EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Spent Nuclear Fuel Project Design Basis Capacity Study

Download or read book Spent Nuclear Fuel Project Design Basis Capacity Study written by and published by . This book was released on 1996 with total page 284 pages. Available in PDF, EPUB and Kindle. Book excerpt: A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

Book Spent Nuclear Fuel  SNF  Project Design Basis Capacity Study

Download or read book Spent Nuclear Fuel SNF Project Design Basis Capacity Study written by and published by . This book was released on 2000 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

Book Department of Energy s Hanford Spent Nuclear Fuel Project

Download or read book Department of Energy s Hanford Spent Nuclear Fuel Project written by United States. Congress. House. Committee on Commerce. Subcommittee on Oversight and Investigations and published by . This book was released on 1998 with total page 352 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book   fwer hans kongl  h  ghets hertig Adolph Fredrichs lyckeliga ankomst til Stockholm  den 14 octobris 1743  Stockholm  tryckt hos Peter J  r  Nystr  m

Download or read book fwer hans kongl h ghets hertig Adolph Fredrichs lyckeliga ankomst til Stockholm den 14 octobris 1743 Stockholm tryckt hos Peter J r Nystr m written by and published by . This book was released on 1743 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel Project Facilities

Download or read book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel Project Facilities written by and published by . This book was released on 1998 with total page 183 pages. Available in PDF, EPUB and Kindle. Book excerpt: Revisions 0 and 0A of this document provided estimated chemical and radionuclide inventories of spent nuclear fuel and sludge currently stored within the Hanford Sites̀ 105-K Basins. This Revision (Rev. 1) incorporates the following changes into Revision 0A: (1) updates the tables to reflect: improved cross section data, a decision to use accountability data as the basis for total Pu, a corrected methodology for selection of the heat generation basis fee, and a revised decay date; (2) adds section 3.3.3.1 to expand the description of the approach used to calculate the inventory values and explain why that approach yields conservative results; (3) changes the pre-irradiation braze beryllium value.

Book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel  SNF  Project Facilities VOL 1 Fuel

Download or read book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel SNF Project Facilities VOL 1 Fuel written by and published by . This book was released on 1999 with total page 162 pages. Available in PDF, EPUB and Kindle. Book excerpt: Metallic uranium Spent Nuclear Fuel (SNF) is currently stored within two water filled pools, 105-KE Basin (KE Basin) and 105-KW Basin (KW Basin), at the United States Department of Energy (U.S. DOE) Hanford Site, in southeastern Washington State. The Spent Nuclear Fuel Project (SNF Project) is responsible to DOE for operation of these fuel storage pools and for the 2100 metric tons of SNF materials that they contain. The SNF Project mission includes safe removal and transportation of all SNF from these storage basins to a new storage facility in the 200 East Area. To accomplish this mission, the SNF Project modifies the existing KE Basin and KW Basin facilities and constructs two new facilities: the 100 K Area Cold Vacuum Drying Facility (CVDF), which drains and dries the SNF; and the 200 East Area Canister Storage Building (CSB), which stores the SNF. The purpose of this document is to describe the design basis feed compositions for materials stored or processed by SNF Project facilities and activities. This document is not intended to replace the Hanford Spent Fuel Inventory Baseline (WHC 1994b), but only to supplement it by providing more detail on the chemical and radiological inventories in the fuel (this volume) and sludge. A variety of feed definitions is required to support evaluation of specific facility and process considerations during the development of these new facilities. Six separate feed types have been identified for development of new storage or processing facilities. The approach for using each feed during design evaluations is to calculate the proposed facility flowsheet assuming each feed. The process flowsheet would then provide a basis for material compositions and quantities which are used in follow-on calculations.

Book Department of Energy Study on Spent Nuclear Fuel Storage

Download or read book Department of Energy Study on Spent Nuclear Fuel Storage written by United States. Department of Energy and published by . This book was released on 1980 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Recueil factice d articles de presse concernant les acteurs chinois

Download or read book Recueil factice d articles de presse concernant les acteurs chinois written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Spent Nuclear Fuel Canister Storage Building Conceptual Design Report

Download or read book Spent Nuclear Fuel Canister Storage Building Conceptual Design Report written by and published by . This book was released on 1996 with total page 380 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Conceptual Design Report provides the technical basis for the Spent Nuclear Fuels Project, Canister Storage Building, and as amended by letter (correspondence number 9555700, M.E. Witherspoon to E.B. Sellers, T̀̀echnical Baseline and Updated Cost Estimate for the Canister Storage Building, ̀̀ dated October 24, 1995), includes the project cost baseline and Criteria to be used as the basis for starting detailed design in fiscal year 1995.

