EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock  Colorado

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock Colorado written by and published by . This book was released on 1995 with total page 400 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC {section}7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management.

Book Remedial Action and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock  Colorado  Attachment 4  Water Resources Protection Strategy

Download or read book Remedial Action and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock Colorado Attachment 4 Water Resources Protection Strategy written by and published by . This book was released on 1993 with total page 25 pages. Available in PDF, EPUB and Kindle. Book excerpt: To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to apply supplemental standards for Class III (limited use) groundwater because of low yield [less than 150 gallons per day (gpd) (7 x 10−3 liters per second (L/s))] in the uppermost aquifer (upper sandstone unit of the Burro Canyon Formation). Groundwater in the uppermost aquifer is not a current or potential source of drinking water because of the aquifer's low yield. As a result, the proposed remedial action will ensure protection of human health and the environment.

Book Remedial Action Plan and Site Development Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock  Colorado  Attachment 4  Water Resources Protection Strategy

Download or read book Remedial Action Plan and Site Development Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock Colorado Attachment 4 Water Resources Protection Strategy written by and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock  Colorado  Attachment 3  Ground Water Hydrology Report

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock Colorado Attachment 3 Ground Water Hydrology Report written by and published by . This book was released on 1994 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent ground water contamination resulting from processing activities at inactive uranium milling sites (52 FR 36000 (1987)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, 42 USC {section}7901 et seq., the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined that for Slick Rock, this assessment shall include hydrogeologic site characterization for two separate uranium processing sites, the Union Carbide (UC) site and the North Continent (NC) site, and for the proposed Burro Canyon disposal site. The water resources protection strategy that describes how the proposed action will comply with the EPA ground water protection standards is presented in Attachment 4. The following site characterization activities are discussed in this attachment: Characterization of the hydrogeologic environment, including hydrostratigraphy, ground water occurrence, aquifer parameters, and areas of recharge and discharge. Characterization of existing ground water quality by comparison with background water quality and the maximum concentration limits (MCL) of the proposed EPA ground water protection standards. Definition of physical and chemical characteristics of the potential contaminant source, including concentration and leachability of the source in relation to migration in ground water and hydraulically connected surface water. Description of local water resources, including current and future use, availability, and alternative supplies.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Reglement f  r die Bernische Akademie

Download or read book Reglement f r die Bernische Akademie written by and published by . This book was released on 1807 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock  Colorado

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock Colorado written by and published by . This book was released on 1995 with total page 400 pages. Available in PDF, EPUB and Kindle. Book excerpt: This volume contains calculations for: Slick Rock processing sites background ground water quality; Slick Rock processing sites lysimeter water quality; Slick Rock processing sites on-site and downgradient ground water quality; Slick Rock disposal site background water quality; Burro Canyon disposal site, Slick Rock, Colorado, average hydraulic gradients and average liner ground water velocities in the upper, middle, and lower sandstone units of the Burro Canyon formation; Slick Rock--Burro Canyon disposal site, Burro Canyon pumping and slug tests--analyses; water balance and surface contours--Burro Canyon disposal cell; and analytical calculation of drawdown in a hypothetical well completed in the upper sandstone unit of the Burro Canyon formation.

Book Radioactive Waste Management

Download or read book Radioactive Waste Management written by and published by . This book was released on 1981 with total page 536 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman  Idaho  Attachment 4  Water Resources Protection Strategy

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman Idaho Attachment 4 Water Resources Protection Strategy written by and published by . This book was released on 1991 with total page 29 pages. Available in PDF, EPUB and Kindle. Book excerpt: The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1996-03 with total page 1318 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Processing Site at Naturita  Colorado  Appendix B of Attachment 3

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Processing Site at Naturita Colorado Appendix B of Attachment 3 written by and published by . This book was released on 1994 with total page 329 pages. Available in PDF, EPUB and Kindle. Book excerpt: Attachment 3 Groundwater Hydrology Report describes the hydrogeology, water quality, and water resources at the processing site and Dry Flats disposal site. The Hydrological Services calculations contained in Appendix A of Attachment 3, are presented in a separate report. Attachment 4 Water Resources Protection Strategy describes how the remedial action will be in compliance with the proposed EPA groundwater standards.

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Processing Site at Naturita  Colorado  Remedial Action Selection Report  Attachment 2  Geology Report

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Processing Site at Naturita Colorado Remedial Action Selection Report Attachment 2 Geology Report written by and published by . This book was released on 1993 with total page 179 pages. Available in PDF, EPUB and Kindle. Book excerpt: The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

Book INIS Atomindex

Download or read book INIS Atomindex written by and published by . This book was released on 1995 with total page 640 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat  Utah

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat Utah written by and published by . This book was released on 1988 with total page 137 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A, B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.