EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book RCRA Corrective Action Technical Memorandum No  3  Ground Water Monitoring  Vernay Laboratories  Inc   Plant 2 3 Facility  Yellow Springs  Ohio

Download or read book RCRA Corrective Action Technical Memorandum No 3 Ground Water Monitoring Vernay Laboratories Inc Plant 2 3 Facility Yellow Springs Ohio written by David C. Contant and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "In the September 27, 2002 Administrative Order on Consent between the US EPA and Vernay Laboratories, Inc., it was agreed that Vernay would prepare a Ground Water Monitoring Technical Memorandum. This Ground Water Monitoring Technical Memorandum ... includes the results of the quarterly ground water monitoring events, an evaluation of the efficacy of the ongoing ground water interim measures, well construction documentation, and ground water potentiometric surface depictions. It also includes an update of the conceptual site hydrogeologic model for the Facility and surrounding area that was initially presented in the November 2002 Current Conditions Report, and identifies additional data that is needed to complete the Phase I Facility Investigation."--Executive Summary, p. 1.

Book U S  EPA Resource Conservation and Recovery Act Corrective Action Facility Investigation Phase II Report

Download or read book U S EPA Resource Conservation and Recovery Act Corrective Action Facility Investigation Phase II Report written by David C. Contant and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "In the September 27, 2002 Administrative Order on Consent (Corrective Action Order) between the United States Environmental Protection Agency (U.S. EPA) and Vernay Laboratories, Inc. (Vernay), it was agreed that Vernay would conduct a Resource Conservation and Recovery Act (RCRA) Corrective Action Facility Investigation (RFI) to determine the nature and extent of any releases of hazardous waste and hazardous constituents at or from its facility located at 875 Dayton Street, Yellow Springs, Ohio (Facility), which may pose an unacceptable risk to human health and the environment ... This report documents the results of Phase II of the RFI that Vernay conducted at the Facility and supplements the Phase I RFI ... that was completed on June 29, 2004 ... Phase II of the RFI focused on completing the characterization of the nature and extent of contamination in soil, assessing the fate and transport of contaminants detected in the Cedarville Aquifer, and assessing the potential site-related human health and the environment risks associated with current and reasonably likely exposures to the contaminated media. Information presented in the Phase I and Phase II RFI reports will be used to complete the Migration of Contaminated Ground Water Under Control (CA750) report, and to evaluate corrective measures needed to mitigate potentially unacceptable risks associated with releases of hazardous waste and hazardous substances detected at and in the vicinity of the Facility."--Executive Summary, p. i-ii.

Book U S  EPA RCRA Corrective Action  Draft Corrective Measures Proposal

Download or read book U S EPA RCRA Corrective Action Draft Corrective Measures Proposal written by and published by . This book was released on 2009 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: "The Payne Firm, Inc. (Payne Firm), ENVIRON International Corporation (Environ), and Mr. David Back have prepared this Resource Conservation and Recovery ACT (RCRA), Corrective Measures Proposal (CMP) on behalf of Vernay Laboratories, Inc. (Vernay). This CMP report was prepared to fulfill requirements agreed to under Paragraph 19 of the United States Environmental Protection Agency (U.S. EPA) Administrative Order on Consent (Consent Order) for the Vernay former Plant 2/3 Facility (Facility) located at 875 Dayton Street in the Village of Yellow Springs, Ohio ... The Consent Order, effective September 27, 2002, is a streamlined RCRA order in which Vernay agrees to take corrective remedial measures necessary to protect human health and the environment from all current and future unacceptable risks due to releases of hazardous waste or hazardous constituents at or from the Facility ... Manufacturing operations ceased at the Facility by 2005 and the plant buildings were demolished in early 2009. Volatile organic compounds (VOCs) ... have been detected in soil (on-property) and in a carbonate bedrock aquifer located beneath the property and in an area east of the property ... The Draft CMP describes the evaluation of corrective measures alternatives for soil and ground water at the Site, and identifies the proposed corrective measures based on this analysis."--Introduction, p. 1.

