EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Radioactive Air Emissions Notice of Construction for Installation and Operation of a Waste Retrieval System and Tanks 241 AP 102 and 241 AP 104 Project

Download or read book Radioactive Air Emissions Notice of Construction for Installation and Operation of a Waste Retrieval System and Tanks 241 AP 102 and 241 AP 104 Project written by and published by . This book was released on 1999 with total page 166 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)(1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance of the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.

Book Radioactive Air Emissions Notice of Construction for the Installation and Operation of a Waste Retrieval System in Tanks 241 AP 102 and 241 AP 104  Project W 211

Download or read book Radioactive Air Emissions Notice of Construction for the Installation and Operation of a Waste Retrieval System in Tanks 241 AP 102 and 241 AP 104 Project W 211 written by United States. Department of Energy. Office of River Protection and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Radioactive Air Emissions Notice of Construction Application for Installation and Operation of a Waste Retrieval System in Tanks 241 AN 101

Download or read book Radioactive Air Emissions Notice of Construction Application for Installation and Operation of a Waste Retrieval System in Tanks 241 AN 101 written by and published by . This book was released on 2000 with total page 124 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61.07, for the installation and operation of one waste retrieval system in each of the following tanks; 241-AN-101, -AN-102, -AN-103, -AN-104, -AN-105 and -AN-107. Pursuant to 40 CFR 61.09 (aXI), this application is also intended to provide anticipated initial start-up notification. It is requested that EPA approval of this application will also constitute EPA acceptance of the initial start-up notification. This NOC covers the installation and operation o f a waste retrieval system in tanks 241-AN-101, -AN-102, -AN-103, -AN-104, -AN-105 and -AN-107, and the 241-AN-A/-B Valve Pits. Generally, this includes removal of existing equipment, installation of new equipment, and construction of new ancillary equipment and buildings between now and the year2011. Tanks 241-AN-101, -AN-102, -AN-103, -AN-104, -AN-105 and -AN-107 will provide waste feed for immobilization into a low activity waste (LAW) product.

Book Nonradioactive Air Emissions Notice of Construction  Project W 320  241 C 106 Tank Sluicing

Download or read book Nonradioactive Air Emissions Notice of Construction Project W 320 241 C 106 Tank Sluicing written by and published by . This book was released on 1998 with total page 38 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as a Notice of Construction for the Phase 2 activities of Project W-320, 241-C-106 Tank Sluicing, pursuant to the requirements of Washington Administrative Codes (WAC) 173-400 and 173-460. Phased permitting for Project W-320 was discussed with the Washington State Department of Ecology (Ecology) on November 2, 1993. In April 1994, it was deemed unnecessary because the Phase 1 activities did not constitute a new source of emissions and therefore did not require approval from Ecology. The 241-C-106 tank is a 2-million liter capacity, single-shell tank (SST) used for radioactive waste storage since 1947. Between mid-1963 and mid-1969, 241-C-106 tank received high-heat waste, PUREX (plutonium-uranium extraction) Facility high-level waste, and strontium-bearing solids from the strontium and cesium recovery activities. In 1971, temperatures exceeding 99 C were observed in the tank, and therefore, a ventilation system was installed to cool the tank. In addition, approximately 22,712 liters of cooling water are added to the tank each month to prevent the sludge from drying out and overheating. Excessive drying of the sludge could result in possible structural damage. The current radiolytic heat generation rate has been calculated at 32 kilowatts (kW) plus or minus 6 kW. The 241-C-106 tank was withdrawn from service in 1979 and currently is categorized as not leaking. The heat generation in 241-C-106 tank has been identified as a key safety issue on the Hanford Site. The evaporative cooling provided by the added water during operation and/or sluicing maintains the 241-C-106 tank within its specified operating temperature limits. Project W-320, 241-C-106 Tank Sluicing, will mobilize and remove the heat-generating sludge, allowing the water additions to cease. Following sludge removal, the 241-C-106 tank could be placed in a safe, interim stabilized condition. Tank-to-tank sluicing, an existing, proven technology, will provide the earliest possible closure of this safety issue. The sluicing will also fulfill a Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestone to resolve the high-heat issue and demonstrate waste retrieval. The waste will be transferred to 241-AY-102 tank, a double-shell tank (DST) with greater heat load capacity than the 241-C-106 tank.

Book Radioactive Air Emissions Notice of Construction 241 ER 311 Catch Tank

Download or read book Radioactive Air Emissions Notice of Construction 241 ER 311 Catch Tank written by and published by . This book was released on 1999 with total page 22 pages. Available in PDF, EPUB and Kindle. Book excerpt: The following description, attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions & Defense Waste Section as a notice of construction (NOC) in accordance with the Washington Administrative Code (WAC) 246-247, Radiation Protection - Air Emissions. The WAC 246-247-060, ''Applications, registration and licensing, '' states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of the information listed in Appendix A, '' Appendix A (WAC 246-247-110) lists the requirements that must be addressed. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40, Code of Federal Regulations (CFR), Part 6 1, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 millirem/year total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(l), and it is requested that approval of this application will also constitute EPA acceptance of this 40 CFR 61.09(a)(l) notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided later.

Book Radioactive Air Emissions Notice of Construction

Download or read book Radioactive Air Emissions Notice of Construction written by and published by . This book was released on 1996 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as a notice of construction (NOC) for the use of a portable exhauster on 241-A-101 single-shell tank (SST) during salt well pumping and other routine activities at the tank. Approval for salt well pumping is not being requested as this is a routine activity performed to manage the waste within the SST Tank System. The primary objective of providing active ventilation to the 241-A-101 tank is to satisfy the requirements of a Los Alamos National Laboratories (LANL) Safety Analysis Report (SAR) that requires postulated accidents to remain within risk guidelines. It is anticipated that salt well pumping will release gases entrapped within the waste as the liquid level is lowered, because of less hydrostatic force keeping the gases in place. Other routine activities also have the potential to release trapped gases by interrupting gas pockets within the waste. Hanford Site waste tanks must comply with the National Fire Protection Association guidelines, which mandate that flammable gas concentration be less than 25 percent of the lower flammability limits. The LANL SAR indicates that the lower flammability limit may be exceeded during certain postulated accident scenarios. Also, the potentials for electrical (pump motor, heat tracing) and mechanical (equipment installation) spark sources exist. Therefore, because of the presence of ignition sources and the increase in released flammable gases, active ventilation will be required to reduce the ''time at risk'' while performing routine operations at the tank.

Book Radioactive Air Emissions Notice of Construction for Transition of the 241 Z Liquid Waste Treatment Facility at the Plutonium Finishing Plant  200 West Area  Hanford Site  Richland  Washington

Download or read book Radioactive Air Emissions Notice of Construction for Transition of the 241 Z Liquid Waste Treatment Facility at the Plutonium Finishing Plant 200 West Area Hanford Site Richland Washington written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Nuclear Regulatory Commission Authorization Act for Fiscal Years 1990 and 1991

Download or read book Nuclear Regulatory Commission Authorization Act for Fiscal Years 1990 and 1991 written by United States. Congress. House. Committee on Interior and Insular Affairs and published by . This book was released on 1989 with total page 14 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Notice of Construction Work in Tank Farm Waste Transfer Pit 241 UX 154 Double contained Receiver Tank

Download or read book Notice of Construction Work in Tank Farm Waste Transfer Pit 241 UX 154 Double contained Receiver Tank written by and published by . This book was released on 1999 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions & Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection - Air Emissions. WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A, '' Appendix A (WAC 246-247-110) lists the requirements that must be addressed. Additionally, the following description, attachments, and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 millirem/year total effective dose equivalent to the hypothetical offsite maximally exposed individual, and commencement is needed within a short time. Therefore, this application also is intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application also will constitute EPA acceptance of this initial startup notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2), will be provided later. The activities described in this NOC are estimated to provide a potential offsite (unabated) total effective dose equivalent (TEDE) to the hypothetical maximally exposed individual (h4EI) of 1.53 E02 millirem per year.

Book Project W 211  Initial Tank Retrieval Systems  Description of Operations for 241 AP 102 and 241 AP 104

Download or read book Project W 211 Initial Tank Retrieval Systems Description of Operations for 241 AP 102 and 241 AP 104 written by and published by . This book was released on 1999 with total page 97 pages. Available in PDF, EPUB and Kindle. Book excerpt: The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTS) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operations (DOO) defines the control philosophy for the waste retrieval system for tanks 241-AP-102 (AP-102) and 241-AP-104 (AP-104). This DOO will provide a basis for the detailed design of the Retrieval Control System (RCS) for AP-102 and AP-104 and establishes test criteria for the RCS. The test criteria will be used during qualification testing and acceptance testing to verify operability.

Book Radioactive Air Emissions Notice of Construction 340 A

Download or read book Radioactive Air Emissions Notice of Construction 340 A written by and published by . This book was released on 1997 with total page 31 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as a notice of construction pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060 and as a request for approval to construct pursuant to 40 Code of Federal Regulations (CFR) 61.96 for the removal of sludge from six storage tanks located inside the 340-A Building, which is located in the 300 Area of the Hanford Site.

Book Radioactive Air Emissions Notice of Construction  Use of a Portable Exhauster on 244 AR Vault

Download or read book Radioactive Air Emissions Notice of Construction Use of a Portable Exhauster on 244 AR Vault written by and published by . This book was released on 1997 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document serves as a notice of construction (NOC), pursuant to the requirements of Washington Administrative Code (WAC) 246-247- 060, and as a request for approval to construct pursuant to 40 Code of Federal Regulations (CFR) 61.96, for the use of a portable exhauster at the 244-AR Vault during transfers or movement of radioactive waste as part of pumping of secondary containment, tank stabilization/pumping, and other activities (i.e., transfer or pumping of radioactive waste using established procedures, entries for maintenance and inspections) within the 244-AR Vault.

Book State of Washington Department of Health Radioactive Air Emission Notice of Construction Phase 1 for Spent Nuclear Fuel Project   Hot Conditioning System Annex  Project W 484

Download or read book State of Washington Department of Health Radioactive Air Emission Notice of Construction Phase 1 for Spent Nuclear Fuel Project Hot Conditioning System Annex Project W 484 written by and published by . This book was released on 1996 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: This notice of construction (NOC) provides information regarding the source and the estimated annual possession quantity resulting from the operation of the Hot Conditioning System Annex (HCSA). This information will be discussed again in the Phase II NOC, providing additional details on emissions generated by the operation of the HCSA. This Phase I NOC is defined as construct in the substructure, including but limited to, pouring the concrete for the floor; construction of the process pits and exterior walls; making necessary interface connections to the Canister Storage Building (CSB) ventilation and utility systems for personnel comfort; and extending the multi-canister over-pack (MCO) handling machine rails into the HCSA. A Phase II NOC will be submitted for approval prior to installation and is defined as the completion of the HCSA, which will consist of installation of Hot Conditioning System Equipment (HCSA), air emissions control equipment, and emission monitoring equipment. About 80 percent of the U.S. Department of Energy's spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters, while the SNF in the K East Basin is contained in open canisters, which allow free release of corrosion products to the K East Basin water. Storage in the K Basins was originally intended to be on an as-needed basis to sustain operation of the N Reactor while the Plutonium-Uranium Extraction (PUREX) Plant was refurbished and restarted. The decision in December 1992 to deactivate the PUREX Plant left approximately 2,300 MT (2,530 tons) of N Reactor SNF in the K Basins with no means for near-term removal and processing. The HCSA will be constructed as an addition to the CSB and will contain the HCSA. The hot conditioning system (HCS) will remove chemically-bound water and will passivate the exposed uranium surfaces associated, with the SNF. The HCSA will house seven hot conditioning process stations, six operational and one auxiliary pit, which could be used as a welding area for final sealing of the vessel containing the SNF, or for neutron interrogation of the vessel containing the SNF to determine residual water content. Figures 1 and 2 contain map locations of the Hanford Site and the HCSA. 'Response to Requirement' subtitle under each of the following sections identifies the corresponding Appendix A NOC application requirement listed under WAC 246-247-1 10.

