EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Closure Report for Corrective Action Unit 135

Download or read book Closure Report for Corrective Action Unit 135 written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Corrective Action Unit (CAU) 135, Area 25 Underground Storage Tanks, was closed in accordance with the approved Corrective Action Plan (DOE/NV, 2000). CAU 135 consists of three Corrective Action Sites (CAS). Two of these CAS's were identified in the Corrective Action Investigation Data Quality Objective meeting as being improperly identified as underground storage tanks. CAS 25-02-03 identified as the Deluge Valve Pit was actually an underground electrical vault and CAS 25-02-10 identified as an Underground Storage Tank was actually a former above ground storage tank filled with demineralized water. Both of these CAS's are recommended for a no further action closure. CAS 25-02-01 the Underground Storage Tanks commonly referred to as the Engine Maintenance Assembly and Disassembly Waste Holdup Tanks and Vault was closed by decontaminating the vault structure and conducting a radiological verification survey to document compliance with the Nevada Test Site unrestricted use release criteria. The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine Maintenance, Assembly, and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive and cell service area drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999, discussed in ''The Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada'' (DOE/NV, 199a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples exceeded the preliminary action levels for polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. The CAU 135 closure activities consisted of scabbling radiological ''hot spots'' from the concrete vault, and the drilling removal of the cement-lined vault sump. Field activities began on November 28, 2000, and ended on December 4, 2000. After verification samples were collected, the vault was repaired with cement. The concrete vault sump, soil excavated beneath the sump, and compactable hot line trash were disposed at the Area 23 Sanitary Landfill. The vault interior was field surveyed following the removal of waste to verify that unrestricted release criteria had been achieved. Since the site is closed by unrestricted release decontamination and verification, post-closure care is not required.

Book 107 1 Hearings  Energy and Water Development Appropriations for 2002  Part 4  2001

Download or read book 107 1 Hearings Energy and Water Development Appropriations for 2002 Part 4 2001 written by and published by . This book was released on 2001 with total page 1476 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2001

Download or read book Energy and Water Development Appropriations for 2001 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2000 with total page 3154 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2001  Department of Energy fiscal year 2001 budget justifications

Download or read book Energy and Water Development Appropriations for 2001 Department of Energy fiscal year 2001 budget justifications written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2000 with total page 3160 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2002  Department of Energy fiscal year 2002 budget justifications

Download or read book Energy and Water Development Appropriations for 2002 Department of Energy fiscal year 2002 budget justifications written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2001 with total page 3046 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2002

Download or read book Energy and Water Development Appropriations for 2002 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2001 with total page 1522 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2003

Download or read book Energy and Water Development Appropriations for 2003 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2002 with total page 2974 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 2003  Department of Energy     National Nuclear Security Administration     Power Marketing Administrations

Download or read book Energy and Water Development Appropriations for 2003 Department of Energy National Nuclear Security Administration Power Marketing Administrations written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 2002 with total page 2986 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Corrective Action Decision Document for Corrective Action Unit 135

Download or read book Corrective Action Decision Document for Corrective Action Unit 135 written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This corrective action decision document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 135, Area 25 Underground Storage Tanks, under the Federal Facility Agreement and Consent Order. Located on the Nevada Test Site (NTS), CAU 135 consists of three Corrective Action Sites (CASs): 25-02-01, Underground Storage Tanks, referred to as the Engine, Maintenance, Assembly, and Disassembly Waste Holdup Tanks and Vault; 25-02-03, Underground Electrical Vault, referred to as the Deluge Valve Pit at the Test Cell A Facility; and 25-02-10, Underground Storage Tank, referred to as the former location of an aboveground storage tank for demineralized water at the Test Cell A Facility. Two of these CASs (25-02-03 and 25-02-10) were originally considered as underground storage tanks, but were found to be misidentified. Further, radio logical surveys conducted by Bechtel Nevada in January 1999 found no radiological contamination detected above background levels for these two sites; therefore, the closure report for CAU 135 will recommend no further action at these two sites. A corrective action investigation for the one remaining CAS (25-02-01) was conducted in June 1999, and analytes detected during this investigation were evaluated against preliminary action levels. It was determined that contaminants of potential concern included polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Two corrective action objectives were identified for this CAS (i.e., prevention and mitigation of human exposure to sediments and surrounding areas), and subsequently two CAAs developed for consideration based on a review of existing data, future use, and current operations at the NTS. These CAAs were: Alternative 1 - No Further Action, and Alternative 2 - Unrestricted Release Decontamination and Verification Survey. Alternative 2 was chosen as the preferred CAA, after evaluation of technical merit which focused on performance, reliability, feasibility, and safety. This alternative was judged to meet all applicable state and federal regulations for closure of the site and reduces the potential future exposure pathways to the contaminated surfaces at this site.

Book RCRA

    Book Details:
  • Author : John W. Teets
  • Publisher : American Bar Association
  • Release : 2003
  • ISBN : 9781590311554
  • Pages : 202 pages

Download or read book RCRA written by John W. Teets and published by American Bar Association. This book was released on 2003 with total page 202 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is the seventh book in a series that concentrates on basic information for the environmental law practitioner. It looks at the Resource Conservation and Recovery Act.

Book Rcra Regulations   Keyword Index 2015

Download or read book Rcra Regulations Keyword Index 2015 written by John F. Buckley, IV and published by Wolters Kluwer. This book was released on 2015-01-01 with total page 2076 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Attestation Engagements 2017

Download or read book Attestation Engagements 2017 written by AICPA and published by John Wiley & Sons. This book was released on 2017-05 with total page 768 pages. Available in PDF, EPUB and Kindle. Book excerpt: Redrafted in accordance with the clarity drafting conventions (and differentiated from the extant standards by using the identifier "AT-C"), the attestation standards have been made easier to read, understand, and apply by establishing objectives and definitions in each AT-C section, and separating requirements from application and other explanatory material. Some of the changes introduced by SSAE No. 18 include (among other changes): Separation of procedural and reporting requirements for review engagements from their counterparts for examination engagements Required representation letters More robust risk assessment for examination engagements SSAE No. 18 supersedes all the extant attestation standards with the following exceptions: AT 501, An Examination of an Entity's Internal Control Over Financial Reporting That is Integrated With An Audit of Financial Statements AT 701, Management's Discussion and Analysis.

Book United States Standard Flight Inspection Manual

Download or read book United States Standard Flight Inspection Manual written by and published by . This book was released on 1976 with total page 260 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book 7 Fundamentals of an Operationally Excellent Management System

Download or read book 7 Fundamentals of an Operationally Excellent Management System written by Chitram Lutchman and published by CRC Press. This book was released on 2015-01-22 with total page 444 pages. Available in PDF, EPUB and Kindle. Book excerpt: Developing and maintaining a disciplined management system provides any organization with a blueprint for exceptional performance and success. Indeed, for larger multinational corporations, a management system is a critical component for sustainable growth and performance management. In this book, the authors discuss a series of fundamentals for cr

Book Operations Excellence Management System  OEMS

Download or read book Operations Excellence Management System OEMS written by Chitram Lutchman and published by CRC Press. This book was released on 2019-09-17 with total page 183 pages. Available in PDF, EPUB and Kindle. Book excerpt: Written for users, this book provides a structured approach with processes for implementing OEMS based on the learnings and experiences from companies who have implemented OEMS. The book leverages the knowledge of experienced OEMS personnel to provide a compelling sense of direction for organizations in the implementation of OEMS. The book includes sample templates and tools where necessary to ensure successful implementation and sustainment. The content of this book provides a testing methodology for implementing an OEMS across any organization while avoiding the pitfalls others have encountered along the way. The book: Provides a simple and easy process to follow for implementing an OEMS Offers organizations an opportunity to avoid the implementation errors of early adopters and provides them with the ability of learning from the experiences of others Equipped with tools and processes to make implementation and sustainment very effective, thereby avoiding false starts Designed to improve HSE, business reliability, efficiency, effectiveness, and performance on an ongoing basis Presents a simple pathway for helping organizations across all industries including those that operate within the various segments of the Oil and Gas business, to become more operationally disciplined in the way we do business and operate our assets in a high-risk operating environment