EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Proposed Plan for Remediation of the 200 ZP 1 Groundwater Operable Unit

Download or read book Proposed Plan for Remediation of the 200 ZP 1 Groundwater Operable Unit written by and published by . This book was released on 2007 with total page 32 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Proposed Interim Cleanup of the 200 ZP 1 Operable Unit at the Hanford Site

Download or read book Proposed Interim Cleanup of the 200 ZP 1 Operable Unit at the Hanford Site written by United States. Department of Energy and published by . This book was released on 1994 with total page 2 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book FEASIBILITY STUDY REPORT FOR THE 200 ZP 1 GROUNDWATER OPERABLE UNIT

Download or read book FEASIBILITY STUDY REPORT FOR THE 200 ZP 1 GROUNDWATER OPERABLE UNIT written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km2 (586 mi2) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

Book Remedial Investigation Report for the 200 ZP 1 Groundwater Operable Unit

Download or read book Remedial Investigation Report for the 200 ZP 1 Groundwater Operable Unit written by Mark E. Byrnes and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Remedial Investigation feasibility Study Work Plan for the 200 UP 1 Groundwater Operable Unit  Hanford Site  Richland  Washington

Download or read book Remedial Investigation feasibility Study Work Plan for the 200 UP 1 Groundwater Operable Unit Hanford Site Richland Washington written by United States. Department of Energy. Richland Operations Office and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site  Weldon Spring  Missouri

Download or read book Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site Weldon Spring Missouri written by and published by . This book was released on 1999 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.

Book Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site  Weldon Spring  Missouri

Download or read book Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site Weldon Spring Missouri written by United States. Department of Energy. Weldon Spring Site Remedial Action Project and published by . This book was released on 1999 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Pump and treat Ground water Remediation

Download or read book Pump and treat Ground water Remediation written by and published by . This book was released on 1996 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Final Proposed Plan for Remedial Action for the Groundwater Operable Unit  Operable Unit 2  Former Weldon Spring Ordinance Works  Weldon Spring  Missouri

Download or read book Final Proposed Plan for Remedial Action for the Groundwater Operable Unit Operable Unit 2 Former Weldon Spring Ordinance Works Weldon Spring Missouri written by and published by . This book was released on 2004 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: This proposed plan describes the remedial alternatives considered for Operable Unit 2 (OU2)' of the former Weldon Spring Ordnance Works (WSOW) and identifies the preferred alternative for remediation of groundwater.

Book New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation  Operable Unit 1 07B

Download or read book New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation Operable Unit 1 07B written by and published by . This book was released on 2007 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Book Capstone Report on the Application  Monitoring  and Performance of Permeable Reactive Barriers for Ground water Remediation  Performance evaluations at two sites

Download or read book Capstone Report on the Application Monitoring and Performance of Permeable Reactive Barriers for Ground water Remediation Performance evaluations at two sites written by and published by . This book was released on 2003 with total page 160 pages. Available in PDF, EPUB and Kindle. Book excerpt: