit FY 2007 written by Scott H. Worley and published by . This book was released on 2007 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Bioaugmentation for Groundwater Remediation

Download or read book Bioaugmentation for Groundwater Remediation written by Hans F. Stroo and published by Springer Science & Business Media. This book was released on 2012-10-02 with total page 421 pages. Available in PDF, EPUB and Kindle. Book excerpt: ​This volume provides a review of the past 10 to 15 years of intensive research, development and demonstrations that have been on the forefront of developing bioaugmentation into a viable remedial technology. This volume provides both a primer on the basic microbial processes involved in bioaugmentation, as well as a thorough summary of the methodology for implementing the technology. This reference volume will serve as a valuable resource for environmental remediation professionals who seek to understand, evaluate, and implement bioaugmentation.

Book Systematic Method for Evaluating Extraction and Injection Flow Rates for 100 KR 4 and 100 HR 3 Groundwater Operable Unit Pump and Treat Interim Actions for Hydraulic Containment

Download or read book Systematic Method for Evaluating Extraction and Injection Flow Rates for 100 KR 4 and 100 HR 3 Groundwater Operable Unit Pump and Treat Interim Actions for Hydraulic Containment written by and published by . This book was released on 2013 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P & T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P & T interim actions to develop hydraulic contairnnent of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

Book Description of Work for the Installation of Wells in the 600 Area Between 100 D and 100 H for the 100 HR 3 Groundwater Operable Unit  FY 2007 and FY 2008

Download or read book Description of Work for the Installation of Wells in the 600 Area Between 100 D and 100 H for the 100 HR 3 Groundwater Operable Unit FY 2007 and FY 2008 written by David C. Weekes and published by . This book was released on 2007 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Description of Work for the Installation of Four Wells at the 100 KW Pump and Treat System for the 100 KR 4 Groundwater Operable Unit  FY 2006

Download or read book Description of Work for the Installation of Four Wells at the 100 KW Pump and Treat System for the 100 KR 4 Groundwater Operable Unit FY 2006 written by John Campbell Houck and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Groundwater and Soil Cleanup

    Book Details:
  • Author : National Research Council
  • Publisher : National Academies Press
  • Release : 1999-11-21
  • ISBN : 0309065496
  • Pages : 301 pages

Download or read book Groundwater and Soil Cleanup written by National Research Council and published by National Academies Press. This book was released on 1999-11-21 with total page 301 pages. Available in PDF, EPUB and Kindle. Book excerpt: This book presents a comprehensive, up-to-date review of technologies for cleaning up contaminants in groundwater and soil. It provides a special focus on three classes of contaminants that have proven very difficult to treat once released to the subsurface: metals, radionuclides, and dense nonaqueous-phase liquids such as chlorinated solvents. Groundwater and Soil Cleanup was commissioned by the Department of Energy (DOE) as part of its program to clean up contamination in the nuclear weapons production complex. In addition to a review of remediation technologies, the book describes new trends in regulation of contaminated sites and assesses DOE's program for developing new subsurface cleanup technologies.

Book Large Scale Pumping Test Recommendations for the 200 ZP 1 Operable Unit

Download or read book Large Scale Pumping Test Recommendations for the 200 ZP 1 Operable Unit written by and published by . This book was released on 2010 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

Book Engineering and Design

Download or read book Engineering and Design written by Us Army Corps Of Engineers and published by Military Bookshop. This book was released on 2002-06-01 with total page 434 pages. Available in PDF, EPUB and Kindle. Book excerpt: This manual provides practical guidance for the design and operation of soil vapor extraction (SVE) and bioventing (BV) systems. It is intended for use by engineers, geologists, hydrogeologists, and soil scientists, chemists, project managers, and others who possess a technical education and some design experience but only the broadest familiarity with SVE or BV systems.