EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241 AY 101 MULTI PROBE CORROSION MONITORING SYSTEM

Download or read book TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241 AY 101 MULTI PROBE CORROSION MONITORING SYSTEM written by and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

Book Process Test Plan for the 241 AN 105 Multi function Corrosion Monitoring System

Download or read book Process Test Plan for the 241 AN 105 Multi function Corrosion Monitoring System written by and published by . This book was released on 1999 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt: Process Test Plan (PTP) for 241-AN-105 corrosion monitoring system. A corrosion monitoring probe will be installed into 241-AN-105 in late FY 1999. There are five principle objectives of this task: (1) Acquire data on the corrosive characteristics of the existing waste in 241-AN-105. (2) Provide supporting data to the Integrity Assessment program. (3) Acquire data to support a proposed eventual change in the operation of double shell tanks to monitor and control tank corrosion through the use of corrosion probes rather than waste sampling and analysis. (4) Demonstrate that corrosion monitoring by evaluation of electrochemical noise data is possible in waste tank systems, particularly with regard to the detection of general corrosion and (if present) pitting and stress corrosion cracking. (5) Demonstrate the durability of the design of the corrosion monitoring equipment. The long term advantage of corrosion monitoring in double shell tanks is expected to be extended tank life and reduced annual operations cost.

Book Acceptance Test Plan for the 241 AN 105 Multi function Corrosion Monitoring System

Download or read book Acceptance Test Plan for the 241 AN 105 Multi function Corrosion Monitoring System written by and published by . This book was released on 1999 with total page 11 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Acceptance Test Procedure (ATP) will document the satisfactory operation of the corrosion probe tree assembly destined for installation into tank 241-AN-105. This ATP will be performed by the manufacturer prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion probe tree assembly to be installed into tank 241-AN-105. The test will consist of a pressure test to verify leak tightness of the probe tree body, a continuity test of the probe tree wiring, a test of the high level detector wiring, a test of the operation of the Type K thermocouples along the probe body, and verification of operation of corrosion monitoring computer and instrumentation.

Book Process Test Plan for 4TH Generation Hanford Corrosion Monitoring System

Download or read book Process Test Plan for 4TH Generation Hanford Corrosion Monitoring System written by and published by . This book was released on 2000 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt: Instrumentation and cabinets for the 241-AN-107 and 241-AN-102 corrosion monitoring systems will be upgraded in FY 2000. The bulk of the field work involved in this task will involve placement of the corrosion monitoring data collection hardware closer to the risers that house the existing corrosion probes. This will be accomplished by placing a new climate controlled cabinet by the risers containing corrosion probes on these two tanks (one cabinet per tank). Once installed the systems will feed data back to a centralized corrosion monitoring station in the 241-AN-271 instrument building. The upgraded systems will be operated under the bounds of this Process Test Plan (PTP) for six principle reasons. These reasons were established prior to installing the original systems in 1997 (241-AN-107) and 1998 (241-AN-102). They are as follows: (1) Acquire corrosion data on the waste in 241-AN-107 and 241-AN-102. (2) Provide supporting data to the site's Integrity Assessment program. (3) Demonstrate that corrosion monitoring by evaluation of electrochemical noise data is possible in waste tank systems, particularly with regard to the detection of general corrosion and (if present) pitting and stress corrosion cracking. (4) Demonstrate the durability of the design of the corrosion monitoring equipment. (5) Extend tank life and reduce annual operations cost. (6) Provide basis to control corrosion in double shell tanks though the use of direct corrosion monitoring rather than waste sampling and analysis. The designs of the existing corrosion probes in 241-AN-107 and 241-AN-102 were reviewed and documented prior to the original installation activities in 1997 and 1998. Initial programmatic documentation for Hanford's corrosion monitoring program was also established prior to the original installation activities.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1995-04 with total page 848 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Acceptance Test Plan for Fourth Generation Hanford Corrosion Monitoring System

Download or read book Acceptance Test Plan for Fourth Generation Hanford Corrosion Monitoring System written by and published by . This book was released on 2000 with total page 13 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Acceptance Test Plan (ATP) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATP will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).

Book TANK 241 AN 102 MULTI PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED

Download or read book TANK 241 AN 102 MULTI PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: During 2007 and 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was designed and fabricated for use in double-shell tank 241-AN-102. The system was successfully installed in the tank on May 1, 2008. The 241-AN-102 MPCMS consists of one 'fixed' in-tank probe containing primary and secondary reference electrodes, tank material electrodes, Electrical Resistance (ER) sensors, and stressed and unstressed corrosion coupons. In addition to the fixed probe, the 241-AN-102 MPCMS also contains four standalone coupon racks, or 'removable' probes. Each rack contains stressed and unstressed coupons made of American Society of Testing and Materials A537 CL1 steel, heat-treated to closely match the chemical and mechanical characteristics of the 241-AN-102 tank wall. These coupon racks can be removed periodically to facilitate examination of the attached coupons for corrosion damage. Along the way to successful system deployment and operation, the system design, fabrication, and testing activities presented a number of challenges. This document discusses these challenges and lessons learned, which when applied to future efforts, should improve overall project efficiency.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 708 pages. Available in PDF, EPUB and Kindle. Book excerpt: Semiannual, with semiannual and annual indexes. References to all scientific and technical literature coming from DOE, its laboratories, energy centers, and contractors. Includes all works deriving from DOE, other related government-sponsored information, and foreign nonnuclear information. Arranged under 39 categories, e.g., Biomedical sciences, basic studies; Biomedical sciences, applied studies; Health and safety; and Fusion energy. Entry gives bibliographical information and abstract. Corporate, author, subject, report number indexes.

Book Test Plan for Tank 241 AW 101 Solubility Screening Tests

Download or read book Test Plan for Tank 241 AW 101 Solubility Screening Tests written by and published by . This book was released on 1998 with total page 21 pages. Available in PDF, EPUB and Kindle. Book excerpt: Tank 241-AW-101 (101-AW) has been identified as one of the early tanks to be for retrieved for low level waste pretreatment and immobilization and retrieval of the tank waste may require dilution. This test is to determine the effects of dilution on the mass of solids and their composition. This test plan gives test instructions, example data sheets, a waste compatibility review, and a waste stream fact sheet. This test Plan is similar to tests on tanks 241-AN-102 (Person 1998a) and 241-AN-107 (Person 1998 b). The 101-AW tests will be done with composites of liquid and solids from grab samples that were taken in 1998 (Benar 1998). Future revisions of the Tank Sampling and Analysis Plan (Benar 1998) may change the details of the work performed under this test plan.

Book Operability Test Procedure  Tank  241 SY 101 Equipment Removal System

Download or read book Operability Test Procedure Tank 241 SY 101 Equipment Removal System written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 1850
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 1850 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Engineering Test Plan for Tank 241 SY 101 in Situ Viscometer  Revision 1

Download or read book Engineering Test Plan for Tank 241 SY 101 in Situ Viscometer Revision 1 written by and published by . This book was released on 1994 with total page 33 pages. Available in PDF, EPUB and Kindle. Book excerpt: To obtain in situ measurements of the rheological properties within tank 241-SY-101, this document will implement the test strategy defined in PNLMIT-041994, Acquisition and Reduction of Data Obtained in Tank SY-101 with the Ball Rheometer. Instructions for all sequences are defined within the procedure. All safety requirements as defined in LA-UR-92-3196, A Safety Assessment for Proposed Mixing Operations to Mitigate Episodic Gas Releases in Tank 241-101-SY have been implemented into this procedure.

Book Tank 241 SY 101 Surface Level Rise Remediation Test and Evaluation Plan for Transfer System

Download or read book Tank 241 SY 101 Surface Level Rise Remediation Test and Evaluation Plan for Transfer System written by and published by . This book was released on 1999 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this testing and evaluation plan (TEP) is to provide the high level guidance on testing requirements for ensuring that the equipment and systems to be implemented for remediation of the SY-101 waste level rise USQ are effective.

Book Test Plan for Tank 241 AZ 101 Solubility Screening Tests

Download or read book Test Plan for Tank 241 AZ 101 Solubility Screening Tests written by and published by . This book was released on 1999 with total page 22 pages. Available in PDF, EPUB and Kindle. Book excerpt: Tank 241-AZ-101 (101-AZ) has been identified as one of the early tanks to be retrieved for waste pretreatment and immobilization. Retrieval of the tank waste from other tanks may require dilution. This test is to determine the effects of dilution on the mass of solids and their composition, which can be compared with tanks where dilution is required. This test plan gives test instructions, example data sheets, a waste compatibility review, and a waste stream fact sheet.

Book Ultrasonic Examination of Double shell Tank 241 AY 101

Download or read book Ultrasonic Examination of Double shell Tank 241 AY 101 written by and published by . This book was released on 2003 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Acceptance Test Procedure  241 SY 101

Download or read book Acceptance Test Procedure 241 SY 101 written by and published by . This book was released on 1994 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

Book Acceptance Test Report for Fourth Generation Hanford Corrosion Monitoring System

Download or read book Acceptance Test Report for Fourth Generation Hanford Corrosion Monitoring System written by and published by . This book was released on 2000 with total page 12 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Acceptance Test Report (ATR) will document the satisfactory operation of the corrosion probe cabinets destined for installation on tanks 241-AN-102 and 241-AN-107. This ATR will be performed by the manufacturer on each cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinets to be installed on tanks 241-AN-102 and 241-AN-107. One cabinet will be installed on each tank. Each cabinet will contain corrosion monitoring hardware to be connected to existing corrosion probes already installed in each tank. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation (input a known signal and see if the instrumentation records the proper value).