Book U S  EPA RCRA Corrective Action  Draft Corrective Measures Proposal

Download or read book U S EPA RCRA Corrective Action Draft Corrective Measures Proposal written by David Back and published by . This book was released on 2009 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: "The Payne Firm, Inc. (Payne Firm), ENVIRON International Corporation (Environ), and Mr. David Back have prepared this Resource Conservation and Recovery ACT (RCRA), Corrective Measures Proposal (CMP) on behalf of Vernay Laboratories, Inc. (Vernay). This CMP report was prepared to fulfill requirements agreed to under Paragraph 19 of the United States Environmental Protection Agency (U.S. EPA) Administrative Order on Consent (Consent Order) for the Vernay former Plant 2/3 Facility (Facility) located at 875 Dayton Street in the Village of Yellow Springs, Ohio.... The Consent Order, effective September 27, 2002, is a streamlined RCRA order in which Vernay agrees to take corrective remedial measures necessary to protect human health and the environment from all current and future unacceptable risks due to releases of hazardous waste or hazardous constituents at or from the Facility.... Manufacturing operations ceased at the Facility by 2005 and the plant buildings were demolished in early 2009. Volatile organic compounds (VOCs) ... have been detected in soil (on-property) and in a carbonate bedrock aquifer located beneath the property and in an area east of the property.... The Draft CMP describes the evaluation of corrective measures alternatives for soil and ground water at the Site, and identifies the proposed corrective measures based on this analysis."--Introduction, p. 1.

Book U S  EPA RCRA Corrective Action Facility Investigation Phase I Report

Download or read book U S EPA RCRA Corrective Action Facility Investigation Phase I Report written by David C. Contant and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "In the September 27, 2002 Administrative Order on Consent (Corrective Action Order) between the United States Environmental Protection Agency (U.S. EPA) and Vernay Laboratories, Inc. (Vernay), it was agreed that Vernay would conduct a Resource Conservation and Recovery Act (RCRA) Corrective Action Facility Investigation (RFI) to determine the nature and extent of any releases of hazardous waste and hazardous constituents at or from its facility located at 875 Dayton Street, Yellow Springs, Ohio (Facility), which may pose an unacceptable risk to human health and the environment ... This report documents the results of Phase I of the RFI that Vernay conducted at the Facility ... This information will be used to evaluate corrective measures needed to remediate the contamination."--Executive Summary, p. i.

Book Resource Conservation and Recovery Act CA750 Environmental Indicators Report

Download or read book Resource Conservation and Recovery Act CA750 Environmental Indicators Report written by David Bishop Back and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "This Resource Conservation and Recovery Act (RCRA) Migration of Contaminated Ground Water Under Control Environmental Indicators (EI) Report was was prepared to fulfill the requirements ... of the Administrative Order on Consent (Corrective Action Order) for the Vernay Facility ... Vernay has prepared this CA750 EI report based on comments received during teleconference meetings with the U.S. EPA on July 20 and 21, 2006 relating to the draft CA750 report submitted on April 11, 2006. This EI Report evaluates and discusses information that was relied on to support the RCRA CA750 determination. Based on this information and no evidence of an expanding area of contamination based on perimeter monitoring well results, it is determined that the migration of contaminated ground water is under control on and off of the property."--Executive summary, p. 1-2.

Book Progress Report  Fourth Quarter 2002

Download or read book Progress Report Fourth Quarter 2002 written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "Vernay Laboratories, Inc. (Vernay) is under a 3008(h) Administrative Order on Consent (AOC), journalized September 27, 2002, to complete a United States Environmental Protection Agency (US EPA) Resource Conservation and Recovery Act (RCRA) Corrective Action for the Vernay Facility located at 875 Dayton Street in Yellow Springs, Ohio."--p. 1. This Progress Report for the fourth quarter of 2002 was submitted "as required by the Administrative Order on Consent journalized by the United States Environmental Protection Agency on September 27, 2002."--cover letter. "Data associated with the existing ground water interim measure was collected. This data includes water level elevations from the Facility monitoring well network and water samples from the ground water treatment systems. A summary of this data is presented in the attached tables; a copy of the analytical laboratory reports for the treatment system sampling is also attached."--p. 1.

Book EHS Technology Group s Review Dated September 26  2005 of the U S  EPA RCRA Phase II RFI Report  Vernay Laboratories  Inc   Plant 2 3 Facility  Yellow Springs  Ohio  Prepared by the Payne Firm and Dated December 20  2004

Download or read book EHS Technology Group s Review Dated September 26 2005 of the U S EPA RCRA Phase II RFI Report Vernay Laboratories Inc Plant 2 3 Facility Yellow Springs Ohio Prepared by the Payne Firm and Dated December 20 2004 written by EHS Technology Group and published by . This book was released on 2005 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Resource Conservation and Recovery Act CA725 Environmental Indicators Report

Download or read book Resource Conservation and Recovery Act CA725 Environmental Indicators Report written by ENVIRON International Corporation and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: "This Resource Conservation and Recovery Act (RCRA) Current Human Exposures Environmental Indicators (EI) Report was prepared to fulfill provisions ... of the Administrative Order on Consent (Order) for the Vernay Facility ... This EI Report evaluates and discusses information that is pertinent to the RCRA CA725 determination, and includes data collected during the Phase I Facility Investigation and from prior investigations that were summarized in the Facility Current Conditions Report. Based on these data, and a consideration of potential exposure pathways and site-specific conditions, current human exposures are determined to be under control according to the provisions of CA725"--Executive summary, p. ES-1.

Book RCRA Ground water Monitoring Enforcement Guidance

Download or read book RCRA Ground water Monitoring Enforcement Guidance written by United States. Office of Waste Programs Enforcement and published by . This book was released on 1985 with total page 438 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Attachment

Download or read book Attachment written by and published by . This book was released on 2020 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book RCRA Ground Water Monitoring

Download or read book RCRA Ground Water Monitoring written by U.S. Environmental Protection Agency, Office of Solid Waste and published by . This book was released on 1994 with total page 250 pages. Available in PDF, EPUB and Kindle. Book excerpt: The standards set forth in subpart F of the hazardous waste management regulations for permitted facilities requires owners and operators to sample ground water at specific time intervals to determine whether or not hazardous wastes are causing contamination. This manual provides guidance for implementation of the standards and covers such issues as site hydrology, detection monitoring system design, well design and construction, and sampling and analysis.

Book RCRA Corrective Action Cleanup Program

    Book Details:
  • Author : United States. Congress. House. Committee on Commerce. Subcommittee on Commerce, Trade, and Hazardous Materials
  • Publisher :
  • Release : 1995
  • ISBN :
  • Pages : 88 pages

Download or read book RCRA Corrective Action Cleanup Program written by United States. Congress. House. Committee on Commerce. Subcommittee on Commerce, Trade, and Hazardous Materials and published by . This book was released on 1995 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book RCRA Corrective Action Permit Requirements and Modifications Under Subpart F Regulations  RCRA Information Brief

Download or read book RCRA Corrective Action Permit Requirements and Modifications Under Subpart F Regulations RCRA Information Brief written by and published by . This book was released on 1993 with total page 2 pages. Available in PDF, EPUB and Kindle. Book excerpt: The ground water protection requirements under the Resource Conservation and Recovery Act (RCRA), 40 CFR 264, Subpart F, apply to surface impoundments, waste plies, land treatment units, and landfills that received hazardous waste after July 26,1982 (i.e., regulated units). There are three phases to the Subpart F ground water protection requirements: detection monitoring, compliance monitoring, and corrective action. Subpart F corrective action applies to remediation of ground water contamination resulting from releases from regulated units at a treatment, storage, or disposal facility (TSDF). The TSDF owner or operator is responsible for complying with these requirements. This Information Brief provides information on the permit requirements under Subpart F. This Information Brief is one of a series on RCRA corrective action. The first step in the permitting process is for the facility to determine the need for ground-water monitoring. The regulations found in 40 CFR 264 Sections 264.90 to 264.100 (Subpart F) apply to all regulated units. A ''regulated unit'' is defined as a surface impoundment, waste pile, landfill, or land treatment unit that received hazardous waste after July 26, 1982. Such units require a permit under RCRA. Subpart F entails a three-phased program designed to detect, evaluate, and, if necessary, respond to ground water contamination. The ground-water protection standard, including identification of maximum contaminant levels (MCLs) under the Safe Drinking Water Act (SDWA) and alternate concentration limits (ACLs), is established with the permit application. Where MCLs and ACLs cannot be established, the standard may be established at background levels.

Book Results of RCRA Groundwater Quality Assessment at the 216 B 3 Pond Facility

Download or read book Results of RCRA Groundwater Quality Assessment at the 216 B 3 Pond Facility written by Douglas B. Barnett and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: