EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Work Plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Work Plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1996 with total page 174 pages. Available in PDF, EPUB and Kindle. Book excerpt: The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

Book Final Deactivation Project Report on the Integrated Process Demonstration Facility  Building 7602 Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Project Report on the Integrated Process Demonstration Facility Building 7602 Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S & M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed.

Book Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

Download or read book Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory written by and published by . This book was released on 1995 with total page 186 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S & M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S & M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S & M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

Book Final Deactivation Project Report on the High Radiation Level Analytical Facility  Building 3019B at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Project Report on the High Radiation Level Analytical Facility Building 3019B at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of the High Radiation Level Analytical Facility (Building 3019B) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities. This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the Environmental Restoration EM-40 Program. This document provides a history and description of the facility prior to the commencement of deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S & M) Plan, remaining hazardous materials inventory, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the Nuclear Material and Facility Stabilization (EM-60) Turnover package are discussed. Building 3019B will require access to perform required S & M activities to maintain the building safety envelope. Building 3019B was stabilized during deactivation so that when transferred to the EM-40 Program, only a minimal S & M effort would be required to maintain the building safety envelope. Other than the minimal S & M activities the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S & M until decommissioning activities begin.

Book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

Download or read book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory written by and published by . This book was released on 1995 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S & M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S & M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project.

Book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1996 with total page 33 pages. Available in PDF, EPUB and Kindle. Book excerpt: Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project.

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 2001
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The Office of Environmental Management Technical Reports  A Bibliography

Download or read book The Office of Environmental Management Technical Reports A Bibliography written by and published by DIANE Publishing. This book was released on 2001 with total page 245 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Office of Environmental Management's (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1994 through June 30, 1995. This information is divided into the following categories: Focus Areas, Cross-Cutting Programs, and Support Programs. In addition, a category for general information is included. EM's Office of Science and Technology sponsors this bibliography.

Book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Environmental Restoration Program

Download or read book Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Environmental Restoration Program written by and published by . This book was released on 1995 with total page 31 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S & M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S & M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project.

Book Energy and Water Development Appropriations for 1996  Department of Energy fiscal year 1996 budget justifications

Download or read book Energy and Water Development Appropriations for 1996 Department of Energy fiscal year 1996 budget justifications written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 1995 with total page 2690 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Energy and Water Development Appropriations for 1996

Download or read book Energy and Water Development Appropriations for 1996 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development and published by . This book was released on 1995 with total page 2698 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Lifecycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Lifecycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1995 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt: The scope of this Activity Data Sheet (ADS) is to provide a detailed plan for the Isotopes Facilities Deactivation Project (IFDP) at the Oak Ridge National Laboratory (ORNL). This project places the former isotopes production facilities in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S & M) until the facilities are included in the Decontamination and Decommissioning (D & D) Program. The facilities included within this deactivation project are Buildings 3026-C, 3026-D, 3028, 3029, 3038-AHF, 3038-E, 3038-M, 3047, 3517, 7025, and the Center Circle Facilities (Buildings 3030, 3031, 3032, 3033, 3033-A, 3034, and 3118). The scope of deactivation identified in this Baseline Report include surveillance and maintenance activities for each facility, engineering, contamination control and structural stabilization of each facility, radioluminescent (RL) light removal in Building 3026, re-roofing Buildings 3030, 3118, and 3031, Hot Cells Cleanup in Buildings 3047 and 3517, Yttrium (Y) Cell and Barricades Cleanup in Building 3038, Glove Boxes & Hoods Removal in Buildings 3038 and 3047, and Inventory Transfer in Building 3517. For a detailed description of activities within this Work Breakdown Structure (WBS) element, see the Level 6 and Level 7 Element Definitions in Section 3.2 of this report.

Book Final Deactivation Project Report on the Source Development Laboratory  Building 3029  Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Final Deactivation Project Report on the Source Development Laboratory Building 3029 Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 1997 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this report is to document the condition of Building 3029 after completion of deactivation activities as outlined by the DOE Nuclear Materials and Facility Stabilization Program (EM-60) guidance documentation. This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration (EM-40). This report provides a history and profile of the facility prior to commencing deactivation activities and a profile of the building after completion of deactivation activities. Turnover items, such as the post-deactivation surveillance and maintenance (S & M) plan, remaining hazardous materials, radiological controls, safeguards and security, quality assurance, facility operations, and supporting documentation provided in the EM-60 turnover package are discussed. Building 3029 will require access to facilitate required S & M activities to maintain the building safety envelope. building 3029 was stabilized during deactivation so that when transferred to the EM-40 program, only a minimal S & M effort would be required to maintain the building safety envelope. Other than the minimal S & M activities, the building will be unoccupied and the exterior doors locked to prevent unauthorized access. The building will be entered only to perform the required S & M. 5 refs., 7 figs., 3 tabs.

Book Life Cycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  Oak Ridge  Tennessee

Download or read book Life Cycle Baseline Summary for ADS 6504IS Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory Oak Ridge Tennessee written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Isotopes Facility Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S & M) and as quickly and economically as possible. This baseline plan establishes the official target schedule for completing the deactivation work and the associated budget required for deactivation and the necessary S & M. Deactivation of the facilities 3026C, 3026D, 3028, 3029, 3038E, 3038M, and 3038AHF, the Center Circle buildings 3047, 3517, and 7025 will continue though Fiscal Year (FY) 1999. The focus of the project in the early years will be on the smaller buildings that require less deactivation and can bring an early return in reducing S & M costs. This baseline plan covers the period from FY1995 throughout FY2000. Deactivation will continue in various facilities through FY1999. A final year of S & M will conclude the project in FY2000. The estimated total cost of the project during this period is$51M.

Book Bericht der Petitions Commission zur Bitte des Gemeinderathes in Mannheim und des B  rgerausschusses  die gesetzwidrige St  rung und Aufhebung der auf den 19  Nov  1845 angeordneten Versammlung des gro  en B  rgerausschusses der Stadt Mannheim betreffend

Download or read book Bericht der Petitions Commission zur Bitte des Gemeinderathes in Mannheim und des B rgerausschusses die gesetzwidrige St rung und Aufhebung der auf den 19 Nov 1845 angeordneten Versammlung des gro en B rgerausschusses der Stadt Mannheim betreffend written by and published by . This book was released on 1846 with total page 2 pages. Available in PDF, EPUB and Kindle. Book excerpt: