EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book The PEP II Project

    Book Details:
  • Author :
  • Publisher :
  • Release : 1993
  • ISBN :
  • Pages : 8 pages

Download or read book The PEP II Project written by and published by . This book was released on 1993 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt: The PEP-II project, a joint proposal of SLAC, LBL, and LLNL, will involve an upgrade of the PEP storage ring at SLAC to serve as an asymmetric B factory. The upgrade will involve replacing the vacuum and rf systems of PEP, which will serve as the high-energy ring (containing 9 GeV electrons), along with the addition of a new low-energy ring (containing 3.1 GeV positrons) mounted atop the high-energy ring. The present design status of the project and a summary of recent R & D results are presented here. If approved, the PEP-II project is ready to begin construction in October 1993.

Book The PEP II Project

    Book Details:
  • Author : Michael S. Zisman
  • Publisher :
  • Release : 2006
  • ISBN :
  • Pages : pages

Download or read book The PEP II Project written by Michael S. Zisman and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later.

Book The PEP II Project wide Database

Download or read book The PEP II Project wide Database written by and published by . This book was released on 1995 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: The PEP-II Project Database is a tool for monitoring the technical and documentation aspects of this accelerator construction. It holds the PEP-II design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, magnet and vacuum fabrication data. CAD drawings, publications and documentation, survey and alignment data and property control. The database can be extended to contain information required for the operations phase of the accelerator and detector. Features such as viewing CAD drawing graphics from the database will be implemented in the future. This central Oracle database on a UNIX server is built using ORACLE Case tools. Users at the three collaborating laboratories (SLAC, LBL, LLNL) can access the data remotely, using various desktop computer platforms and graphical interfaces.

Book The PEP II

    Book Details:
  • Author :
  • Publisher :
  • Release : 1995
  • ISBN :
  • Pages : 9 pages

Download or read book The PEP II written by and published by . This book was released on 1995 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt: The PEP-II/BaBar Project Database is a tool for monitoring the technical and documentation aspects of the accelerator and detector construction. It holds the PEP-II/BaBar design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, components fabrication and calibration data, survey and alignment data, property control, CAD drawings, publications and documentation. This central Oracle database on a UNIX server is built using Oracle*Case tools. Users at the collaborating laboratories mainly access the data using World Wide Web (WWW). The Project Database is being extended to link to legacy databases required for the operations phase.

Book PEP II Asymmetric B Factory

Download or read book PEP II Asymmetric B Factory written by and published by . This book was released on 2004 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt: PEP-II, a 9 GeV x 3.1 GeV ee− collider with a design luminosity of 3 x 1033 cm−2s−1, was proposed jointly by SLAC, LBL, and LLNL. Recent efforts have continued towards an optimized design. In addition, an aggressive R & D program is under way to validate our design choices. Fabrication of a low-power prototype RF cavity is complete, and impedance measurements are beginning. A 500-kW, 476-MHz klystron has been completed; it will be used for testing both high-power RF windows and a prototype high-power cavity (now under design in collaboration with Chalk River Laboratory). Vacuum studies have demonstrated that chambers with suitable photodesorption properties can be fabricated. A mock-up of the two-ring arc area has been completed and used to investigate alignment and stability issues. The PEP-II project is ready to begin construction as soon as funds become available.

Book The PEP II Design

    Book Details:
  • Author :
  • Publisher :
  • Release : 1995
  • ISBN :
  • Pages : 10 pages

Download or read book The PEP II Design written by and published by . This book was released on 1995 with total page 10 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Stanford Linear Accelerator Center (SLAC), Lawrence Berkeley Laboratory (LBL), Lawrence Livermore National Laboratory (LLNL) Positron Electron Project-II (PEP-II) is a design for a high-luminosity, asymmetric energy, electron-positron colliding beam accelerator that will operate at the center-of-mass energy of the [Upsilon]4S (10.58 GeV). The goal of the design is to achieve a large enough integrated luminosity with a moving center-of-mass reference frame to he able to observe the predicted rare decay modes of the [Upsilon]4S that do not conserve charge parity (CP).

Book Design and Construction of the PEP II Low Energy Ring

Download or read book Design and Construction of the PEP II Low Energy Ring written by and published by . This book was released on 1996 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: We describe the design and construction status of theLow-Energy Ring (LER) of the PEP-II project, a collaboration of SLAC, LBNL, and LLNL. In the past year we have optimized LER parameters andstarted component fabrication. By reusing the original wigglers, we wereable to simplify the design of the distributed wiggler photon dump, whichmust dissipate 260 kW of power. The number of RF stations (eachcomprising a klystron powering two 476-MHz cavities) was reduced from 4to 3. We have begun fabrication of the arc vacuum system based on anextruded Al antechamber configuration with discrete photon stops andTSPs. The design of the straight section vacuum components, to befabricated from stainless steel pipe, is also completed. Quadrupoles anddipoles are provided under a collaborative agreement with IHEP (Beijing);correctors and skew quadrupoles are built domestically and sextupoles arerefurbished from existing PEP magnets. LER commissioning will begin earlyin 1998.

Book The PEP II Asymmetric B Factory

Download or read book The PEP II Asymmetric B Factory written by and published by . This book was released on 1994 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt: PEP-II, a 9 GeV x 3.1 GeV electron-positron collider with a design luminosity of 3 x 1033 cm−2s−1 has now been approved for construction by SLAC, LBL and LLNL for the purpose of studying CP violation in the B{bar B} system. This upgrade project involves replacing the vacuum and RF systeum of PEP, which will serve as the high-energy ring (HER), along with the addition of a new low-energy ring (LER) mounted atop the HER. Designs for both rings are described, and the anticipated project construction schedule is indicated. Collider operation will begin at the end of 1998. An aggressive R & D program has been carried out to validate our design choices; key results in the areas of lattice design, vacuum, RF, and multibunch feedback are summarized.

Book PEP II

    Book Details:
  • Author : M. Zisman
  • Publisher :
  • Release : 2005
  • ISBN :
  • Pages : 3 pages

Download or read book PEP II written by M. Zisman and published by . This book was released on 2005 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: An asymmetric B Factory to be installed in the PEP tunnel has been under study at SLAC, LBL, and LLNL for several years [1-4]. A mature design for a 9 GeV x 3.1 GeV electron-positron collider with a design luminosity of 3 x 10{sup 33} cm{sup -2}s{sup -1} is presented. Solutions now exist for all the technical problems, including issues related to high currents (e.g., beam instabilities, feedback systems, vacuum chamber design, lifetime degradation, and radiation power dissipation in the interaction region) and those related to different energies of the beams (e.g., beam separation, beam-beam interaction, and detector requirements). The status of this project, which is being proposed for funding in FY 1993, is discussed.

Book PEP II Asymmetric B Factory

Download or read book PEP II Asymmetric B Factory written by and published by . This book was released on 1992 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: PEP-II, a 9 GeV [times] 3.1 GeV e[sup +]e[sup [minus]] collider with a design luminosity of 3 [times] 10[sup 33] cm[sup [minus]2][sub s][sup [minus]1], was proposed jointly by SLAC, LBL, and LLNL. Recent efforts have continued towards an optimized design. In addition, an aggressive R D program is under way to validate our design choices. Fabrication of a low-power prototype RF cavity is complete, and impedance measurements are beginning. A 500-kW, 476-MHz klystron has been completed; it will be used for testing both high-power RF windows and a prototype high-power cavity (now under design in collaboration with Chalk River Laboratory). Vacuum studies have demonstrated that chambers with suitable photodesorption properties can be fabricated. A mockup of the two-ring arc area has been completed and used to investigate alignment and stability issues. The PEP-II project is ready to begin construction as soon as funds become available.

Book Status of the PEP II Asymmetric B Factory

Download or read book Status of the PEP II Asymmetric B Factory written by and published by . This book was released on 1994 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: The PEP-II project is an ee− storage ring complex with unequal energy beams to study CP violation in the B meson system. High luminosity requires a large number of bunches and a low value of beta at the collision point. The high beam current requires advances in vacuum chambers, damped RF cavities, and feedback systems. Machine elements inside the detector are required to achieve low beta values and magnetic separation.

