EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Remedial Investigation Report Primary Area  OU 1  Oversized Figures

Download or read book Remedial Investigation Report Primary Area OU 1 Oversized Figures written by ABB Environmental Services and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Environmental Law Reporter

Download or read book Environmental Law Reporter written by and published by . This book was released on 1998 with total page 608 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Draft

Download or read book Final Draft written by and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Addendum to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2  Rust Spoil Area  Spoil Area 1  and SY 200 Yard  at the Oak Ridge Y 12 Plant Oak Ridge  Tennessee  Volume 1  Main Text

Download or read book Addendum to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2 Rust Spoil Area Spoil Area 1 and SY 200 Yard at the Oak Ridge Y 12 Plant Oak Ridge Tennessee Volume 1 Main Text written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This addendum to the Remedial Investigation (RI) Report on Bear Creek Valley Operable Unit (OU) 2 at the Oak Ridge Y-12 Plant was prepared in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for reporting the results of a site characterization for public review. This addendum is a supplement to a document that was previously issued in January 1995 and that provided the Environmental Restoration Program with information about the results of the 1993 investigation performed at OU 2. The January 1995 D2 version of the RI Report on Bear Creek Valley OU 2 included information on risk assessments that have evaluated impacts to human health and the environment. Information provided in the document formed the basis for the development of the Feasibility Study Report. This addendum includes revisions to four chapters of information that were a part of the document issued in January 1995. Specifically, it includes revisions to Chaps. 2, 3, 4, and 9. Volume 1 of this document is not being reissued in its entirety as a D3 version because only the four chapters just mentioned have been affected by requested changes. Note also that Volume 2 of this RI Report on Bear Creek Valley OU 2 is not being reissued in conjunction with Volume 1 of this document because there have been no changes requested or made to the previously issued version of Volume 2 of this document.

Book Remedial Investigation Report Area of Contamination  AOC  43G

Download or read book Remedial Investigation Report Area of Contamination AOC 43G written by and published by . This book was released on 1996 with total page 349 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Report  Presidio Main Installation  Presidio of San Francisco  Volume 1  Text

Download or read book Remedial Investigation Report Presidio Main Installation Presidio of San Francisco Volume 1 Text written by and published by . This book was released on 1997 with total page 1196 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dames and Moore has conducted a Remedial Investigation (RI) of the Presidio of San Francisco (PSF), CA. The objectives of the RI included the determination of the nature and extent of contamination of PSF and to quantify both the human health and ecological risk posed by that contamination. The report concludes that, in general, the Presidio does not pose a significant risk to either human health or the environment. There are, however, a number of locations where elevated risks are present. The remedial actions to abate those risks will be identified in a follow-on document called the "Presidio Main Installation, Feasibility Study."

Book Remedial Investigation Report  Volume 6  Southern Study Area  Sections 1 0  2 0  and 3 0 Text  Version 3 3

Download or read book Remedial Investigation Report Volume 6 Southern Study Area Sections 1 0 2 0 and 3 0 Text Version 3 3 written by and published by . This book was released on 1989 with total page 255 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the Southern Study Area (SSA) Report is to present the Army's Remedial Investigation (RI) results for the southern portion of Rocky Mountain Arsenal (RMA). This document is a formal RI product in accordance with the proposed Federal Facilities Agreement and Settlement Agreement (1988), the RMA Technical Program Plan (TPP) (PMO, 1988/RIC 88131R01), and the June 1985 U.S. Environmental Protection Agency (EPA) RI Guidance Document. The seven completed RI Study Area Reports (SARs), along with the RI media reports for air, biota, buildings, and water, fulfill the requirements of defining the nature and extent of contamination, and completing a comprehensive RI for the On-post Operable Unit of RMA as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the Superfund Amendments and Reauthorization Act (SARA), and the National Contingency Plan (NCP). The SSA report integrates known historical information, the results of previous investigations, and the current RI programs for buildings, soil, surface water, groundwater, biota, and air to present an overall environmental contamination assessment of the study area as required under Contract Numbers DAAA15-88-D- 0024. The SSA Report represents Volume VI of the overall RMA Remedial Investigation.

Book Remedial Investigation Report  Presidio Main Installation  Presidio of San Francisco  Volume 3  Figures Sections 1 5

Download or read book Remedial Investigation Report Presidio Main Installation Presidio of San Francisco Volume 3 Figures Sections 1 5 written by and published by . This book was released on 1997 with total page 502 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dames and Moore has conducted a Remedial Investigation (RI) of the Presidio of San Francisco (PSF), CA. The objectives of the RI included the determination of the nature and extent of contamination of PSF and to quantify both the human health and ecological risk posed by that contamination. The report concludes that, in general, the Presidio does not pose a significant risk to either human health or the environment. There are, however, a number of locations where elevated risks are present. The remedial actions to abate those risks will be identified in a follow-on document called the "Presidio Main Installation, Feasibility Study."

Book Remedial Investigation Report  Volume 7  Eastern Study Area  Section 1  0  Version 3 2

Download or read book Remedial Investigation Report Volume 7 Eastern Study Area Section 1 0 Version 3 2 written by and published by . This book was released on 1989 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Eastern Study Area (ESA) Report summarizes a portion of the Remedial Investigation (RI) conducted at Rocky Mountain Arsenal (RMA). This report, Volume VII of the On-Post RI, integrates the study area history, geology, and hydrology with the results from soil, surface water, groundwater, air, biota, and structures investigations to identify contaminant sources, distribution patterns, and migration pathways. The ESA encompasses approximately 10 square miles on the eastern tier of RMA, and includes all of Sections 5, 19, 20, 30, 31, and 32 and portions of Sections 6, 7, 8, 20, 24, and 25. The ESA shares information along the western boundary from five adjacent study areas, including the Southern, South Plants, Central, North Plants, and North Central Study Areas. The boundaries of the ESA were chosen to delineate an area which is east of the primary manufacturing and disposal facilities on RMA. As the boundaries are drawn, no groundwater contaminant plumes are identified within the ESA, and the entire length of First Creek within RMA boundaries is in the ESA.

Book Remedial Investigation Report

Download or read book Remedial Investigation Report written by Hazardous Waste Remedial Actions Program (U.S.) and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Brief van A  Klette aan Willem George Pluygers  1812 1880

Download or read book Brief van A Klette aan Willem George Pluygers 1812 1880 written by and published by . This book was released on 1874 with total page 353 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation Work Plan for Bear Creek Valley Operable Unit 1  S 3 Ponds  Boneyard Burnyard  Oil Landfarm  Sanitary Landfill 1  and the Burial Grounds  Including Oil Retention Ponds 1 and 2  at the Oak Ridge Y 12 Plant  Oak Ridge  Tennessee  Volume 1  Main Text

Download or read book Remedial Investigation Work Plan for Bear Creek Valley Operable Unit 1 S 3 Ponds Boneyard Burnyard Oil Landfarm Sanitary Landfill 1 and the Burial Grounds Including Oil Retention Ponds 1 and 2 at the Oak Ridge Y 12 Plant Oak Ridge Tennessee Volume 1 Main Text written by and published by . This book was released on 1993 with total page 452 pages. Available in PDF, EPUB and Kindle. Book excerpt: The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Book Remedial Investigation Report  Presidio Main Installation  Presidio of San Francisco  Volume 6  Appendices A F

Download or read book Remedial Investigation Report Presidio Main Installation Presidio of San Francisco Volume 6 Appendices A F written by and published by . This book was released on 1997 with total page 428 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dames and Moore has conducted a Remedial Investigation (RI) of the Presidio of San Francisco (PSF), CA. The objectives of the RI included the determination of the nature and extent of contamination of PSF and to quantify both the human health and ecological risk posed by that contamination. The report concludes that, in general, the Presidio does not pose a significant risk to either human health or the environment. There are, however, a number of locations where elevated risks are present. The remedial actions to abate those risks will be identified in a follow-on document called the "Presidio Main Installation, Feasibility Study."

Book Remedial Investigation Report  Presidio Main Installation  Presidio of San Francisco  Volume 5  Figures 7 15

Download or read book Remedial Investigation Report Presidio Main Installation Presidio of San Francisco Volume 5 Figures 7 15 written by and published by . This book was released on 1997 with total page 785 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dames and Moore has conducted a Remedial Investigation (RI) of the Presidio of San Francisco (PSF), CA. The objectives of the RI included the determination of the nature and extent of contamination of PSF and to quantify both the human health and ecological risk posed by that contamination. The report concludes that, in general, the Presidio does not pose a significant risk to either human health or the environment. There are, however, a number of locations where elevated risks are present. The remedial actions to abate those risks will be identified in a follow-on document called the "Presidio Main Installation, Feasibility Study."

Book Supplemental Remedial Investigation Report Area 2

Download or read book Supplemental Remedial Investigation Report Area 2 written by and published by . This book was released on 2015 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book

    Book Details:
  • Author :
  • Publisher :
  • Release : 1972
  • ISBN :
  • Pages : 121 pages

Download or read book written by and published by . This book was released on 1972 with total page 121 pages. Available in PDF, EPUB and Kindle. Book excerpt: