EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book SSN 774 Virginia Class

Download or read book SSN 774 Virginia Class written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: GlobalSecurity.org, located in Alexandria, Virginia, offers a profile about the SSN-774 Virginia class, attack submarines that were developed for the U.S. Navy. Three of these submarines were produced. GlobalSecurity.org describes the specifications, plans, and operations of the SSN-774 Virginia class. Images and a ship list of the submarines are available.

Book Navy Virginia Class Attack Submarine Procurement

Download or read book Navy Virginia Class Attack Submarine Procurement written by Ronald O'Rourke and published by Createspace Independent Publishing Platform. This book was released on 2016-11-11 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.

Book Navy Virginia Class Attack Submarine Procurement

Download or read book Navy Virginia Class Attack Submarine Procurement written by Ronald O'Rourke and published by Createspace Independent Publishing Platform. This book was released on 2017-04-07 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25th and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.

Book Navy Virginia  Ssn 774  Class Attack Submarine Procurement

Download or read book Navy Virginia Ssn 774 Class Attack Submarine Procurement written by O'Rourke and published by CreateSpace. This book was released on 2014-10-31 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Book Navy Virginia  Ssn 774  Class Attack Submarine Procurement

Download or read book Navy Virginia Ssn 774 Class Attack Submarine Procurement written by Congressional Research Service and published by CreateSpace. This book was released on 2015-06-26 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2015 are to be the 21st and 22nd boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract.

Book Crs Report for Congress

    Book Details:
  • Author : Congressional Research Service: The Libr
  • Publisher : BiblioGov
  • Release : 2013-11
  • ISBN : 9781293256145
  • Pages : 32 pages

Download or read book Crs Report for Congress written by Congressional Research Service: The Libr and published by BiblioGov. This book was released on 2013-11 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) since FY1998, and a total of 12 have been procured through FY2010. From FY2001 through FY2010, the boats were procured at a rate of one per year. Under Navy plans, the procurement rate was to increase to two boats per year starting in FY2011. The eight boats to be procured in the five-year period FY2009-FY2013 (boats 11 through 18, in annual quantities of 1-1-2-2-2) are being procured under a multiyear procurement (MYP) arrangement. The Navy's proposed FY2011 budget requested $3,441.5 million in procurement funding to complete the procurement cost of the 13th and 14th Virginia-class boats. The FY2011 budget estimated the combined procurement cost of these two boats at $5,344.4 million, and the boats through FY2010 had received a total of $1,903.0 million in prior-year advance procurement (AP) and Economic Order Quantity (EOQ) funding. The Navy's proposed FY2011 budget also requested $1,436.8 million in AP funding for Virginia-class boats to be procured in future years, and $254.4 million in Economic Order Quantity (EOQ) purchases of long-leadtime items for Virginia-class boats to be procured under the FY2009-FY2013 MYP arrangement. Potential issues for Congress regarding the Virginia-class program include the ...

Book Navy Virginia Class Attack Submarine Procurement

Download or read book Navy Virginia Class Attack Submarine Procurement written by Congressional Research Service and published by Createspace Independent Publishing Platform. This book was released on 2017-09-18 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2018 are to be the 27th and 28th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2018 at $5,532.7 million, or an average of $2,766.4 million each. The boats have received a total of $1,647.0 million in prior-year "regular" advance procurement (AP) funding and $580.4 million in prior-year Economic Order Quantity (EOQ) AP funding. The Navy's proposed FY2018 budget requests the remaining $3,305.3 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2018 budget also requests $1,920.6 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2018 funding request for the program (excluding outfitting and post-delivery costs) to $5,225.9 million. The Navy plans to build one of the two Virginia-class boats scheduled to be procured in FY2019, and all Virginia-class boats procured in FY2020 and subsequent years, with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's proposed FY2018 budget requests $72.9 million in research and development funding for the Virginia Payload Module (VPM). The Navy's previous force-level goal was to achieve and maintain a 308-ship fleet, including 48 SSNs. The Navy's new force-level goal, released in December 2015, is to achieve and maintain a 355-ship fleet, including 66 SSNs. The Navy's FY2017 30-year shipbuilding plan was developed in association with the previous 308-ship force-level goal, and consequently does not include enough SSNs to achieve and maintain a force of 66 SSNs. CRS estimates that 19 SSNs would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. The Congressional Budget Office (CBO) estimates that 16 to 19 would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. Taking into account the capacity of the submarine construction industrial base and the Navy's current plan to also build Columbia (SSBN-826) class ballistic missile submarines in coming years, CRS and CBO estimate that the earliest a 66-boat SSN force could be achieved might be the mid- to late 2030s. From FY2025 to FY2036, the number of SSNs is projected to experience a dip or valley, reaching a minimum of 41 boats (i.e., 25 boats, or about 38%, less than the 66-boat force-level goal) in FY2029. This projected valley is a consequence of having procured a relatively small number of SSNs during the 1990s, in the early years of the post-Cold War era. Some observers are concerned that this projected valley in SSN force levels could lead to a period of heightened operational strain for the SSN force, and perhaps a period of weakened conventional deterrence against potential adversaries. The projected SSN valley was first identified by CRS in 1995 and has been discussed in CRS reports and testimony every year since then. The Navy has been exploring options for mitigating the projected valley. Procuring additional Virginia-class boats in the near term is one of those options. In that connection, the Navy has expressed interest in procuring an additional Virginia-class boat in FY2021. Congress also has the option of funding the procurement of one or more additional Virginia-class boats in FY2018-FY2020.

Book The US Navy s Fast Attack Submarines  Vol  2

Download or read book The US Navy s Fast Attack Submarines Vol 2 written by James C. Goodall and published by Schiffer Military History. This book was released on 2020-06-28 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Successors to the US Navy's Los Angeles-class fast-attack submarines (presented in volume 1), the Seawolf- and Virginia-class SSNs are presented here from their initial design and construction, through testing and trials, to current operations. From its debut in 1997, the nuclear-powered Seawolf (SSN-21) represented the lead ship of the deadliest submarine ever to be constructed for the USN during the Cold War. With the end of the Cold War, the Seawolf-class SSNs were limited to the three that were under construction at the time, and the program was terminated. With only three in the class, the supersecret USS Jimmy Carter (SSN-23) is virtually off limits to any and all photography. The author's unprecedented access onboard a Seawolf-class SSN--the USS Connecticut (SSN-22)--is a first for the Navy and provides exclusive coverage found only in this book. In place of the Seawolf class, the Virginia-class attack submarine is an advanced stealth, multimission nuclear-powered submarine for deep-ocean antisubmarine warfare and littoral (shallow water) operations.

Book Sustaining U S  Nuclear Submarine Design Capabilities

Download or read book Sustaining U S Nuclear Submarine Design Capabilities written by John Frederic Schank and published by Rand Corporation. This book was released on 2007 with total page 235 pages. Available in PDF, EPUB and Kindle. Book excerpt: For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret.

Book US Nuclear Submarines

    Book Details:
  • Author : Jim Christley
  • Publisher : Bloomsbury Publishing
  • Release : 2012-01-20
  • ISBN : 1780963424
  • Pages : 76 pages

Download or read book US Nuclear Submarines written by Jim Christley and published by Bloomsbury Publishing. This book was released on 2012-01-20 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: The adoption of nuclear power revolutionized submarine design and means that vessels can stay underwater for months, trailing the enemy or training weapons on land targets from secret positions, “always there, never seen.” Jim Christley, a former submariner, explores here the influence of Admiral Hyman Rickover in cautiously introducing these stealthy machines of war, and frankly discusses the power and perils of using nuclear reactors at sea. Using unique and detailed artwork, he outlines the many evolving aspects of design within the submarine classes, from the very first nuclear submarine, USS Nautilus, to the classes under construction even now.

Book Soviet Cold War Attack Submarines

Download or read book Soviet Cold War Attack Submarines written by Edward Hampshire and published by Bloomsbury Publishing. This book was released on 2020-09-17 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: In this highly detailed book, naval historian Edward Hampshire reveals the fascinating history of the nuclear-powered attack submarines built and operated by the Soviet Union in the Cold War, including each class of these formidable craft as they developed throughout the Cold War period. The November class, which were the Soviet Union's first nuclear submarines, had originally been designed to fire a single enormous nuclear-tipped torpedo but were eventually completed as boats firing standard torpedoes. The Alfa class were perhaps the most remarkable submarines of the Cold War: titanium-hulled (which was light and strong but extremely expensive and difficult to weld successfully), crewed with only thirty men due to considerable automation and 30% faster than any US submarines, they used a radical liquid lead-bismuth alloy in the reactor plant. The Victor class formed the backbone of the Soviet nuclear submarine fleet in the 1970s and 1980s, as hunter-killer submarines began to focus on tracking and potentially destroying NATO ballistic missile submarines. The Sierra classes were further titanium-hulled submarines and the single Mike-class submarine was an experimental type containing a number of innovations. Finally, the Akula class were being constructed as the Cold War ended, and these boats form the mainstay of the Russian nuclear attack submarine fleet today. This book explores the design, development, and deployment of each of these classes in detail, offering an unparalleled insight into the submarines which served the Soviet Union throughout the Cold War period. The text is supported by stunning illustrations, photographs and diagrams of the submarines.

Book Navy Force Structure and Shipbuilding Plans

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.

Book Crs Report for Congress

    Book Details:
  • Author : Congressional Research Service: The Libr
  • Publisher : BiblioGov
  • Release : 2013-11
  • ISBN : 9781295255313
  • Pages : 34 pages

Download or read book Crs Report for Congress written by Congressional Research Service: The Libr and published by BiblioGov. This book was released on 2013-11 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) at a rate of one per year for the past several years. The procurement rate is scheduled to increase to two boats per year starting in FY2011. A total of 11 boats have been procured through FY2009. The eight Virginia-class submarines to be procured in the five-year period FY2009-FY2013 (boats 11 through 18) are being procured under a multiyear procurement (MYP) arrangement. FY2010 The Navys proposed FY2010 budget, which is expected to be submitted to Congress in early- to mid-May, is expected to request procurement funding to complete the procurement cost of the 12th Virginia-class boat, advance procurement funding for the two Virginia-class boats scheduled to be procured in FY2011, and additional advance procurement funding for Virginia-class boats scheduled to be procured in subsequent fiscal years. FY2009 The Navys proposed FY2009 budget requested $2,107.0 million to complete the procurement funding for the 11th Virginia-class boat. This boat had already received $756.0 million in prior-year advance procurement funding. The Navys proposed FY2009 budget also requested $719.8 million in advance procurement funding for Virginia-class boats to be procured in future fiscal years, and $596.8 million in additional procurement funding for ...

Book Astute Class Nuclear Submarine Owners  Workshop Manual

Download or read book Astute Class Nuclear Submarine Owners Workshop Manual written by Jonathan Gates and published by Haynes Publishing UK. This book was released on 2018-06-05 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Astute-class is the largest, most advanced and most powerful attack submarine ever operated by the Royal Navy, combining world-leading sensors, design and weaponry in a versatile vessel. The submarines are nuclear-propelled and fuelled by a nuclear reactor powerful enough to supply a city the size of Southampton. Its advanced technology means the submarines will never need to be refuelled. They employ the latest technology such as the Sonar 2076 that detects the sound of enemy submarines using the largest number of hydrophones ever fitted to a submarine. Linked with powerful onboard electronics these provide the submarines with outstanding sensitivity. The Astute submarines are armed with the latest versions of Spearfish heavy-weight torpedoes and Tomahawk land-attack cruise missiles.

Book Crs Report for Congress

    Book Details:
  • Author : Congressional Research Service: The Libr
  • Publisher : BiblioGov
  • Release : 2013-11
  • ISBN : 9781295255283
  • Pages : 60 pages

Download or read book Crs Report for Congress written by Congressional Research Service: The Libr and published by BiblioGov. This book was released on 2013-11 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Three Years Aboard a Navy Destroyer