Book Spent Nuclear Fuel

Download or read book Spent Nuclear Fuel written by and published by . This book was released on 1980 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book The Future of Nuclear Fuel Cycle

Download or read book The Future of Nuclear Fuel Cycle written by and published by . This book was released on 2011 with total page 237 pages. Available in PDF, EPUB and Kindle. Book excerpt: "In this analysis we have presented a method that provides insight into future fuel cycle alternatives by clarifying the complexity of choosing an appropriate fuel cycle in the context of the distribution of burdens and benefits between generations. The current nuclear power deployment practices, together with three future fuel cycles were assessed."--Page 227.

Book Fundamental Issues Critical to the Success of Nuclear Projects

Download or read book Fundamental Issues Critical to the Success of Nuclear Projects written by Joseph Boucau and published by Woodhead Publishing. This book was released on 2021-10-23 with total page 394 pages. Available in PDF, EPUB and Kindle. Book excerpt: Fundamental Issues Critical to the Success of Nuclear Projects presents a complete analysis of the core considerations for those deploying nuclear power plants, managing existing plants, and also for those developing and building new plants. It includes critical considerations, such as cost-estimation, safety procedures, and regulatory compliance, manpower optimization and development, and the application of innovative technologies, such as the use of robotics. Those important issues have been addressed in a systematic way, and explanations have been provided on how the nuclear industry has continuously found solutions to mitigate and eventually solve them properly. - Discusses innovative technologies being implemented in international nuclear plants to improve efficiency, safety, and cost-effectiveness in new, existing, and decommissioned nuclear power plants - Provides guidance on difficult cost estimation for nuclear projects, as well as safety procedures, legislation, and regulatory compliance both inside and outside of the United States - Considers the future of nuclear energy and analyses the challenges ahead for a sustainable nuclear energy future

Book Critical Analysis of the Hanford Spent Nuclear Fuel Project Activity Based Cost Estimate

Download or read book Critical Analysis of the Hanford Spent Nuclear Fuel Project Activity Based Cost Estimate written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI's review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI's review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI's scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

Book Spent Nuclear Fuel Project  Project Management Plan

Download or read book Spent Nuclear Fuel Project Project Management Plan written by and published by . This book was released on 1995 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project.

Book Progress on the Hanford K Basins Spent Nuclear Fuel Project

Download or read book Progress on the Hanford K Basins Spent Nuclear Fuel Project written by and published by . This book was released on 1996 with total page 10 pages. Available in PDF, EPUB and Kindle. Book excerpt: This paper highlights progress made during the last year toward removing the Department of Energy's (DOE) approximately, 2,100 metric tons of metallic spent nuclear fuel from the two outdated K Basins at the Hanford Site and placing it in safe, economical interim dry storage. In the past year, the Spent Nuclear Fuel (SNF) Project has engaged in an evolutionary process involving the customer, regulatory bodies, and the public that has resulted in a quicker, cheaper, and safer strategy for accomplishing that goal. Development and implementation of the Integrated Process Strategy for K Basins Fuel is as much a case study of modern project and business management within the regulatory system as it is a technical achievement. A year ago, the SNF Project developed the K Basins Path Forward that, beginning in December 1998, would move the spent nuclear fuel currently stored in the K Basins to a new Staging and Storage Facility by December 2000. The second stage of this $960 million two-stage plan would complete the project by conditioning the metallic fuel and placing it in interim dry storage by 2006. In accepting this plan, the DOE established goals that the fuel removal schedule be accelerated by a year, that fuel conditioning be closely coupled with fuel removal, and that the cost be reduced by at least $300 million. The SNF Project conducted coordinated engineering and technology studies over a three-month period that established the technical framework needed to design and construct facilities, and implement processes compatible with these goals. The result was the Integrated Process Strategy for K Basins Fuel. This strategy accomplishes the goals set forth by the DOE by beginning fuel removal a year earlier in December 1997, completing it by December 1999, beginning conditioning within six months of starting fuel removal, and accomplishes it for $340 million less than the previous Path Forward plan.

Book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel Project Facilities  Volume 2

Download or read book 105 K Basin Material Design Basis Feed Description for Spent Nuclear Fuel Project Facilities Volume 2 written by and published by . This book was released on 1998 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: Volume 2 provides the design feed compositions for the baseline K East and K West Basin sludge process streams expected to be generated during Spent Nuclear Fuel (SNF) Project activities. Four types of feeds are required to support evaluation of specific facility and process considerations during the development of new facilities and processes. These four design feeds provide nominal and bounding conditions for design evaluations. Volume 2 includes definition of inventories for: (1) KE and KW Basins sludge locations (pit sludges, floor sludge, canister.sludge, and wash sludge components), (2) nominal feed for each of five process feed streams, (3) shielding design feed, (4) safety/regulatory assessment feed, and (5) criticality assessment feed.