Book State of Washington Department of Health Radioactive Air Emissions Notice of Construction Phase 1 for Spent Nuclear Fuel Project   Cold Vacuum Drying Facility  Project W 441

Download or read book State of Washington Department of Health Radioactive Air Emissions Notice of Construction Phase 1 for Spent Nuclear Fuel Project Cold Vacuum Drying Facility Project W 441 written by and published by . This book was released on 1996 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: This notice of construction (NOC) provides information regarding the source and the estimated annual possession quantity resulting from operation of the Cold Vacuum Drying Facility (CVDF). Additional details on emissions generated by the operation of the CVDF will be discussed again in the Phase 11 NOC. This document serves as a NOC pursuant to the requirements of WAC 246-247-060 for the completion of Phase I NOC, defined as the pouring of concrete for the foundation flooring, construction of external walls, and construction of the building excluding the installation of CVDF process equipment. A Phase 11 NOC will be submitted for approval prior to installing and is defined as the completion of the CVDF, which consisted installation of process equipment, air emissions control, and emission monitoring equipment. About 80 percent of the U.S. Department of Energy's spent nuclear fuel (SNF) inventory is stored under water in the Hanford Site K Basins. Spent nuclear fuel in the K West Basin is contained in closed canisters while the SNF in the K East Basin is in open canisters, which allow free release of corrosion products to the K East Basin water.

Book Radioactive Air Emissions Notice of Construction for Phase 2 Spent Nuclear Fuel Canister Storage Building    Project W 379

Download or read book Radioactive Air Emissions Notice of Construction for Phase 2 Spent Nuclear Fuel Canister Storage Building Project W 379 written by and published by . This book was released on 1998 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this Notice of Construction (NOC) is to provide a rewritten NOC for obtaining regulatory approval for changes to the previous Canister Storage Building (CSB) NOCs (WDOH, 1996 and EPA, 1996) as were approved by the Washington State Department of Health (WDOH, 1996a) and US Environmental Protection Agency (EPA, 1996a). These changes are because of a revised sealing configuration of the multi-canister overpacks (MCOS) that are used to store the SNF. A flow schematic of the SNF Project is provided in Figure 1-1. A separate notification of startup will be provided apart from this NOC.

Book W 320 Department of Health Documentation

Download or read book W 320 Department of Health Documentation written by and published by . This book was released on 1998 with total page 332 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this document is to gather information required to show that Project W-320 is in compliance with Washington State Department of Health requirements as specified in Radioactive Air Emissions Notice of Construction Project W-320, Tank 241-C-106 Sluicing, DOE/RL-95-45. Specifically, that W-320 is in compliance with ASME N509-1989 (Nuclear Power Plant Air-Cleaning Units and Components) and ASME N5 10-1989 (Testing of Nuclear Air Treatment Systems) for the 296-C-006 exhaust system.

Book Nonradioactive Air Emissions Notice of Construction Use on a Portable Exhauster on 241 A 101 Tank During Salt Well Pumping

Download or read book Nonradioactive Air Emissions Notice of Construction Use on a Portable Exhauster on 241 A 101 Tank During Salt Well Pumping written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The 241-A-101 tank, a 22.9 meter 3,785,400 liter capacity SST, was constructed from the fourth generation of tank designs, which were capable of holding boiling or self-concentrating waste. Construction features a reinforced concrete shell, dome, and base with a mild steel liner covering the bottom and sidewalls. The tank has a flat bottom with a usable waste depth of approximately 9.4 meters. The tank was put into service in 1956 to store plutonium-uranium extraction (PUREX) high-level waste and organic wash waste. The waste was allowed to self-concentrate up until 1968. Tank sluicing was performed in 1969 and again in 1976 to reduce the amount of strontium and cesium, the two isotopes found to be the main heat generating sources in the tank. In 1978, the tank was reassigned for saltcake storage. The tank was taken out of service in November 1980 and partially isolated in 1982. Salt well pumping is a method used to interim stabilize SSTS. Interim stabilization is commenced once all the liquid above the solids has been removed (primary stabilization). Interim stabilization removes the gravity drainable liquid and the interstitial liquid between the solids from the SST and transfers the liquid to a double-shell tank (DST) or to a staging double-contained receiver tank (DCRT), which is subsequently transferred to a DST. Pumping is accomplished at very low flow rates, 15.1 liters per minute or less. Normally, salt well pumping is performed without the need of an exhauster. However, recent safety evaluations concluded that a minimum exhaust flow rate of 7.1 cubic meters per minute would be required to enhance the safety of the tank. Therefore, active ventilation will be part of this process for the 241-A-101 tank. This document details the Nonradioactive Air Emissions Notice of Construction for the use of a portable exhauster on Tank 241-A-101 during salt well pumping and other routine activities.