Download or read book Three Years Aboard a Navy Destroyer written by Otis Ted Holly and published by Trafford Publishing. This book was released on 2011-04-25 with total page 402 pages. Available in PDF, EPUB and Kindle. Book excerpt: This book is a sea story about a U.S. Navy destroyer and her crew. The author served on this ship, the USS Brush (DD745), for 3 years and 2 months in the early 1950s. Life on the Brush involved a lot of sea duty. She spent most of this time at sea either conducting training exercises off the coast of California or steaming around somewhere in the Far east. The Brush made 3 seven month cruises to the Orient while the author was aboard her. The main objective of this book, and the reason for writing it, was to tell about what the crew of the Brush experienced on these 3 cruises. The first cruise was made in early 1953. The Brush was sent to the Korean War theatre and spent several months there doing what destroyers do during war time. The men experienced things off North Korea that they will never forget. In addition to the Korean Patrol, the Brush participated in the Formosa Patrol for a month or so and went to the island city of Hong Kong while she was down that way. The second cruise was made in May, 1954. On this cruise, the brush spent most of her time in the South China Sea, Formosa Strait, and in the Sea of Japan. The Brush commenced the third cruise in June, 1955. This was more of a peace time cruise and we never had to go into harms way. Although, the author had a number of interesting personal experiences which he wrote about. Comments by people who have read the book, Three Years Aboard A Navy Destroyer As the son of one of the USS Brushs skippers identified in Ted Hollys book, I was particularly fascinated to read of his and his shipmates many and varied experiences during their three Far East cruises. His folksy stories of a young mans explorations of the vastness of the oceans, the wonders of the orient, and the uncertainties of combat are told in a detailed and entertaining style offering multiple layers of insight to life aboard a tin can in the 1950s. In addition to his prose, Mr. Holly has included many photographs and maps which enhance and elucidate the storytelling. It is a terrific read for anyone interested in the naval service in general and the unforgotten Korean War in particular. Dennis Quigley Captain, USMC (Retired) Arizona the straightforward and unglossed memories of a young sailor, out of high school and soon into a U.S. destroyer, greyhound of the seas. Ted Holly was everybodys favorite sailor, squared away with a great attitude in a key job around the nerve center of a 2200 tonner loaded for whatever kind of scrap. This book is an honest snapshot of the times, the people, and the ships that sailed to the Korean Conflict. Ted Brown LT., USNR (Retired) New Hampshire This book, Three Years Aboard A Navy Destroyer, vividly recounts typical destroyer, i.e. USS BRUSH DD745, operations during the final days of the Korea War and the transition into post war routine operations. It accurately reports destroyer actions against North Korean trains, sinking of floating mines with rifle fire, the Wonsan Harbor actions and support of Korean Forces engaged in clandestine operations. It also provides a typical sailors view and experiences of the liberty ports in Japan and the exotic Hong Kong as a British Colony. And the author returns to Japan 29 years later and gives an interesting comparison of his experiences and the differences that he observed between his first trip and the 1982 trip. The BRUSH was my first duty station after being commissioned in June 1951 until my transfer in November 1953. So I shared with the author the destroyer actions described. I was amazed that he was able to capture these events in so much detail and I enjoyed remembering the details of these events. Herbert O. Burton Captain, USN (Retired) North Carolina Three Years Aboard A Navy Destroyer is a marvelous account of the experience of the author as a young sailor during a period that few, since the days of World War II, have had the opportunity to share. While certainly many have sailed the seas, and some have encountered hostile action, this account fills the gap for those who have not had such an experience. Ted Holly communicates in the language of the sailor his experience that draws the reader into such that it is as if he (or she) is there. He captures the attention of the reader and presents an engaging account of the experiences of life aboard a 2200 ton vessel, which is missing all of the comforts of the cruise ship, from the periods of relative boredom to the periods of action with live ammunition. Rev. Ralph H. Spiller, Jr., PhD, LMHC CWO3, USN (Retired) Florida/Maine Ted Hollys book is remarkable at several levels. First, he treats a subject from his own experience that is not often considered life on an American destroyer during the Korean War. Further, he lends authenticity to his narrative through the painstaking process of obtaining and relying on the actual ships logs, day by day throughout his entire tenure aboard the USS Brush. Added to that, he, as a quartermaster, was well-placed to hear and see much of what was happening aboard the ship. Ted includes exhaustive details on some of the high points of the ships experience, the shell hit in Wonsan Harbor and the attack on the submarine as examples. Even for we who were aboard during much of the time covered in the book, some of the events were revelations. We either remembered them differently or not at all, or in less detail, but must defer to Teds account because of his reliance on the logs. Therefore, for any member of the crew during that period, Teds book is an enjoyable and enlightening read. Don Gordon RD 3/C, USN (Retired) North Carolina Great book! As a Destroyer Sailor aboard the USS DeHaven during the Korean War, I can testify Ted has written a fine book about his navy years aboard the USS Brush. If you are a navy destroyer sailor reading this book, then get ready to relive an exciting experience. I can recommend Teds book to anyone interested in ships, shipboard life, and even to one who has never been to sea. An outstanding experience. Bill Williams YN 2/C, USN (Retired) Florida

Book FIRE

    Book Details:
  • Author : Dan Ward
  • Publisher : Harper Collins
  • Release : 2014-04-29
  • ISBN : 0062301918
  • Pages : 162 pages

Download or read book FIRE written by Dan Ward and published by Harper Collins. This book was released on 2014-04-29 with total page 162 pages. Available in PDF, EPUB and Kindle. Book excerpt: Noted military technology expert Dan Ward's manifesto for creating great products and projects using the methods of rapid innovation. Why do some programs deliver their product under cost, while others bust their budget? Why do some deliver ahead of schedule, while others experience endless delays? Which products work better—the quick and thrifty or the slow and expensive? Which situation leads to superior equipment? With nearly two decades as an engineering officer in the U. S. Air Force, Dan Ward explored these questions during tours of duty at military research laboratories, the Air Force Institute of Technology, an intelligence agency, the Pentagon and Afghanistan. The pattern he noticed revealed that the most successful project leaders in both the public and private sectors delivered top-shelf products with a skeleton crew, a shoestring budget, and a cannonball schedule. Excessive investment of time, money, or complexity actually reduced innovation. He concluded the secret to innovation is to be fast, inexpensive, simple, and small. FIRE presents an entertaining and practical framework for pursuing rapid, frugal innovation. A story-filled blend of pop culture and engineering insight, FIRE has something for everyone: strategic concepts leaders can use as they cast a vision, actionable principles for managers as they make business decisions, and practical tools for workers as they design, build, assess and test new products.