EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Tank 241 A 101 Cores 154 and 156 Analytical Results for the Final Report

Download or read book Tank 241 A 101 Cores 154 and 156 Analytical Results for the Final Report written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This report contains tables of the analytical results from sampling Tank 241-A-101 for the following: fluorides, chlorides, nitrites, bromides, nitrates, phosphates, sulfates, and oxalates. This tank is listed on the Hydrogen Watch List.

Book Fermentierte Lebensmittel

Download or read book Fermentierte Lebensmittel written by and published by . This book was released on 1981 with total page 113 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 2009
  • ISBN :
  • Pages : pages

Download or read book written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank 241 AW 101  Cores 132 and 139 Analytical Results for the Final Report

Download or read book Tank 241 AW 101 Cores 132 and 139 Analytical Results for the Final Report written by and published by . This book was released on 1996 with total page 3038 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank 241 BY 101  Cores 189 and 199 Analytical Results for the Final Report

Download or read book Tank 241 BY 101 Cores 189 and 199 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page 179 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document is the final laboratory report for Tank 241-BY-101. Push mode core segments were removed from Pisers 10B and 10D between May 27, 1997, and June 1, 1997. Segments were received and extruded at 222-S Laboratory. Analyses were performed in accordance with Tank 241-. BY-101 Push Core Sampling and analysis Plan (TSAP) and Tank Safety Screening Data Quality Objective (DQO). None of the subsamples submitted for total alpha activity (AT) or differential scanning calorimetry (DSC) analysis exceeded the notification limits as stated in TSAP and DQO, The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems (TWRS) Technical Basis Group, and are not considered in this report. Near Infrared Spectroscopy (NIR) analysis was requested in order to compare NIR results with those obtained from percent water gravimetry analysis (%H20) and thermal gravimetric analysis (TGA). The TWRS Technical Basis Group rescinded the request for this analysis, and neither NIR nor %H20 analyses were performed.

Book Tank 241 AW 103  Cores 193 and 194 Analytical Results for the Final Report

Download or read book Tank 241 AW 103 Cores 193 and 194 Analytical Results for the Final Report written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: No abstract available.

Book Tank 241 C 104 Cores 162   165 Analytical Results for the Final Report

Download or read book Tank 241 C 104 Cores 162 165 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank 241 AN 105  Cores 152 and 153 Analytical Results for the Final Report

Download or read book Tank 241 AN 105 Cores 152 and 153 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page 2503 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank 241 BY 109  Cores 201 and 203  Analytical Results for the Final Report

Download or read book Tank 241 BY 109 Cores 201 and 203 Analytical Results for the Final Report written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document is the final laboratory report for tank 241-BY-109 push mode core segments collected between June 6, 1997 and June 17, 1997. The segments were subsampled and analyzed in accordance with the Tank Push Mode Core Sampling and Analysis Plan (Bell, 1997), the Tank Safety Screening Data Quality Objective (Dukelow, et al, 1995). The analytical results are included.

Book Final Report for Tank 241 B 101  Push Mode Cores 90 and 91  Revision 1

Download or read book Final Report for Tank 241 B 101 Push Mode Cores 90 and 91 Revision 1 written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This is the final report for tank 241-@101, cores 90 and 91. Samples from these cores were analyzed for safety screening purposes in accordance with the Tank 241-B-101 Tank Characterization Plan (TCP) (Reference 1). This final report contains the results for three sets of TGA and gravimetric analyses performed after the 90-day report was issued. Two of these TGA/gravimetric percent water sets of analyses were done because low original TGA results were obtained for the lower half segment of core 90, segment 2 and the facie of core 91, segment 2; the third set of analyses were performed because the TGA and gravimetric percent water results for the upper half segment of core 90, segment 2 differed by approximately a factor of three and further investigation was warranted.

Book Tank 241 AW 104  Cores 204 and 206 Analytical Results for the Final Report

Download or read book Tank 241 AW 104 Cores 204 and 206 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page 919 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank 241 T 204  Core 188 Analytical Results for the Final Report

Download or read book Tank 241 T 204 Core 188 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page 402 pages. Available in PDF, EPUB and Kindle. Book excerpt: TANK 241-T-204, CORE 188, ANALYTICAL RESULTS FOR THE FINAL REPORT. This document is the final laboratory report for Tank 241 -T-204. Push mode core segments were removed from Riser 3 between March 27, 1997, and April 11, 1997. Segments were received and extruded at 222-8 Laboratory. Analyses were performed in accordance with Tank 241-T-204 Push Mode Core Sampling and analysis Plan (TRAP) (Winkleman, 1997), Letter of instruction for Core Sample Analysis of Tanks 241-T-201, 241- T-202, 241-T-203, and 241-T-204 (LAY) (Bell, 1997), and Safety Screening Data Qual@ Objective (DO) ODukelow, et al., 1995). None of the subsamples submitted for total alpha activity (AT) or differential scanning calorimetry (DC) analyses exceeded the notification limits stated in DO. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group and are not considered in this report.

Book Tank 241 SX 106  Cores 223 and 224  Analytical Results for the Final Report

Download or read book Tank 241 SX 106 Cores 223 and 224 Analytical Results for the Final Report written by and published by . This book was released on 1998 with total page 1650 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report is a compilation of the analytical results for tank 241-SX-106, cores 223 and 224.

Book Instytut elektrozvarjuvannja im E O  Patona

Download or read book Instytut elektrozvarjuvannja im E O Patona written by and published by . This book was released on 1967 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Tank 241 B 109  Cores 169 and 170 Analytical Results for the Final Report

Download or read book Tank 241 B 109 Cores 169 and 170 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page 508 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document is the final laboratory report for tank 241-B-109. Push mode core segments were removed from risers 4 and 7 between August 22, 1996, and August 27, 1996. Segments were received and extruded at 222-S Analytical Laboratory. Analyses were performed in accordance with Tank 241-B-109 Push Mode Core Sampling and Analysis Plan (TSAP) and Tank Safety Screening Data Quality Objective (DQO). The results for primary safety screening data, including differential scanning calorimetry (DSC) analyses, thermogravimetric analyses (TGA), bulk density determinations, and total alpha activity analyses for each subsegment, were presented in the 45-Day report (Rev. 0 of this document). The 45-Day report is included as Part II of this revision. The raw data for DSC and TGA is found in Part II of this report. The raw data for all other analyses are included in this revision.

Book Tank 241 BY 112  Cores 174 and 177 Analytical Results for the Final Report

Download or read book Tank 241 BY 112 Cores 174 and 177 Analytical Results for the Final Report written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Results from bulk density tests ranged from 1.03 g/mL to 1.86 g/mL. The highest bulk density result of 1.86 g/mL was used to calculate the solid total alpha activity notification limit for this tank (33.1 uCi/g), Total Alpha (AT) Analysis. Attachment 2 contains the Data Verification and Deliverable (DVD) Summary Report for AT analyses. This report summarizes results from AT analyses and provides data qualifiers and total propagated uncertainty (TPU) values for results. The TPU values are based on the uncertainties inherent in each step of the analysis process. They may be used as an additional reference to determine reasonable RPD values which may be used to accept valid data that do not meet the TSAP acceptance criteria. A report guide is provided with the report to assist in understanding this summary report.

Book Tank 241 T 201  Core 192 Analytical Results for the Final Report

Download or read book Tank 241 T 201 Core 192 Analytical Results for the Final Report written by and published by . This book was released on 1997 with total page 458 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document is the final laboratory report for Tank 241-T-201. Push mode core segments were removed from Riser 3 between April 24, 1997, and April 25, 1997. Segments were received and extruded at 222-S Laboratory. Analyses were performed in accordance with Tank 241-T-201 Push Mode Core Sampling and Analysis Plan (TSAP) (Hu, 1997), Letter of Instruction for Core Sample Analysis of Tanks 241-T-201, 241-T-202, 241-T-203, and 241-T-204 (LOI) (Bell, 1997), Additional Core Composite Sample from Drainable Liquid Samples for Tank 241-T-2 01 (ACC) (Hall, 1997), and Safety Screening Data Quality Objective (DQO) (Dukelow, et al., 1995). None of the subsamples submitted for total alpha activity (AT) or differential scanning calorimetry (DSC) analyses exceeded the notification limits stated in DQO. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group, and are not considered in this report.