Book Project Management for Mining  2nd Edition

Download or read book Project Management for Mining 2nd Edition written by Robin J. Hickson and published by Society for Mining, Metallurgy & Exploration. This book was released on 2022-02-01 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt: Before You Put the First Shovel in the Ground—This Book Could Be the Difference Between a Successful Mining Operation and a Money Pit Opening a successful new mine is a vastly complex undertaking, entailing several years and millions to billions of dollars. In today’s world, when environmental and labor policies, regulatory compliance, and the impact of the community must be factored in, you cannot afford to make a mistake. The Society for Mining, Metallurgy & Exploration has created this road map for you. Written by two hands-on, in-the-trenches mining project managers with decades of experience bringing some of the world’s most successful, profitable mines into operation on time, within budget, and ethically, Project Management for Mining gives you step-by-step instructions in every process you are likely to encounter. It is in use as course material in universities in Australia, Canada, Colombia, Ghana, Iran, Kazakhstan, Peru, Russia, Saudi Arabia, South Africa, the United Kingdom, as well as the United States. In addition, more than 100 different mining companies have sent employees to attend seminars conducted by authors Robin Hickson and Terry Owen, sessions all based around the material within this book. In the years following the first edition, the authors gratefully received a bevy of excellent suggestions from some 2,000 readers in over 50 countries. This helpful reader feedback, coupled with written evaluations from the more than 400 seminar attendees, has been an unparalleled source of improvement for this new book. This second edition is a significant accomplishment that includes 5 new chapters, substantial updates to the original 34 chapters, and 56 new or updated figures, flowcharts, and checklists that every project manager can use.

Book PEP II Status Report

Download or read book PEP II Status Report written by and published by . This book was released on 1998 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt: The main design features of the PEP-II asymmetric two-ring electron-positron B Factory collider, built at the Stanford Linear Accelerator Center, are described. This facility will complete construction in June 1998. The high energy ring, completed in May 1997, has had 3 months of commissioning and successfully stored 0.75 A of electrons. The success of the high energy ring testing validates not only its ring components, but also the injection system, the RF system and the control system all of which are common to the two rings.

Book PEP Project Status

    Book Details:
  • Author :
  • Publisher :
  • Release : 1973
  • ISBN :
  • Pages : pages

Download or read book PEP Project Status written by and published by . This book was released on 1973 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: From seminar on high-energy accelerator science; Tokyo and Tsukuba, Japan (5 Nov 1973). Parameters for the PEP (Proton-- Electron-- Positron) colliding beam facility and the status of the proposed facility are outlined. - The design study has been a joint effort by SLAC and LBL. (WHK).

Book The PEP II Abort Kicker System

Download or read book The PEP II Abort Kicker System written by and published by . This book was released on 1997 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt: The PEP-II project has two storage rings. The HER (High Energy Ring) has up to 1.48 A of electron beam at 9 GeV, and the LER (Low Energy Ring) has up to 2.14 A of positron beam at 3.1 GeV. To protect the HER and LER beam lines in the event of a ring component failure, each ring has an abort kicker system which directs the beam into a dump when a failure is detected. Due to the high current of the beams, the beam kick is tapered from 100% to 80% in 7.33 uS (the beam transit time around the time). This taper distributes the energy evenly across the window which separates the ring from the beam dump such that the window is not damaged. The abort kicker trigger is synchronized with the ion clearing gap of the beam allowing for the kicker field to rise from 0-80% in 370 nS. This report discusses the design of the system controls, interlocks, power supplies, and modulator.

Book Albuquerque Meeting   Proceedings Of The 8th Meeting Division Of Particles And Fields Of The American Physical Society  In 2 Volumes

Download or read book Albuquerque Meeting Proceedings Of The 8th Meeting Division Of Particles And Fields Of The American Physical Society In 2 Volumes written by Sally Seidel and published by World Scientific. This book was released on 1995-07-05 with total page 2088 pages. Available in PDF, EPUB and Kindle. Book excerpt: This book presents the latest results from high energy physics laboratories. The topics discussed include: Cosmology, Heavy Ions, Electroweak, Heavy Flavour Physics and CP Violation/Rare Decays, QCD and Beyond the Standard Model, Planck Scale Physics, Accelerator and Non-Accelerator Physics and Instrumentation.

Book Proceedings

Download or read book Proceedings written by and published by . This book was released on 1995 with total page 772 pages. Available in PDF, EPUB and Kindle. Book excerpt: