EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book TransCanada Keystone XL Pipeline Project

Download or read book TransCanada Keystone XL Pipeline Project written by exp Energy Services, Inc and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: TransCanada Keystone Pipeline, LP (Keystone) submits this Environmental Report to the Department of State (DOS) in support of its May 4, 2012 application for a Presidential Permit for the Keystone XL Pipeline Project (Project). The Environmental Report provides an update of the environmental impacts of the Project since the Final Environmental Impact Statement (FEIS) for the original Keystone XL Project was published August 2011.

Book Keystone XL Pipeline Project Compliance Follow Up Review

Download or read book Keystone XL Pipeline Project Compliance Follow Up Review written by and published by . This book was released on 2014-03-27 with total page 35 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Keystone XL project is a proposed 875-mile pipeline from Alberta, Canada, through Montana and South Dakota to Nebraska, where it would link with pipelines running to the U.S. Gulf Coast. It is to be built and operated by TransCanada Keystone Pipeline LP (TransCanada), an entity controlled by TransCanada Corp., a Canada-based energy company. On Sept. 19, 2008, TransCanada submitted a Presidential permit application to the Dept. of State (State) because Keystone XL crosses the U.S.- Canadian border into Montana. Following President Obama's Jan. 2012 denial, TransCanada filed a new Keystone XL permit application in May 2012. A supplemental EIS (SEIS) was required because the route through Nebraska proposed by TransCanada had changed, so State needed to select an EIS contractor to help prepare the SEIS. In May 2012, State selected Environmental Resources Management, Inc. (ERM). In March 2013, State issued a draft SEIS for Keystone XL. Thereafter, State received a number of complaints asserting that ERM and its staff lacked the requisite independence to serve as the SEIS contractor and that ERM's answers in the conflict of interest questionnaire submitted as part of the SEIS contractor selection process were not accurate. In response, State initiated this follow-up review to determine how well the process used to select ERM followed prescribed guidance and to determine how effective the revised process was in assessing and addressing organizational conflicts of interest for third-party contractors. This is a print on demand report.

Book Keystone XL Pipeline Project

Download or read book Keystone XL Pipeline Project written by Paul W. Parfomak and published by Createspace Independent Publishing Platform. This book was released on 2012-06-13 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report describes the Keystone XL pipeline proposal and the process required for federal approval. It summarizes key arguments for and against the pipeline put forth by the pipeline's developers, federal agencies, environmental groups, and other stakeholders. The report discusses potential consistency challenges faced by the State Department in reviewing the pipeline application given its recent prior approvals of similar pipeline projects. Finally, the report reviews the constitutional basis for the State Department's authority to issue a Presidential Permit, and opponents' possible challenges to this authority.

Book Crs Report for Congress

    Book Details:
  • Author : Paul W. Parfomak
  • Publisher : BiblioGov
  • Release : 2013-10
  • ISBN : 9781295026692
  • Pages : 22 pages

Download or read book Crs Report for Congress written by Paul W. Parfomak and published by BiblioGov. This book was released on 2013-10 with total page 22 pages. Available in PDF, EPUB and Kindle. Book excerpt: Canadian pipeline company TransCanada has filed an application with the U.S. Department of State to build the Keystone XL pipeline, which would transport crude oil from the oil sands region of Alberta, Canada, to refineries in the United States. Keystone XL would have the capacity to transport 700,000 barrels per day, delivering crude oil to the market hub at Cushing, OK, and further to points in Texas. The project is expected to cost more than $7.0 billion, of which at least $5.4 billion would be spent on the U.S. portion. TransCanada is planning to build a short additional pipeline so that oil from the Bakken formation in Montana and North Dakota can also be carried on the Keystone XL pipeline. The construction of petroleum facilities connecting the United States with a foreign country requires a Presidential Permit from the State Department based on a determination of national interest. An element of that determination for the Keystone XL project is the preparation of an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act. On April 16, 2010, the State Department's draft EIS for the Keystone XL project was released for comment to the general public and interested state and ...

Book Keystone XL Pipeline

Download or read book Keystone XL Pipeline written by United States. Congress. Senate. Committee on Energy and Natural Resources and published by . This book was released on 2014 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Keystone XL Pipeline

Download or read book Keystone XL Pipeline written by United States. Congress. Senate. Committee on Energy and Natural Resources and published by . This book was released on 2014 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The Pipeline and the Paradigm

Download or read book The Pipeline and the Paradigm written by Samuel Avery and published by . This book was released on 2013 with total page 225 pages. Available in PDF, EPUB and Kindle. Book excerpt: Explores the political, social, economic, and ecological issues that underlie the Keystone XL pipeline project, an endeavor that would release enough carbon into the atmosphere to drastically hasten climate change.

Book Dysfunction

Download or read book Dysfunction written by Dennis McConaghy and published by Dundurn. This book was released on 2017-01-21 with total page 233 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Keystone XL pipeline was most controversial North American energy infrastructure project of our time, and its history and demise serve as a cautionary tale for Canada, a country that will remain mired in regulatory dysfunction until it finds common ground between economic value and credible carbon policy.

Book Keystone XL Pipeline Project

Download or read book Keystone XL Pipeline Project written by and published by . This book was released on 2011 with total page 24 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Draft supplemental environmental impact statement for the Keystone XL Project

Download or read book Draft supplemental environmental impact statement for the Keystone XL Project written by United States. Department of State. Bureau of Oceans and International Environmental and Scientific Affairs and published by . This book was released on 2013 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Reasons for Decision in the Matter of TransCanada Keystone Pipeline GP Ltd

Download or read book Reasons for Decision in the Matter of TransCanada Keystone Pipeline GP Ltd written by Canada. National Energy Board and published by . This book was released on 2010 with total page 170 pages. Available in PDF, EPUB and Kindle. Book excerpt: On 27 February 2009, Keystone applied to the Board for a CPCN under section 52 of the National Energy Board Act (NEB Act or Act) authorizing Keystone to construct and operate the Keystone XL Pipeline, and for an approval pursuant to Part IV of the NEB Act for the toll methodology and tariff. The Keystone XL Pipeline Project consists of the construction of approximately 529 kilometres (km) of new 914 millimetre outside diameter (nominal pipe size 36 inch) pipeline from Hardisty, Alberta to Monchy, Saskatchewan. The Project will also include related physical works including: eight pump stations, storage tanks and other related works and activities including 32 mainline valves, cathodic protection for the pipeline, and pig launcher and receiver facilities. This report provides an overview of the matters considered by the Board in reaching a decision on the Application. Details of the Board's assessment of issues identified by the Board or by parties to the proceeding are set out in these Reasons. In coming to its findings, the Board considered all of the evidence on the record in this matter including economic feasibility, commercial impact, tolls and tariffs, engineering, land matters, Aboriginal concerns, environment and socio-economic matters, and the public interest.--Includes text from document.

Book Keystone XL Pipeline Project

Download or read book Keystone XL Pipeline Project written by Gregory B. Flynn and published by Nova Science Publishers. This book was released on 2012 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: TransCanada (a Canadian company) applied to the U.S. Department of State for a permit to cross the U.S.-Canada International border with the Keystone XL pipeline project in 2008. If constructed, the pipeline would carry crude oil produced from the oil sands regions of Alberta, Canada, to U.S. Gulf Coast refineries. Because the pipeline would connect the United States with a foreign country, it requires a Presidential Permit issued by the State Department. Issuance of a Presidential Permit requires a finding that the project would serve the "national interest." This book describes the Keystone XL pipeline proposal and the process required for federal approval. It summarises key arguments for and against the pipeline put forth by the pipeline's developers, federal agencies, environmental groups, and other stakeholders. Also discussed is the constitutional basis for the State Department's authority to issue a Presidential Permit, and opponents' possible challenges to this authority.

Book Final Supplemental Environmental Impact Statement for the Keystone XL Project

Download or read book Final Supplemental Environmental Impact Statement for the Keystone XL Project written by United States. Department of State and published by . This book was released on 2014 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Keystone Xl Pipeline

Download or read book Keystone Xl Pipeline written by Congressional Research Service and published by CreateSpace. This book was released on 2015-01-05 with total page 24 pages. Available in PDF, EPUB and Kindle. Book excerpt: TransCanada's proposed Keystone XL Pipeline would transport oil sands crude from Canada and shale oil produced in North Dakota and Montana to a market hub in Nebraska for further delivery to Gulf Coast refineries. The pipeline would consist of 875 miles of 36-inch pipe with the capacity to transport 830,000 barrels per day. Because it would cross the Canadian-U.S. border, Keystone XL requires a Presidential Permit from the State Department predicated on the department's determination that the project would serve the national interest. That determination considers environmental impacts, evaluated and documented in an environmental impact statement (EIS) pursuant to the National Environmental Policy Act (NEPA). TransCanada originally applied for a Presidential Permit for the Keystone XL Pipeline in 2008. An issue that arose during the permit review was environmental impacts in the Sand Hills region of Nebraska. This concern led the Nebraska legislature to enact new state pipeline siting requirements that would alter the pipeline route. The Presidential Permit was subsequently denied by the State Department. In May 2012, TransCanada reapplied for a Presidential Permit with a modified route through Nebraska. The new permit application initiated a new NEPA process. In January 2014, the State Department released the final EIS for the proposed Keystone XL Pipeline. The State Department subsequently began to focus on whether issuance of the permit would be in the national interest. To make such a determination, the department considers various factors related to the project and seeks input from members of the public and selected federal agencies. The public comment period closed in March 2014. In April 2014, the Department of State notified the other federal agencies that it would provide more time for their input due to ongoing litigation in the Nebraska Supreme Court challenging the state's approval of the altered pipeline route. Although the department stated that its review of the permit application would continue, many analysts viewed this notification as effectively suspending the permit review. Development of Keystone XL has been controversial. Proponents base their arguments primarily on increasing the diversity of the U.S. petroleum supply and economic benefits, especially jobs. Pipeline opposition stems in part from concern regarding the greenhouse gas emissions from the development of Canadian oil sands, continued U.S. dependency on fossil fuels, and the risk of a potential release of heavy crude. There is also concern over how much crude oil, or petroleum products refined from Keystone XL crude, would be exported overseas. Relations between the U.S. and Canadian governments have also been an issue. With the fate of Keystone XL uncertain, Canadian oil producers have pursued other shipment options, including other pipelines and rail. In light of what some consider excessive delays in the State Department's permit review, some in Congress have sought other means to support development of the pipeline. In the 113th Congress, the Energy Production and Project Delivery Act of 2013 (S. 17), the Northern Route Approval Act (H.R. 3), and the American Energy Solutions for Lower Costs and More American Jobs Act (H.R. 2) sought to eliminate the Presidential Permit requirement for Keystone XL. The Keystone for a Secure Tomorrow Act (H.R. 334) and a Senate bill to approve the Keystone XL Project (S. 582) would have directly approved the pipeline under the authority of Congress to regulate foreign commerce. A Senate amendment to the Fiscal 2014 Senate Budget Resolution (S.Con.Res. 8) would have provided for the approval of Keystone XL (S.Amdt. 494). The North American Energy Infrastructure Act (H.R. 3301) would have transferred permit authority for oil pipelines to the Department of Commerce, among other permitting changes.

Book The Politics Responsible for the Rejection of the Keystone XL Pipeline

Download or read book The Politics Responsible for the Rejection of the Keystone XL Pipeline written by Michael Kennedy and published by GRIN Verlag. This book was released on 2012-12-19 with total page 17 pages. Available in PDF, EPUB and Kindle. Book excerpt: Research Paper (undergraduate) from the year 2012 in the subject Politics - Region: USA, grade: A, Webster University, course: U.S. Foreign Policy, language: English, abstract: TransCanada Corporation’s Keystone XL Pipeline is a highly contentious matter in Canada and the United States as its proposed construction has been fraught with economic, environmental, and political issues. Since the pipeline was first proposed in 2008 as an extension of the already constructed Keystone Pipeline, the Keystone XL Pipeline has been most strongly opposed by environmental groups and certain political figures. Pressure from these various groups was largely responsible for U.S. President Barack Obama’s decision in November 2011 to reject the immediate construction of the pipeline and instead postpone the decision to 2013. The postponementto construct the pipeline waslargely a decision to conduct further investigations of the environmental concerns that opponents to the pipeline have raised. Those in support of the pipeline have suggested that the postponement to 2013 was merely a political ploy in order to avoid the pipeline issue, while appeasing environmentalists, until after the 2012 presidential election. Regardless of the president’s reason to delay the pipeline,relations with Canada have been negatively affected, it has continued to solidify U.S. dependence on foreign oil in comparatively more volatile regions, and has increased the Republican-dominated Congress’s pressure on the president. These opposing pressures appear to have had a heavy influence on the Obama administration as it now seems that a certain degree of policy backpedalling is evident while the president attempts to appease both sides of the debate.

Book Final Supplemental Environmental Impact Statement for the Keystone XL Project Executive Summary January 2014

Download or read book Final Supplemental Environmental Impact Statement for the Keystone XL Project Executive Summary January 2014 written by U. S. Department U.S. Department of Agriculture and published by CreateSpace. This book was released on 2015-06-22 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Keystone XL Pipeline (the proposed Project) is a proposed 875-mile pipeline project that would extend from Morgan, Montana, to Steele City, Nebraska. The pipeline would allow delivery of up to 830,000 barrels per day (bpd) of crude oil from the Western Canadian Sedimentary Basin (WCSB) in Canada and the Bakken Shale Formation in the United States to Steele City, Nebraska, for onward delivery to refineries in the Gulf Coast area (see Figure ES-1). TransCanada Keystone Pipeline, LP (Keystone) has applied for a Presidential Permit that, if granted, would authorize the proposed pipeline to cross the United States-Canadian border at Morgan, Montana.