EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Decontamination and Decommissioning of the 60 inch Cyclotron Facility at Argonne National Laboratory East Project Final Report

Download or read book Decontamination and Decommissioning of the 60 inch Cyclotron Facility at Argonne National Laboratory East Project Final Report written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This final report of the decontamination and decommissioning (D & D) of the Argonne National Laboratory-East (ANL-E) 60'' Cyclotron Accelerator Facility contains descriptions and evaluations of activities performed, and results obtained in connection with the Cyclotron D & D Project. It provides the following information: Objective of the Cyclotron D & D Project; A brief history of the Cyclotron facility; Overall descriptions of the Cyclotron facility and the ANL-E site; An overview of the D & D activities performed in connection with the Cyclotron D & D Project; Summary of the final status of the Cyclotron facility, including results of the final and confirmation surveys; Final cost and schedule for the Cyclotron D & D Project; Summaries of personnel exposure and total waste generated in connection with this project; and Final facility condition. This project final report was written in accordance with the requirements of the ANL-E D & D Project Planning Guidance Manual and the ANL-E D & D Program Management Plan. It covers the entire Cyclotron D & D Project, from the initiation of D & D activities to final project closeout. At the conclusion of the Independent Verification Survey (IVS), the Cyclotron facility was released for unrestricted reuse. Residual, elevated activity remains in inaccessible areas, however. The upper floor of the Cyclotron vault contains readily measurable radioactivity from neutron activation of the concrete and other structures resulting from Cyclotron operations. In accessible areas, the exposure rate criteria in DOE Order 5400.5, i.e.,

Book Energy and Water Development Appropriations for 2001

Download or read book Energy and Water Development Appropriations for 2001 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2000 with total page 3154 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Decontamination and Decommissioning of the Argonne Thermal Source Reactor at Argonne National Laboratory   East Project Final Report

Download or read book Decontamination and Decommissioning of the Argonne Thermal Source Reactor at Argonne National Laboratory East Project Final Report written by and published by . This book was released on 1998 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The ATSR D & D Project was directed toward the following goals: (1) Removal of radioactive and hazardous materials associated with the ATSR Reactor facility; (2) Decontamination of the ATSR Reactor facility to unrestricted use levels; and (3)Documentation of all project activities affecting quality (i.e., waste packaging, instrument calibration, audit results, and personnel exposure). These goals had been set in order to eliminate the radiological and hazardous safety concerns inherent in the ATSR Reactor facility and to allow, upon completion of the project, unescorted and unmonitored access to the area. The reactor aluminum, reactor lead, graphite piles in room E-111, and the contaminated concrete in room E-102 were the primary areas of concern. NES, Incorporated (Danbury, CT) characterized the ATSR Reactor facility from January to March 1998. The characterization identified a total of thirteen radionuclides, with a total activity of 64.84 mCi (2.4 GBq). The primary radionuclides of concern were Co6°, Eu152, Cs137, and U238. No additional radionuclides were identified during the D & D of the facility. The highest dose rates observed during the project were associated with the reactor tank and shield tank. Contact radiation levels of 30 mrem/hr (0.3 mSv/hr) were measured on reactor internals during dismantlement of the reactor. A level of 3 mrem/hr (0.03 mSv/hr) was observed in a small area (hot spot) in room E-102. DOE Order 5480.2A establishes the maximum whole body exposure for occupational workers at 5 rem/yr (50 mSv/yr); the administrative limit at ANL-E is 1 rem/yr (10 mSv/yr).

Book Energy and Water Development Appropriations for 2001  Department of Energy fiscal year 2001 budget justifications

Download or read book Energy and Water Development Appropriations for 2001 Department of Energy fiscal year 2001 budget justifications written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2000 with total page 3160 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book 107 1 Hearings  Energy and Water Development Appropriations for 2002  Part 4  2001

Download or read book 107 1 Hearings Energy and Water Development Appropriations for 2002 Part 4 2001 written by and published by . This book was released on 2001 with total page 1476 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Decontamination and Decommissioning Activities Photobriefing Book FY 2000

Download or read book Decontamination and Decommissioning Activities Photobriefing Book FY 2000 written by and published by . This book was released on 2001 with total page 5 pages. Available in PDF, EPUB and Kindle. Book excerpt: A major milestone was reached in Fiscal Year (FY) 2000--the completion of the Chicago Pile-5 (CP-5) D and D Project. CP-5, the first reactor built on the Argonne National Laboratory-East (ANL-E) site, was a 5-megawatt, heavy water-moderated, enriched uranium-fueled reactor. It was the principal reactor on the Argonne site used to produce neutrons for scientific research from 1954 to 1979. The reactor was shut down and defueled in 1979, and placed in a lay-up condition. In 1990, funding was provided to begin the decontamination and decommissioning (D and D) of this facility, and work began in June 1991. D and D tasks were performed by both ANL-E personnel and subcontractor personnel from Duke Engineering and Services, Marlborough MA, under the management of ANL-E D and D Program personnel. In July 2000, the final project report was presented to the Department of Energy, and the facility was formally decommissioned and transferred to the landlord. Total project duration was 97 months, and total project cost was $29.5M. Also, in FY 2000, work began on the 60 Cyclotron D and D Project. An accelerator used for basic research, this facility produced beams of deuterons, helium ions, singly charged hydrogen molecules, and neutrons of a broad energy spectrum. This machine was built in 1952; operations ended in 1992. Late in FY 1999, MOTA Corporation, Columbia SC, was selected as subcontractor. MOTA used a custom-built 76-inch reciprocating saw manufactured by Reverse Engineering, Columbia SC, to cut the cyclotron's 220-ton steel yoke into blocks that were approximately 17,000 pounds each. This project is scheduled to be completed in March 2001. In addition to a photographic chronology of FY 2000 activities at the CP-5 D and D Project and the 60 Cyclotron D and D Project, brief descriptions of other FY 2000 activities and of projects planned for the future are provided in this photobriefing book.

Book Energy and Water Development Appropriations for 2002

Download or read book Energy and Water Development Appropriations for 2002 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2001 with total page 1520 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2003

Download or read book Energy and Water Development Appropriations for 2003 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2002 with total page 1440 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2002  Department of Energy fiscal year 2002 budget justifications

Download or read book Energy and Water Development Appropriations for 2002 Department of Energy fiscal year 2002 budget justifications written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2001 with total page 3046 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Decontamination and Decommissioning of the Experimental Boiling Water Reactor  EBWR

Download or read book Decontamination and Decommissioning of the Experimental Boiling Water Reactor EBWR written by and published by . This book was released on 1997 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Final Report for the Decontamination and Decommissioning (D & D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D & D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D & D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D & D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a {open_quotes}Radiologically Controlled Area, {close_quotes} noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion).

Book Decontamination and Decommissioning of the Argonne National Laboratory East Area Radioactively Contaminated Surplus Facilities

Download or read book Decontamination and Decommissioning of the Argonne National Laboratory East Area Radioactively Contaminated Surplus Facilities written by W. H. Kline and published by . This book was released on 1987 with total page 127 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Technical Reports Series

Download or read book Technical Reports Series written by and published by . This book was released on 2003 with total page 200 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2003  Department of Energy     National Nuclear Security Administration     Power Marketing Administrations

Download or read book Energy and Water Development Appropriations for 2003 Department of Energy National Nuclear Security Administration Power Marketing Administrations written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2002 with total page 2986 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Decommissioning of Small Medical  Industrial and Research Facilities

Download or read book Decommissioning of Small Medical Industrial and Research Facilities written by International Atomic Energy Agency and published by IAEA. This book was released on 2003 with total page 212 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report proves information, experience and assistance on the decommissioning of small medical, industrial and research nuclear facilities in which radioactive material and radiation sources are produced, received, used and/or stored. It is intended to promote timely and cost effective decommissioning and waste management at the end of the life of a small facility so as to render such a facility harmless.

Book Decontamination and Dismantlement of the Building 594 Waste Ion Exchange Facility at Argonne National Laboratory East Project Final Report

Download or read book Decontamination and Dismantlement of the Building 594 Waste Ion Exchange Facility at Argonne National Laboratory East Project Final Report written by and published by . This book was released on 1998 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Building 594 D & D Project was directed toward the following goals: Removal of any radioactive and hazardous materials associated with the Waste Ion Exchange Facility; Decontamination of the Waste Ion Exchange Facility to unrestricted use levels; Demolition of Building 594; and Documentation of all project activities affecting quality (i.e., waste packaging, instrument calibration, audit results, and personnel exposure) These goals had been set in order to eliminate the radiological and hazardous safety concerns inherent in the Waste Ion Exchange Facility and to allow, upon completion of the project, unescorted and unmonitored access to the area. The ion exchange system and the resin contained in the system were the primary areas of concern, while the condition of the building which housed the system was of secondary concern. ANL-E health physics technicians characterized the Building 594 Waste Ion Exchange Facility in September 1996. The characterization identified a total of three radionuclides present in the Waste Ion Exchange Facility with a total activity of less than 5 [mu]Ci (175 kBq). The radionuclides of concern were Co6°, Cs137, and Am241. The highest dose rates observed during the project were associated with the resin in the exchange vessels. DOE Order 5480.2A establishes the maximum whole body exposure for occupational workers at 5 rem (50 mSv)/yr; the administrative limit at ANL-E is 1 rem/yr (10 mSv/yr).