EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Solar Total Energy Project  Shenandoah  Georgia Site

Download or read book Solar Total Energy Project Shenandoah Georgia Site written by and published by . This book was released on 1984 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project  Shenandoah  Georgia Site

Download or read book Solar Total Energy Project Shenandoah Georgia Site written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project  Shenandoah  Georgia Site

Download or read book Solar Total Energy Project Shenandoah Georgia Site written by and published by . This book was released on 1980 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project  Shenandoah  Georgia Site

Download or read book Solar Total Energy Project Shenandoah Georgia Site written by and published by . This book was released on 1980 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project  Shenandoah  Georgia Site

Download or read book Solar Total Energy Project Shenandoah Georgia Site written by E. J. Ney and published by . This book was released on 1982 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project Shenandoah

Download or read book Solar Total Energy Project Shenandoah written by and published by . This book was released on 1980 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document presents the description of the final design for the Solar Total Energy System (STES) to be installed at the Shenandoah, Georgia, site for utilization by the Bleyle knitwear plant. The system is a fully cascaded total energy system design featuring high temperature paraboloidal dish solar collectors with a 235 concentration ratio, a steam Rankine cycle power conversion system capable of supplying 100 to 400 kW(e) output with an intermediate process steam take-off point, and a back pressure condenser for heating and cooling. The design also includes an integrated control system employing the supervisory control concept to allow maximum experimental flexibility. The system design criteria and requirements are presented including the performance criteria and operating requirements, environmental conditions of operation; interface requirements with the Bleyle plant and the Georgia Power Company lines; maintenance, reliability, and testing requirements; health and safety requirements; and other applicable ordinances and codes. The major subsystems of the STES are described including the Solar Collection Subysystem (SCS), the Power Conversion Subsystem (PCS), the Thermal Utilization Subsystem (TUS), the Control and Instrumentation Subsystem (CAIS), and the Electrical Subsystem (ES). Each of these sections include design criteria and operational requirements specific to the subsystem, including interface requirements with the other subsystems, maintenance and reliability requirements, and testing and acceptance criteria. (WHK).

Book The Shenandoah Solar Total Energy Project

Download or read book The Shenandoah Solar Total Energy Project written by James A. Leonard and published by . This book was released on 1982 with total page 15 pages. Available in PDF, EPUB and Kindle. Book excerpt: The design and construction of the world's first solar total energy plant in the private sector has been completed and checkout is underway. The project, a major element of the Department of Energy's Solar Thermal Program, is the Solar Total Energy Project at Shenandoah, Georgia. During its operational phase, the solar plant will furnish electrical power, process steam, and other thermal energy to a nearby knitwear factory. The solar system consists of a collector field containing 114 parabolic dish collectors which supply thermal energy at 400° C to drive a 400 kW multi-stage Rankine cycle turbine generator. Some steam is extracted from the turbine and supplied to the knitwear manufacturing processes. The system will be grid-connected, and the Georgia Power Company, through a cooperative agreement with DOE, is a participant in the project. The report contains: (1) a description of the system and components being installed; (2) a summary of performance testing of the extraction turbine and of four prototype parabolic dish collectors; and (3) a discussion of design considerations and insights which have general applicability to solar thermal system designs.

Book Solar Total Energy large Scale Epperiment  sic  Shenandoah  Georgia Site

Download or read book Solar Total Energy large Scale Epperiment sic Shenandoah Georgia Site written by and published by . This book was released on 1978 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Reliability Analysis of the Solar Total Energy Project  STEP   Shenandoah  Georgia

Download or read book Reliability Analysis of the Solar Total Energy Project STEP Shenandoah Georgia written by William Hall Schneider and published by . This book was released on 1987 with total page 148 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project Summary Description

Download or read book Solar Total Energy Project Summary Description written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Solar Total Energy Project (STEP) at Shenandoah, GA is described. A summary description of the energy system, its location, and the project site are presented. The system is further described including design criteria and requirements, performance criteria, and operating requirements. The major subsystems of the STEP--the Solar Collection Subsystem (SCS), the Power Conversion Subsystem (PCS), the Thermal Utilization Subsystem (TUS), the Control and Instrumentation Subsystem (CAIS), and the Electrical Subsystem (ES)--are described, including their major components. Specific features of the control and instrumentation provisions for the system and subsystem operational modes are also described and the costs of construction presented.

Book Solar Energy Update

Download or read book Solar Energy Update written by and published by . This book was released on 1984 with total page 884 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Energy Conversion

Download or read book Solar Energy Conversion written by and published by . This book was released on 1980 with total page 474 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Solar Total Energy Project Final Test Report

Download or read book Solar Total Energy Project Final Test Report written by Robert F. Nelson and published by . This book was released on 1990 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Solar Total Energy Project (STEP), a cooperative effort between the United States Department of Energy (DOE) and Georgia Power Company (GPC) located at Shenandoah, Georgia, has undergone several design modifications based on experience from previous operations and test programs. The experiences encountered were discussed in detail in the Solar Total Energy Project Summary Report'' completed in 1987 for DOE. Most of the proposed changes discussed in this report were installed and tested in 1987 as part of two 15-day test programs (SNL Contract No. 06-3049). However, several of the suggested changes were not completed before 1988. These plant modifications include a new distributed control system for the balance of plant (BOP), a fiber a optical communications ring for the field control system, and new control configuration reflecting the new operational procedures caused by the plant modifications. These modifications were tested during a non-consecutive day test, and a 60-day field test conducted during the autumn of 1989. These test were partially funded by SNL under Contract No. 42-4859, dated June 22, 1989. Results of these tests and preliminary analysis are presented in this test summary report.

Book Solar Total Energy

    Book Details:
  • Author :
  • Publisher :
  • Release : 1979
  • ISBN :
  • Pages : pages

Download or read book Solar Total Energy written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: A background summary and a complete description of the progress and current status of activities relative to the Cooperative Agreement for the Solar Total Energy - Large Scale Experiment at the Bleyle Knitwear Plant at Shenandoah, Georgia are presented. A statement of objectives and an abstract of progress to date are included. This is followed by a short introduction containing a project overview, a summary of the participants and their respective roles, a brief description of the Solar Total Energy System (STES) design concept, and a chronological summary of progress to date. A general description of the site is given, a detailed report of progress is reported, and drawings and equipment lists are included. The closed-loop solar energy system planned for Shenandoah begins with circulation of Syltherm 800, a heat transfer fluid of the Dow-Corning Corporation, through the receiver tubes of a parabolic dish solar collector field. As solar energy is focused on the receivers, the heat transfer fluid is heated to approximately 399°C (750°F) and is pumped to a heat exchanger for immediate use, or to a thermal storage system for later use. Once in the heat exchanger, the fluid heats a working fluid that produces the steam required for operating the turbine. After performing this task, the heat transfer fluid returns to the collectors to repeat the cycle, while the steam turbine-generator system supplies the electrical demands for the knitwear plant and the STES. During STES operation, maximum thermal and electrical requirements of the application are expected to be at 1.08 MWth and 161 kWe, respectively. During the power generation phase, some of the steam is extracted for use as process steam in the knitwear manufacturing process, while exhaust steam from the turbine is passed through a condenser to produce hot water for heating, domestic use, and absorption air conditioning. (WHK).

Book Solar Total Energy System  Large Scale Experiment  Shenandoah  Georgia  Final Technical Progress Report  Volume II  Section 3  Facility Concept Design   1  72 MW Thermal and 383  6 KW Electric Power for 42 000 Ft2 Knitwear Plant

Download or read book Solar Total Energy System Large Scale Experiment Shenandoah Georgia Final Technical Progress Report Volume II Section 3 Facility Concept Design 1 72 MW Thermal and 383 6 KW Electric Power for 42 000 Ft2 Knitwear Plant written by and published by . This book was released on 1977 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Stearns-Roger Engineering Company conceptual design of ERDA's Large Scale Experiment No. 2 (LSE No. 2) is presented. The various LSEs are part of ERDA's Solar Total Energy Program (STES) and a separate activity of the National Solar Thermal Power Systems Program. The object of this LSE is to design, construct, test, evaluate and operate a STES for the purpose of obtaining experience with large scale hardware systems and to establish engineering capability for subsequent demonstration projects. This particular LSE is to be located at Shenandoah, Georgia, and will provide power to the Bleyle knitwear factory. The Solar Total Energy system is sized to supply 1.720 MW thermal power and 383.6 KW electrical power. The STES is sized for the extended knitwear plant of 3902 M2 (42,000 sq-ft) which will eventually employ 300 people. The details of studies conducted for Phase II of the Solar Total Energy System (STES) for the conceptual design requirements of the facility are presented. Included in this section are the detailed descriptions and analyses of the following subtasks: facility concept design, system concept design, performance analysis, operation plan, component and subsystem development, procurement plan, cost estimating and scheduling, and technical and management plans. (WHK).