EBookClubs

Read Books & Download eBooks Full Online

EBookClubs

Read Books & Download eBooks Full Online

Book Powerplant Productivity Improvement Study  Historic performance of Illinois investor owned electrical generating units  project 2  task 1

Download or read book Powerplant Productivity Improvement Study Historic performance of Illinois investor owned electrical generating units project 2 task 1 written by and published by . This book was released on 1978 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Productivity Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In this task the historical performance of powerplants in Illinois was examined and the opportunities for improved powerplant productivity in Illinois was determined. The four utilities considered were the major investor-owned electric generating utilities in Illinois, i.e., Central Illinois Light Co., (CILCO), Central Illinois Public Service (CIPS), Commonwealth Edison (CECO), and Illinois Power (IP). The major findings are: (1) for evaluation purposes, the equivalent availability was judged to be the most-appropriate measure; (2) in terms of powerplant productivity, IP is among the best in the nation and, in terms of productivity from large coal units, it ranks in the top five nationally; (3) in general, the performance of coal-fired units of CILCO and CECO have been below national averages and in some cases, significantly below; (4) a review of the trends in production of all Illinois units reveals that Illinois units as a group have been generally below national averages for the respective unit classes; (5) as noted in this and other studies, productivities of the nuclear plants in Illinois have been below the national average for all comparable nuclear plants; and (6) this analysis should be updated when national 1977 and 1978 Edison Electric Institute data become publicly available.

Book Energy Research Abstracts

Download or read book Energy Research Abstracts written by and published by . This book was released on 1980 with total page 360 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Productivity Improvement Study  Current practices in Illinois utilities toward powerplant productivity  project 1  task 1

Download or read book Powerplant Productivity Improvement Study Current practices in Illinois utilities toward powerplant productivity project 1 task 1 written by and published by . This book was released on 1978 with total page 106 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book State Power Plant Productivity Programs

Download or read book State Power Plant Productivity Programs written by United States. Department of Energy. Division of Power Supply and Reliability and published by . This book was released on 1981 with total page 120 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Productivity  Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Efforts of this task indicate that powerplant productivity is a complex issue that has to take into account economic factors, equipment limitations, and system-loading characteristics as well as external constraints such as regulatory requirements. Among the specific findings are: (1) utilities in Illinois use the industry-wide measures of performance such as capacity factor, availability factor, forced outage rates etc.; equivalent availability as a measure is not in common practice; (2) several unit performance statistics are collected on a routine basis such as the daily unit status, component outage data, monthly production figures etc.; (3) identifying major causes of lost productivity appears to be a relatively simple task, but finding economically and technically acceptable corrective actions are generally more difficult; (4) selection of improvement projects, as well as evaluating their future impacts, is mostly based on operating experience and engineering judgement, with no use of formal analytical/statistical models; (5) there generally is a group in every utility - typically called the power production department - with routine responsibilities for upkeep of unit productivity; and (6) recently the Commonwealth Edison Co. has developed a procedure for utilizing the Edison Electric Institute outage data base for analyzing productivity-related questions at nuclear plants; this procedure utilizes unit nonoperating hours to measure productivity.

Book Powerplant Productivity Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Key findings from the Illinois Powerplant Productivity Improvement Study are: (1) the historic performance (equivalent availability) of large generating units in Illinois is below national average performance; (2) cost-effective opportunities to improve performance exist, and utilities pursue many of these; (3) there are no strong regulatory disincentives to the undertaking of productivity improvement projects, but no strong incentives either; (4) current utility practices, procedures, and management philosophy toward improved productivity are being strengthened; (5) areas in which immediate attention is warranted include application of reliability engineering tools to the analysis of powerplant availability and more vigorous pursuit of opportunities for performance improvements; (6) DOE systematic methodology for analysis of productivity improvement projects was demonstrated at three units and found to be useful; (7) the potential for improved productivity was estimated to be of the order of 2% in planned and forced outage rates; (8) if a 5% improvement were to be attained, cumulative (through 1990) constant-dollar benefits would be approximately $500 million; (9) formula regulatory incentive mechanisms are presently in a developmental or experimental phase, but adoption by the State of Illinois does not appear warranted at this time; and (10) the Illinois Commerce Commission can encourage improved productivity by explicitly considering recent unit performance during normal rate-case proceedings.

Book Powerplant Productivity Improvement Study  Analysis of costs and benefits for eight powerplant productivity improvement projects  project 1  task 3

Download or read book Powerplant Productivity Improvement Study Analysis of costs and benefits for eight powerplant productivity improvement projects project 1 task 3 written by and published by . This book was released on 1978 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Productivity Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1978 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: Report.--v.1. [Phase A report: Methods and techniques for determining the underlying causes and corrective actions of lost powerplants productivity.--v.2. Phase B report: Analytical techniques for modeling powerplant equivalent availability.--v.3. Phase C report: Cost and performance analysis methods.--v.4. Phase D report: Cost/benefit analysis of selected powerplant improvement programs.--Appendices 1-4.

Book Government Reports Announcements   Index

Download or read book Government Reports Announcements Index written by and published by . This book was released on 1996 with total page 458 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Government Reports Annual Index

Download or read book Government Reports Annual Index written by and published by . This book was released on 1980 with total page 900 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

Book Powerplant Productivity Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Policy options that the Illinois Commerce Commission might adopt in order to promote improved power plant productivity for existing units in Illinois are identified and analyzed. These policy options would generally involve either removing existing disincentives and/or adding direct incentives through the regulatory process. The following activities are reported: in-depth review of existing theoretical and empirical literature in the areas of power plant reliability, regulatory utility efficiency and performance incentives, and impacts of various regulatory mechanisms such as the Fuel Adjustment Clauses on productivity; contacts with other state public utility commissions known to be investigating or implementing productivity improvement incentive mechanisms; documentation and analysis of incentive mechanisms adopted or under consideration in other states; analysis of current regulatory practice in Illinois as it relates to power plant productivity incentives and disincentives; identification of candidate incentive mechanisms for consideration by the Illinois Commerce Commission; and analysis and evaluation of these candidates. 72 references, 8 figures.

Book Powerplant Productivity Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: A summary of total cumulative fuel consumption differences by fuel type through 1990 for four improvement scenarios is presented for Commonwealth Edison Company (CE) and for Illinois Power Company (IP). In all scenarios, liquid-fuel consumption is reduced. Generation is shifted to the coal and/or nuclear units for which improved availability has been assumed. For a 2% improvement in both planned (POR) and forced outage rates (FOR), a total of more than 16 million barrels of No. 6 oil will have been saved by 1990 by the two companies. This is the result of improving 10,894 MW on the CE system and 2234 MW on the IP system. For the two utilities combined, gross savings (in 1978 dollars) range from $83 million for a 1% POR improvement to $346 million for 2% improvements in both POR and FOR. In terms of their effect on ratepayers, these savings would be even greater since gross receipt taxes and other charges would be applied to a smaller-generation cost base under the improvement scenarios. Caution must be exercised however, since results do not take into consideration the costs of achieving the improved performance. The proportion of net benefits that would be passed on to ratepayers is largely dependent upon whether the utility is earning its allowed rate of return, and the frequency of rate-case filings. It was determined by both utilities that none of the improvement scenarios would lead to deferment of any planned capacity additions by 1990.

Book A Report on Improving the Productivity of Electric Powerplants

Download or read book A Report on Improving the Productivity of Electric Powerplants written by United States. Interagency Task Group on Powerplant Reliability and published by . This book was released on 1975 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Book Powerplant Productivity Improvement Study

Download or read book Powerplant Productivity Improvement Study written by and published by . This book was released on 1978 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: A methodology, distributed by DOE, may be used as a potential tool for the utility industry to assess and evaluate productivity and reliability problems of existing and future units. The model can be used to assess the impact of an improvement project or corrective action on unit productivity parameters such as heat rate, capacity factor, availability, or equivalent availability. The methodology analyzes: the effect of component redundancy on unit equivalent availability; the effect of component reliability on unit equivalent availability; and a component's outage trend to project the component's future outage rate. The first purpose of this study is to illustrate for the utilities how to apply the methodology. Thus, this report contains the analysis performed by applying the methodology at three units of Illinois power plants. The units evaluated were Wood River 5, Quad Cities 1, and Quad Cities 2. A total of 8 improvement projects were evaluated and all outage data and equations used are included in order to facilitate utility reproduction of the given results. The second purpose is to evaluate the methodology as a useful tool for individual utilities; a number of modifications are suggested.